To ask the Secretary of State for Transport when the M62 motorway between junctions 35 and 34 will be resurfaced; and what lane closures will be required. (92927)

The Highways Agency has no plans to carry out major resurfacing works on the M62 between junctions 35 and 34 in the near future. The following minor resurfacing works, to maintain the section in a safe condition, will be undertaken during November 2006:

Patching work to the westbound carriageway near Whitley Bridge requiring a lane 1, 2 and 3 closure with hard shoulder running. Work commencing 20 November.

Patching work to the westbound carriageway at Wynn Railway Bridge near Junction 35 Langham Interchange requiring a lane 1, 2 and 3 closure with hard shoulder running. Work commencing 6 November.

A 400-metre stretch of resurfacing in Lane 1 westbound, west of Junction 35 Langham Interchange requiring lane 1 and 2 closure. Work commencing 6 November.

All works will be carried out overnight between 8pm and 6am.