There is no plan to close the South London Line. However, during the period of construction works at London Bridge to deliver the Thameslink Project, it is unlikely to be possible to operate direct trains between Denmark Hill and London Bridge.
There is no plan to close the South London Line. However, during the period of construction works at London Bridge to deliver the Thameslink Project, it is unlikely to be possible to operate direct trains between Denmark Hill and London Bridge.