None. Shift patterns have no material impact on the size of the Regional Control Centres. The size of the buildings was based primarily on the number of staff required to provide a resilient 24 hour operation.
Shift patterns for regional control centre staff will be the responsibility of the eight regional Local Authority Control Companies and the London Fire and Emergency Planning Authority (LFEPA).