A19: North Tyneside

Volume 506: debated on Friday 5 March 2010

To ask the Minister of State, Department for Transport if he will take steps to ensure that the proposed improvements to the junction of the A1058 and A19 are concluded in a way that makes appropriate provision for further future improvement works on the A19 to be carried out, with particular reference to traffic flow arrangements during any period of construction. (320807)

The proposed improvements by the Highways Agency to the roundabout where the A1058 slip road and the A19 meet are an interim scheme designed to relieve congestion at the roundabout in the short term until a major improvement scheme can be delivered. In the Highways Agency's contract for these works, there will be a requirement to maintain two lanes in both directions for traffic on the A19 during peak periods.

By increasing the available road space at the junction, this scheme should make it easier to manage traffic flow during the construction of further future improvements, such as the major improvement scheme for the Interchange.

During the development of the interim scheme, discussions have been held with the designer of the major improvement scheme to ensure that there is a minimum of abortive work, and that the two schemes are compatible. The precise traffic management requirements for the major improvement scheme will not be decided until a contractor is appointed, but it is envisaged that the scheme can be constructed without major disruption, with two lanes maintained in both directions for traffic on the A19 and A1058 Coast Road during peak periods.