Skip to main content

Park-And-Ride Schemes

Volume 406: debated on Tuesday 3 June 2003

The text on this page has been created from Hansard archive content, it may contain typographical errors.

To ask the Secretary of State for Transport if he will list the Park and Ride schemes which have been given approval since 1 January 1997, in each

AuthoritySchemeExpected start date
BradfordSouth Bradford Integrated Transport ImprovementsNovember 2001
CheshireChester-Deeside Transport SchemeMay 2004
DoncasterA638 Great North Road Quality Bus CorridorApril 2002
DurhamBelmont InterchangeOctober 2003
Tyne & Wear PTAFour Lanes End InterchangeApril 2002
WiltshireSalisbury Integrated Transport MeasuresApril 2002
The provision of parking facilities, including Park and Ride, is a matter for the local highway authority and rail operators. In addition to the major schemes, a number of smaller schemes have been proposed/ implemented by the local authorities as part of the local transport strategy. These have included proposals for extension of existing sites or new sites for both bus-based and rail-based schemes. These are summarised in the following table. Details of the smaller schemes, including proposed timetables, are not kept centrally.

Type of scheme20012002
Bus-based P&R—new711
Bus-based P&R—extension67
Rail-based P&R—new46
Rail-based P&R—extension78