Mr. Gresham Cooke
asked the Minister of Transport what schemes under the road programme, costing over £100,000, were started in the six months ended 31st December, 1961; and what are the estimated completion date and total cost of each.
Mr. Marples
The schemes are:
Estimated Completion Date
| Estimated Total Cost (including land)
| |
£ | ||
Classified Roads: Other Urban Areas—continued
| ||
Inner Ring Road, Derby Section 3. Construction of dual carriageways and 2 roundabouts. London Road-Osmaston Road. (Derbyshire C.C.) | Spring, 1963 | 186,000 |
A.505. Widening of Church Street, Dunstable. (Beds. C.C) | Spring, 1962 | 241,000 |
Classified Roads: Elsewhere
| ||
A.412. Dual carriageways Wexham Park Lane to George Green. (Bucks. C.C.) | Autumn, 1962 | 119,000 |
A.5I. Rugeley-Lichfield. (Widening.) (Staffs. C.C.) | Autumn, 1962 | 113,000 |
Sandfields Road, Port Talbot. (Glamorgan C.C.) | End of 1963 | 150,000 |
Liverpool-Warrington Road Diversion (Fords Development) | ||
(i) Lancashire Section dualling between Higher Road A.2562 and Liverpool C.B. Boundary (Liverpool C.B.C. and Lanes. C.C.) | Spring, 1962 | 164,000 |
(ii) Liverpool Section dualling Lanes. C.C. Boundary—eastern end of Speke Boulevard. (Liverpool C.B.C. and Lanes. C.C.) | Spring, 1962 | 222,000 |
Turpin Green Lane Extension and Bow Lane Diversion. (Lanes, C.C.) | Summer, 1963 | 123,000 |
Road 4, Stage 2: Basildon New Town. (Essex C.C.) | Early 1963 | 177,000 |