The information requested is as follows:
£10,241,314 by 31 March 2009. This is made up of £1,351,600 from private sector sponsors; £8,889,714 from public sector sponsors.
The design and building costs of the pavilion are £13.8 million, including a contingency of £1.8 million. The cost to the public purse of the pavilion will be this sum minus a share of sponsorship from the private sector.