Waste water systems, including septic tanks, are subject to the requirements in part H of the building regulations. Part H was last revised in 2002 and the related approved document specifically refer to cover to septic tanks. The guidance provided says:
“The access (cover) should be lockable or otherwise engineered to prevent personnel entry.”