Skip to main content

Floods: Greater London

Volume 463: debated on Monday 3 September 2007

To ask the Secretary of State for Environment, Food and Rural Affairs what flood prevention measures were put into place in each London borough in each of the last five years. (153567)

The Environment Agency is the principal authority with responsibility for flood risk management in England, although local authorities also carry out works on less critical watercourses. The following tables show capital improvement works carried out by the agency only and exclude maintenance and operational work.

1. Projects to renew or improve fluvial (non-tidal) defences on northern and southern tributaries of the River Thames.

1.1 North East Thames

Flood Prevention Renewals

Location

London Borough

Cost (£)

2004-05

Prince Edward Playing Field Flood storage area on the Edgware Brook,

Cannons Park

Harrow

1,200,000

2004-05

Sixgates Bank and retaining walls repair works on the River Roding.

Barking

Barking and Dagenham.

800,000

2005-06

Priory Park Increase size of Flood Storage Reservoir.

Stanmore

Harrow

800,000

2005-06

Stonywood lake FSA Reconstruction of dam and increase size of Flood Storage Area on the Deans Brook

Mill Hill

Barnet

1,400,000

2005-06

River Lee FRC Walthamstow Major repair of existing channel of the River Lee Flood Relief channel

Walthamstow

Walthamstow

1,200,000

2005-06

Pymmes Brook Culvert. Removal of a culvert which presented a threat to blocking the Pymmes Brook

Edmonton

Enfield

1,300,000

2004-05

Low Hall Trash Screen. Reconstruction of trash screen

Walthamstow

Walthamstow

100,000

2004-05

Field End Road Trash Screen Reconstruction of trash Screen

Eastcote

Hillingdon

100,000

2005-06

Wealdstone Brook Bank works Repair to banks to prevent collapse and blockage of the Wealdstone Brook

Kenton

Harrow

100,000

2004-06

Mayes Brook Sluices Reconstruction of the Sluice gate and control structure for the flood storage area

Barking

Barking and Dagenham

900,000

2005-06

River Pinn Diversion Removal of culvert, on the river Pinn.

Hatch End

Harrow

200,000

2004-05 2006-07

Washlands Flood Storage Reservoir Reconstruction of the flood storage reservoir and increase in capacity

Dagenham

Barking and Dagenham

4,400,000

Total

12,500,000

1.2 South East Thames

Flood Prevention Renewals

Location

London Borough

Cost (£)

2002-07

River Quaggy Flood Alleviation Scheme

River Quaggy

Greenwich and Lewisham

18,000,000

2007-08

Refurbishment of three trash screen sites on the Beverley Brook

Ashlone Warf, Putney, Richmond Park, and New Maiden

Richmond and Merton

150,000

2007-08

Refurbishment of EA Trash screen -Upper Elmers End

Beckenham, St James Stream

Bromley

15,000

2007-08

Refurbishment of EA Trash Screen

Kyd Brook

Bromley

51,000

2007-08

Refurbishment of EA Trash Screen

Ravensbourne

Bromley

34,000

2005-07

Channel reprofiling and increased flood storage

Hogsmill near A240

RB Kingston upon Thames

120,000

2006-07

Channel reprofiling, creation of flood banks and increased flood storage

Ladywell Fields Lewisham

Lewisham

100,000

2002-04

Channel reprofiling, creation of flood banks, increased flood storage and flood warning improvements

Chinbrook Meadows

Lewisham

250,000

2002

Channel reprofiling and increased flood storage

Shaftesbury Park

London borough of Bromley

90,000

2002-03

Channel reprofiling and increased flood storage

Norman Park

London borough of Bromley

180,000

2005-07

Channel reprofiling, creation of flood banks, increased flood storage, construction of new trash screen and flood warning improvements

Upstream of Hayes Lane Bromley

London borough of Bromley

450,000

2003-06

Channel reprofiling and increased flood storage

Crayford Marshes Erith

London borough of Bexley

250,000

2005-06

Raising of flood defences, improvements in capacity of structure and flood warning improvements

Flood Siphon on River Graveney at Colliers Wood

London borough of Merton

900,000

2004-05

Banks stabilisation and weir removal.

River Wandle outside Garrett Lane Depot

London borough's of Merton and Wandsworth

120,000

Total

20,710,000

2. Projects to renew or improve Thames Tidal defences along the northern and southern banks of the River Thames.

Flood Prevention Renewals

Location

London Borough

Cost (£)

2002-03

Strengthening and renewal of masonry flood defence wall (tidal)

Strand on the Green

Hounslow

782,000

2004-05

Renewal of a deficient flood defence wall (tidal)

Upstream of Barking Barrier

Barking and Dagenham

92,000

2005-06

Renewal of tidal flood defence wall

New England Wharf

Barking and Dagenham

1,300,00

2005-06

Renewal of tidal flood defence wall

Frogmore Estate

Barking and Dagenham

425,000

2005-06

Renewal of tidal flood defence wall

Anchor Bay Wharf

Bexley

770,000

2006-07

Renewal of tidal flood defence wall

Old British Gas Site

Barking and Dagenham

35,000

2006-07

Renewal of masonry flood defence wall (tidal)

Four Gates Sluice

Barking and Dagenham

460,000

2006-07

Renewal of tidal flood defence earth embankments

Dartford Creek Frontages

Bexley

2,600,000

2006-07

Renewal of tidal flood defence steel sheet pile wall

Marley Water Proofing Frontages

Barking and Dagenham

600,000

2007-08

Renewal of tidal flood defence steel sheet pile wall

Marley Water Proofing Frontages

Barking and Dagenham

700,000

2007-08

Renewal of tidal flood defence earth embankments

Dartford Creek Frontages

Bexley

2,500,000

2007-08

Renewal of tidal flood defence walls

Isle of Dogs Frontages

Tower Hamlets

1,000,000

Total

11,264,000