I have been asked to reply.
The Nuclear Installations Inspectorate of the Health and Safety Executive (HSE) has engaged a range of external bodies and individuals to assist it with various technical aspects, process assurance and organisation. The proportion value of each consultancy contract recovered in fees as of 31 December 2008, and the percentage value expected to be recovered under the fee regulations is as follows:
Contractors: (listed in columns 1431W) Cost Amount recovered at 31 December 2008 The proportion value of each contract recovered Recoverable IAEA (International Atomic Energy Agency) 229,879.00 230,267.61 100 100 Washington E and C Ltd 70,000.00 25,000.00 36 100 EPRI 57,144.00 13,471.60 24 100 Health Protection agency (formerly NRPB) 16,564.40 16,560.81 100 100 Morson International 14,000.00 8,231.70 59 100 Imperial College London 800.00 800.00 100 100 OECD-NEA 352,312.84 39,672.30 11 100 AMEC NNC 19,314.00 6.037.80 31 100 Atkins Nuclear 22,483.02 4,905.48 22 100 Other Contractors (used since) — — — — DYCODA, LLC 10,000.00 6,499.50 65 100 Jacobsen Engineering Ltd. 104,400.00 0.00 0 100 Serco Assurance 59,975.00 58,010.92 97 100 University of Liverpool 2,605.81 2,606.07 100 100 VTT Technical Research Centre Finland 66,600.00 70,403.02 106 100 Process Review Board: (column 1432W) — — — — David Hughes 12,500.00 15,683.95 125 100 John Raine 15,016.00 11,508.21 77 100 Bernard Whittle 12,155.00 8,565.60 70 100 Phillip Woodward 12,155.00 7,685.20 63 100 Project Assurance Officer: (column 1432W) — — — — James Furness 29,500.00 3,848.96 13 100
Additional costs above contract value for VTT and David Hughes were incurred as a result of contract extension.
The variance on the IAEA contract is due to currency exchange rate and bank charges.
Values in table are contract values not annual costs.