Skip to main content

Al

Volume 136: debated on Tuesday 5 July 1988

The text on this page has been created from Hansard archive content, it may contain typographical errors.

To ask the Secretary of State for Transport what is the estimated current daily flow on the Al; and what were the comparable figures ( a) 10 years ago, and (b) expected when the road was opened.

The table sets out estimated daily traffic flows, currently and 10 years ago, for those stretches of the Al for which such information is available. Information on expected flows at the time of opening is not available except at disproportionate cost. The figures are annual average daily traffic flows.

19781988
London AreaN/A53,000
M25-Hatfield24,50055,000
Hatfield Tunnel154,00063,000
Welwyn-Stevenage36,00059,000
Ste venage- Baldock35,50055,000
Baldock-BiggleswadeN/A27,000
Biggleswade-Black Cat21,00032,000
Black Cat-St. Neots25,50036,000
St. Neots-Alconbury20,50029,500
Alconbury-Peterborough22,00045,000
Peterborough-Stanford22,50029,000
Grantham Bypass212,300322,600
Newark Bypass216,600322,600
Ferrybridge430,500340,600
Dishforth427,500337,600
North of Darlington520,00024,800
A689 JunctionN/A628,700
Washington Services541,600647,700
North of Tyne Tunnel520,700625,800
North of Alnwick55,10066,500

1 Refers to old road. Hatfield Tunnel forecast 50,000 to 57,000 in opening year (1987).

2 1975.

3 1987.

4 1977.

5 1979.

6 1986.