To ask the Secretary of State for Transport when the concrete surface of the M25 between junctions 8 and 9 is to be replaced with quieter surfacing. (87082)

The M25 between junctions 8 and 9 will not require resurfacing for maintenance needs within the period of the Agency’s current five year forward programme. However when it does need to be resurfaced a quieter surfacing will be used as a matter of course.