Skip to main content

A8 (Glasgow-Greenock Section)

Volume 649: debated on Wednesday 15 November 1961

The text on this page has been created from Hansard archive content, it may contain typographical errors.

14.

asked the Secretary of State for Scotland when he intends to authorise the reconstruction of the Glasgow-Greenock section of the A.8 trunk road to provide for a dual carriageway system to meet present and future traffic requirements.

My right hon. Friend has no plans yet for starting any major reconstruction work on this road since others must take priority at present. He has, however, appointed consultants to investigate the practicability of a bypass of Renfrew serving Abbotsinch airfield.

Is the Under-Secretary of State aware that there is already considerable congestion on this road and that it is estimated that it is carrying double the traffic for which it was intended? Could the hon. Gentleman arrange for an early check to be made on these figures and make a statement as soon as possible about trying to include this road in the next estimates?

The traffic census of last August showed that there was an overload on this road, but it is building up at considerably below the general average rate. We are fairly confident that by the time the dual carriageway is built, or prior to that, there will not be a serious problem.