The most recent estimate (at 2005 prices) for replacement of the concrete surface on this length of A50 was in excess of £9.9 million. There is no scheme programmed for resurfacing the A50 between Blythe Bridge and Uttoxeter in the foreseeable future, so no current estimate is available.