[holding answer 24 March 2009]: The average waiting times since the start of the current Scheme in 2005 until 28 February 2009 are detailed in the following table. These waiting times are within the Department’s contractual guidelines, which state that heating measures will be installed within 120 days of survey and insulation measures within 40 days.
2005-06 2006-07 2007-08 2008-09 Heating Installation 66.0 days 81.9 days 63.8 days 64.7 days Insulation Installation 28.2 days 32.7 days 27.4 days 35.8 days