Skip to main content

Offshore Energy Grids

Volume 748: debated on Tuesday 16 April 2024

The Minister will be aware of the Norwich to Tilbury pylon proposals, which will put 50-metre pylons through swathes of the Norfolk, Suffolk and Essex countryside. He will also be aware that the recent electricity system operator review indicated that it will soon be cost-neutral to have an offshore option for that same energy transition, and that multiple points for connecting offshore wind turbines to the grid are facing planning problems. Will he do what he can to engage with National Grid and get it to do the right thing and look at a cost-neutral option of offshore transmission, rather than the current onshore proposal?

My hon. Friend has a long-standing record of making powerful suggestions on behalf of his constituents and neighbouring constituencies on this important issue. The ESO’s recent study considered a total of a nine alternative options for transmission routes in East Anglia, including three predominantly offshore options and two hybrid onshore and offshore options. It is important that we try to work with communities.