A fleet of new trains is due to be introduced on the Peterborough to London route as part of the final stage of the Thameslink Programme in December 2015. In the meantime, the December 2008 timetable will see an extra 16 carriages on London to Peterborough and Cambridge routes. This will allow key peak services to provide an additional 1,779 and 2,490 seats in the morning and evening peaks respectively.