Written Answers to Questions
Monday 17 July 2006
Transport
A127
The A127 is not a trunk road and so is the responsibility of local highway authorities; these are Southend on Sea borough council for the section of the road within the borough boundary and Essex county council for the section beyond to Basildon. Plans for future improvements to the road, and details of any which have already been carried out, are therefore matters for these authorities.
A2 Roadworks
When assessing the effect on holiday and business traffic of the essential safety works on the A2 at Boughton, the Highways Agency has considered average daily traffic flows and the variation of traffic flows in the peak and off peak hours.
No material differences in average daily flows were found for July, August and September, with August flows being some 3 per cent. lower than July and September. This indicates that there is no significant summer peak in traffic flows.
In terms of the variation of traffic flows in the peak and off-peak hours, after 9.30 am until 4 pm one lane will provide sufficient capacity, enabling one lane to be closed for the roadworks.
A3 Tunnel (Hindhead)
[holding answer 14 July 2006]: The Inspector’s report will be published with the decision on the scheme taken jointly by the Secretary of State for Transport, the Secretary of State for Communities and Local Government and the Secretary of State for Environment, Food and Rural Affairs. This will be issued soon and convey whether the Inspector’s recommendations have been accepted.
Car Journeys
[holding answer 13 July 2006]: The number of car trips generated by each new house built is considered to be the same as the number of car trips generated by existing houses and, in Great Britain, is approximately nine trips per week.
Underlying this average are trip rates for different categories of households using information from the National Travel Survey. A key determinant of trip rate is the number of cars owned and the location of the household. For existing households in Kettering and Great Britain, the averages for households by numbers of cars owned is tabled as follows:
Number of cars owned by household Average car trips made in Kettering per week Average car trips made in Great Britain per week 0 4 4 1 7 8 2 plus 14 15
It should be noted that households with no car can still have a car available to travel. For example, they can hire a car or have access to a company car.
Clifton Suspension Bridge
Since the coming into force of the Clifton Suspension Bridge Act 1952, toll charges at the Clifton Suspension Bridge have been revised three times: in 1976, 1982 and most recently 2003. The Department has no record of whether inquiries were held for the 1976 and 1982 toll revisions. The 2003 toll revision application received no objections and was considered and approved without the need for a local inquiry.
The operator of the Clifton Suspension Bridge and the Trustees of the Clifton Suspension Bridge, applied to the Secretary of State Department in October 2005 for an order to revise the maximum tolls for using the bridge. Five objections have been received to this application. The trust has been advised that if it wishes to continue with its application, there will have to be an inquiry. No date, as yet, has been set for this inquiry.
High Occupancy Vehicle Lanes
It is currently anticipated that the dedicated high occupancy vehicle (HOV) lanes on the M1 would be positioned in the outside lane, i.e. adjacent to the central reservation in both directions. However, the final decisions on how the proposals for HOV lanes at this location will be taken forward will be made only once the Highways Agency has completed further work to elaborate the details of the proposed scheme.
Highways Agency
A single figure for how much has been spent is not held centrally.
The Highways Agency's use of minimum dig or trenchless technology is limited to thrust-boring beneath carriageways where existing cross-carriageway ducts are unserviceable. When undertaking works for the installation of cables, ducts or underground services in the verges of its roads, it installs armoured cables or ducts in trenches in accordance with BS7671, at a sufficient depth to avoid cables or ducts being damaged by any reasonably foreseeable disturbance of the ground.
M6
The Heysham scheme does not yet have scheme approval but Ministers have agreed with the region’s recommendation that it may receive funding in the next three years.
The Department’s provision of funding will, of course, be subject to the scheme securing all necessary statutory powers, demonstrating sufficient value for money, and being supported by a satisfactory business case in line with the departmental requirements.
Pavement Parking
There is no specific national legislation which proscribes vehicle parking on pavements. However, local traffic authorities can make traffic regulation orders, under powers in the Road Traffic Regulation Act 1984, to both ban pavement parking in certain areas and also allow specific exemptions from the ban.
Section 137 of the Highways Act 1980 makes it an offence to obstruct a highway without lawful authority. The pedestrian footway is part of a highway. The police may issue a fixed penalty notice for such obstruction. However, in London, by virtue of section 8 of the London Local Authorities and Transport for London Act 2003, authorised officers of borough councils and Transport for London are also empowered to issue a fixed penalty notice for the offence of obstruction under section 137 of the 1980 Act.
Speed Limits
Local highway authorities have the power to set speed limits at an appropriate level. All changes of speed limit are required by law to be clearly signed to allow drivers ample time to adjust their speed accordingly and drivers are required to know the speed limit in force at any given time. It is important to retain national consistency.
Leader of the House
Cabinet Committees
All Bills are considered by the Ministerial Committee on the Legislative Programme (LP), whose terms of reference are “to consider legislation and related matters”. Membership at the time was as follows:
Lord Privy Seal and Leader of the House of Commons (Chair)
Deputy Prime Minister and First Secretary of State
Secretary of State for Transport and Secretary of State for Scotland
Secretary of State for Defence
Parliamentary Secretary to the Treasury and Chief Whip
Home Secretary
Secretary of State for Northern Ireland and Secretary of State for Wales
Minister without Portfolio
Leader of the House of Lords and Lord President of the Council
Secretary of State for Constitutional Affairs and Lord Chancellor
Chancellor of the Duchy of Lancaster (Minister for the Cabinet Office)
Chief Secretary to the Treasury
Chief Whip, Lords, Captain of the Honourable Corps of Gentleman-at-Arms
Attorney-General
Advocate-General
Deputy Leader of the House of Commons.
Parliamentary Questions
All Ministers recognise the obligation, deriving from the decisions of the House of 18 December 1972, that a written question tabled for a named day should receive an answer on that day and an ordinary written question should receive a substantive response within a working week of it being tabled. I attach great importance to the timeliness of responses to parliamentary questions tabled in the House and, as I have indicated to the House, I have raised the matter directly with ministerial colleagues.
I also refer the hon. Member to the answer I gave to the hon. Member for Wellingborough (Mr. Bone) on 10 July 2006, Official Report, column 1560W.
Prime Minister's Questions
(2) what estimate he has made of the number of Prime Minister's question sessions likely to be held in 2006.
The information is available by parliamentary session. The number of days on which oral questions to the Prime Minister were taken in each session is given in the following table. The figures for sessions for the period before 1997 to 98 are not comparable with those subsequently. The arrangements for Prime Minister's questions were changed at that time, with twice weekly fifteen minute slots being replaced by one weekly thirty minute slot so that no less time is spent in the Chamber. To make a more accurate comparison a table of the approximate hours involved is also given.
Session Number of sessions Approximate number of hours involved Total sittings days 1989-90 62 15.5 167 1990-91 61 15.25 160 1991-92 (short session) 32 8 83 1992-93 (long session) 89 22.25 240 1993-94 59 14.75 154 1994-95 65 16.25 159 1995-96 61 15.25 146 1996-97 (short session) 35 8.75 86
Session Number of sessions Approximate number of hours involved Total sittings days 1997-98 (long session) 50 25 241 1998-99 32 16 149 1999-2000 35 17.5 170 2000-01 (short session) 17 8.5 83 2001-02 (long session) 42 21 201 2002-03 37 18.5 162 2003-04 36 18 157 2004-05 (short session) 14 7 65
The number for the 2005-06 session so far (up to and including Wednesday 12 July) is 41 (20.5 hours). Given the planned dates for further sittings so far announced, four more Prime Minister's questions days can be expected up to the end of October. The number of such days for the remainder of the session, and for the beginning of the next session, will be dependent on the dates for prorogation and the Christmas recess.
Sitting Days
(2) what estimate he has made of the number of days the House is likely to sit in 2006; and how many days are expected to be allocated for private Members' Bills.
The information is available by parliamentary Session. The number of days on which the House sat in each Session, together with the number of private Members' days, is given in the table. Private Members' days include days allocated to private Members' Bills and (up to 1993-94) balloted private Members' motions. (Balloted private Members' motions were ended after that Session, in favour of greater opportunities for Back-Bench adjournment debates).
Session Private Members' days Total sitting days 1989-90 24 167 1990-91 22 160 1991-921 12 83 1992-932 24 240 1993-94 23 154 1994-95 13 159 1995-96 13 146 1996-971 7 86 1997-982 13 241 1998-99 13 149 1999-2000 13 170 2000-011 8 83 2001-022 13 201 2002-03 13 162 2003-04 13 157 2004-051 4 65 1 Short Session. 2 Long Session.
The number of sitting days for the 2005-06 Session up to and including 14 July is 182, of which 12 have been allocated to private Members' Bills. Given the planned dates for further sittings so far announced, 21 more sitting days can be expected up to the end of October, of which one would be allocated to private Members' Bills. The number of sitting days for the remainder of the Session, and for the beginning of the next Session, will be dependent on the dates for prorogation and the Christmas recess.
Summer Recesses
The total number of days (including weekends and bank holidays) between the rise of the House in July and the return in October in each year since 1990, excluding sitting days, was as follows:
Number of days 1990 178 1991 80 1992 292 1993 82 1994 87 1995 88 1996 81 1997 87 1998 377 1999 83 2000 86 2001 483 2002 581 2003 677 2004 770 2005 75 2006 875 1 Excludes sittings on 6 and 7 September. 2 Excludes sittings on 24 and 25 September. 3 Excludes sittings on 2 and 3 September. 4 Excludes sittings on 14 September and 4 and 8 October. 5 Excludes sitting on 24 September. 6 Excludes September sitting 8 to 18. 7 Excludes September sitting 7 to16. 8 Planned.
House of Commons Commission
Accommodation
Evidence on office space allocation and occupancy was submitted to the Administration Committee's inquiry into House of Commons Accommodation earlier this year. This evidence is published with that Committee's Third Report of the Session, HC 1279. The answer that follows is based on that information, which represents a sample at a given moment in time.
(a) The Accommodation Whips have approximately 14,800 sq m of office space available to allocate to Members, an average of 22.9 sq m per Member. In practice, however, some of this accommodation is unoccupied or occupied by Members' staff. Of the office space currently used by Members, the average area available for each Member is 14.3 sq m.
(b) and (c) Of the total office space available to the Accommodation Whips, 1,300 sq m is designated ministerial accommodation, an average of 16.9 sq m per Minister. This leaves 13,500 sq m of office space not designated ministerial accommodation which the Accommodation Whips have available to allocate to other hon. Members. However, Ministers also occupy some Members' accommodation not designated for Ministers, while some ministerial rooms are occupied by Members' staff.
(d) The average space available to individual Members' staff is estimated at 9.2 sq m per person, based on 1,230 desk spaces in areas allocated by the Serjeant at Arms and in Members' accommodation.
(e) 1,735 staff of the House, 1,257 of whom are desk-based, occupy 13,140 sq m of office space, giving an average density of 7.6 or 10.5 sq m per person depending on the method of calculation used. Disaggregated information is not held on space occupied by senior staff of the House.
The houses are structurally unsuitable for use as offices.
No estimate of the annual rental value of these properties has been made. Because they are physically part of the secure Parliamentary Estate, it would not be feasible to offer the properties for rent.
Senior Staff Appointments
The Clerk of the House is appointed by the Crown under letters patent on the recommendation of the Speaker and the Prime Minister. The posts of Clerk Assistant and Serjeant at Arms are also Crown appointments. Under section 2(1) of the House of Commons (Administration) Act 1978, all other appointments (other than Mr. Speaker's personal staff) are made on the authority of the House of Commons Commission. The Commission has delegated these powers of appointment to Mr. Speaker in relation to posts of head of Department (and, in some cases, their deputies) and to heads of Department for the remainder. These appointments are made on the basis of internal or external competition, as appropriate.
Northern Ireland
Building Regulations
The building regulations require statutory notice of certain works to facilitate inspection of such works. However, they do not require the statutory inspection of those works. Building control officers have the powers to inspect the construction of a building at any reasonable time to ensure compliance with the building regulations.
Dangerous Driving
Statistics on the number of persons convicted of dangerous driving in 2005 are not yet available.
In 2004, 349 persons were convicted of ‘dangerous driving’; an additional 18 were convicted of grievous bodily harm by dangerous driving and a further six of death by dangerous driving. It is not possible to determine how many of these related to restricted drivers.
Dentistry
The information requested is provided in the following tables. Information broken down by Health and Social Services Board can only be given for 2002-03, 2003-04 and 2004-05.
2000-01 Total 47,602.0 48,019.4 15,145.7 31.5 32,873.7 2001-02 Total 49,805.5 50,254.7 16,041.0 31.9 34,213.8 2002-03 HSS Board Eastern 21,338.3 21,601.1 7,360.1 34.1 14,241.0 Northern 12,822.0 12,907.1 4,820.7 37.3 8,086.4 Southern 9,208.1 9,267.4 3,013.7 32.5 6,253.8 Western 7,865.2 7,946.2 1,634.0 20.6 6,312.1 Total 51,233.6 51,721.8 16,828.5 32.5 34,893.3 2003-04 HSS Board Eastern 21,223.2 21,762.0 7,299.0 34.0 14,463.0 Northern 12,648.4 12,691.0 4,711.0 37.0 7,980.0 Southern 9,306.9 9,369,0 3,047.0 33.0 6,322.0 Western 8,350.5 8,500.0 1,570.0 18.0 6,930.0 Total 51,529.1 52,322.0 16,627.0 32.0 35,695.0 2004-05 HSS Board Eastern 22,030.7 22,646.0 7,485.0 33.0 15,161.0 Northern 12,756.2 12,948.0 4,753.0 37.0 8,195.0 Southern 9,329.0 9,439.0 3,112.0 33.0 6,327.0 Western 7,439.7 7,595.0 1,446.0 19.0 6,149.0 Total 51,555.7 52,627.0 16,797.0 32.0 35,830.0 Notes: 1. Gross cost of treatments will include management fees such as treatment on referral fees and as such will differ from gross cost of items of service. 2. The patient, unless exempt, pays 80 per cent. of the cost of treatment, up to a maximum of £384. Source: Central Services Agency
Dessie O'Hare
PSNI confirms that there are no formal investigations ongoing in relation to this individual although he remains the subject of attention by the PSNI Historical Enquiries Team (HET) and their ongoing process.
Elections (Public Expenditure)
£3.6 million public expenditure was incurred in organising the 2005 local government and general election in Northern Ireland. £1.8 million was spent by district councils and £1.8 million by the Electoral Office.
Electronic Listening Devices
The hon. Member should be aware that it is not Government policy to comment on specific national security and intelligence matters.
Environment and Heritage Service
I have been asked to reply.
The Public Prosecution Service prosecutes cases submitted to it by the Environment and Heritage Service in Northern Ireland. No figures are available for the total cost of bringing such cases.
In those cases prosecuted by the PPS over the last three years, the total of fines imposed were:
£ 2003 23,125 2004 32,525 2005 29,625
Festivals
Details of the public monies allocated to the (a) West Belfast Festival and (b) Gasyard Feile in Londonderry in each of the last two years is given in the following table:
Financial year West Belfast Festival (£) Gasyard Feile 2004-05 360,037.95 0 2005-06 273,768.01 0
Historical Enquiry Team
I am advised by the Historical Enquiry Team, which only became operational in January 2006, that to date there have been no prosecutions resulting from the review of unresolved deaths undertaken since then and that due to the reinvestigation process, where relevant, it is too early to tell if any prosecutions are likely.
It has always been acknowledged that given the time that has passed for a number of cases, the number of prosecutions expected from the review of unresolved deaths is likely to be small. However the aim of the Historical Enquiry Team is to work with the families of victims to answer their questions and provide resolution, where possible, whether it is through judicial or non-judicial means.
Independent Treatment Centres
The information requested is not held centrally and will take some time to collate. I will write to the hon. Member with the relevant information as soon as it becomes available and place a copy in the Library.
Substantive answer from Shaun Woodward to Lady Hermon:
The number of operations, by type, which were carried out in independent sector treatment centres in Northern Ireland is not available. However, the number of operations, by specialty, carried out in independent sector treatment centres in Northern Ireland during the financial year 2005-06, is shown in the table as follows.
Specialty Number of patients Dermatology <5 ENT 14 General Surgery 141 Gynaecology <5 Neurosurgery 40 Ophthalmology 321 Paediatric Surgery 46 Plastic Surgery 653 Trauma and Orthopaedics 212 Urology 172 NI total 1,603 Notes: Figures are for the financial year 2005-06. Includes patient transferred for both in-patient and day case. Figures include Board Transfers, Group 2 Transfer and Special measures (NTPOC). Please note that cell sizes that have a value of less than five have been masked in order to help protect confidentiality. Source: Health and Social Services Boards
Landfill Sites
In 2005, there were 74 licensed landfill sites in Northern Ireland. No sites were allowed to accept hazardous waste, although there are 58 hazardous waste facilities where such material can be processed for off-site shipping, but not landfilled. In 2005, none of the 74 licensed landfill sites in NI were licensed to bury hazardous waste.
Of the 32 licensed landfill sites inspected by officials from the Environment and Heritage Service, none were found to have accepted hazardous or toxic waste.
Medical Services
The information requested is detailed in the following table.
Number General practices Dental surgeries Ophthalmic practices Pharmacies 2001 1359 n/a n/a 1509 2002 1367 n/a 223 1 1508 2003 3364 n/a 2235 1509 2004 1366 3362 2231 1511 2005 1364 1363 2236 1510 n/a = Not available. 1 October. 2 March. 3 November. Source: Central Services Agency.
The information requested for parts (i): (a), (b) and (c) is detailed in Table 1. The information for (i): (d) is not available as the Central Services Agency does not hold information on the number of pharmacists in Northern Ireland. The information requested for (ii): (a) and (b) is available for a restricted number of years and is detailed in Tables 2 and 3 respectively. The information for (ii): (c) and (d) is not available.
General practitioners Dentists Optometrists 2001 162.81 2239.84 124.03 2002 163.42 240.61 126.23 2003 363.20 240.88 126.14 2004 163.03 142. 80 127.30 2005 163.38 144.61 129.35 1 October. 2 April. 3 November. Notes: 1. NISRA population mid-year estimates have been used to calculate total number per 100,000 population. 2. Population mid-year estimate for 2004 was used for 2004 and 2005 calculation. Source: Central Services Agency.
Number Eastern board Northern board Southern board Western board November 2003 64.62 58.68 63.63 66.24 October 2004 64.60 59.18 62.54 65.76 October 2005 65.21 59.64 63.16 65.07 Notes: 1. The number of GPs by board area is not available for 2001 and 2002. 2. NISRA population mid-year estimates have been used to calculate total number per 100,000 population. 3. Population mid-year estimate for 2004 was used for 2004 and 2005 calculation. Source: Central Services Agency.
Number Eastern board Northern board Southern board Western board October 2004 48.8 44.0 44.5 40.5 2005 50.6 44.7 48.2 41.9 Notes: 1. The number of dentists by board area is not available for 2001, 2002 and 2003. Dentists can work in more than one board area, so may be counted more than once. 2. NISRA population mid-year estimates have been used to calculate total number per 100,000 population. 3. Population mid-year estimate for 2004 was used for 2004 and 2005 calculation. Source: Central Services Agency.
The information requested for general practitioners, dentists and optometrists is detailed in the following table. The information requested is not available for pharmacists.
Percentage GP Dentists Optometrists Male Female Male Female Male Female 2001 68 32 n/a n/a 46 54 2002 66 34 n/a n/a 46 54 2003 166 134 n/a n/a 249 251 2004 65 35 158 142 49 51 2005 64 36 56 44 49 51 n/a = Not available. 1 November. 2 July. Notes: 1. The Central Services Agency does not hold this information on the number of pharmacists in Northern Ireland. 2. All figures are as at October unless otherwise indicated. Source: Central Services Agency.
The percentage of GPs (i) under 40, (ii) 40 to 54 and (iii) 55 and over for 2003, 2004 and 2005 is detailed in Table 1. This information is not available for 2001 and 2002.
The percentage of dentists (i) under 40, (ii) 40 to 54 and (iii) 55 and over for 2004 and 2005 is detailed in Table 2. This information is not available for 2001, 2002 and 2003.
The information requested for optometrists and pharmacists is not available.
Under 40 (Percentage) 40 to 54 (Percentage) 55 and over (Percentage) Total (Headcount) November 20031 25.8 58.8 15.1 1,076 October 2004 25.0 57.9 17.1 1,078 October 2005 23.9 56.5 19.6 1,084 1 0.3 per cent. unknown age group. Note: The age of GPs is not available for 2001 and 2002. Source: Central Services Agency.
Under 40 (Percentage) 40 to 54 (Percentage) 55 and over (Percentage) Total (Headcount) 2004 60.1 32.3 7.6 734 2005 58.4 34.5 7.1 760 Note: The age of dentists is not available for 2001, 2002 and 2003. Source: Central Services Agency.
Table 1 shows the total number of eye tests claimed for in Northern Ireland in each of the last 10 years. The percentage of those who had eye tests that subsequently received spectacles for the first time is not available, however we do know the total number of spectacle vouchers issued (Table 2). The percentage of those who had eye tests that subsequently received replacement or repair of spectacles is not available, however we do know the total number of repairs or replacements of spectacles in the last seven years. This information is provided in Table 3.
Table 1: Number of Health Service Sight Tests 1995-96 196,731 1996-97 212,000 1997-98 227,000 1998-99 235,603 1999-2000 305,148 2000-01 306,503 2001-02 325,998 2002-03 333,928 2003-04 345,966 2004-05 346,925 Notes: Health Service sight tests are restricted to certain groups of the population such as children and those with particular medical conditions. In addition, from 1 April 1999, patients aged 60 and over were eligible for Health Service sight tests. Source: Central Services Agency
Table 2: Number of Spectacle Vouchers Issued 1995-96 146,113 1996-97 153,000 1997-98 159,000 1998-99 158,520 1999-2000 157,709 2000-01 160,372 2001-02 165,198 2002-03 167,792 2003-04 169,209 2004-05 167,151 Source: Central Services Agency
Table 3: Number of Replacements or Repairs of Glasses 1998-99 31,659 1999-2000 29,439 2000-01 28,762 2001-02 19,612 2002-03 26,796 2003-04 29,158 2004-05 26,719 Notes: Vouchers towards the cost of spectacles are restricted to particular categories of patients as are replacements or repairs to spectacles. Source: Central Services Agency
The information requested for general practitioners, dentists, optometrists and the number of pharmacy contractors is detailed in the following table. The number of pharmacists is not available.
General practitioners Dentists Optometrists Pharmacy contractors 2001 1,061 1673 406 320 2002 1,076 1689 445 297 2003 21,076 1696 445 284 2004 1,078 732 490 282 2005 1,084 760 511 267 1 April 2 November Notes: 1. Central Services Agency does not hold information on the number of pharmacists in Northern Ireland. They hold information on the number of pharmacies and pharmaceutical contracts. 2. Figures are as at October unless otherwise indicated. Source: Central Services Agency.
Northern Ireland Police Fund
The Northern Ireland Police Fund is required to provide financial monitoring information on a monthly basis and after the end of each financial year to provide its audited accounts to the Department.
In respect of the alleged breach of security at the Northern Ireland Police Fund a full police investigation has been carried out within the fund. This investigation has now been completed and involved a comprehensive programme of interviews. No persons have been prosecuted as a result of this investigation. It would not be appropriate to comment on the operational detail of the investigation as such issues are a matter for the Chief Constable.
The board of directors asked the NIO internal audit to complete a review of the Northern Ireland Police Fund. All matters relating to the report are a matter for the fund.
In respect of the alleged breach of security at the Northern Ireland Police Fund a full police investigation has been carried out within the fund. This investigation has now been completed and involved a comprehensive programme of interviews. No persons have been prosecuted as a result of this investigation.
The audit report referred to was requested by the Northern Ireland Police Fund. Any matters relating to the report are a matter for the fund.
The audit report referred to was requested by the Northern Ireland Police Fund. Any matters relating to the report are a matter for the fund.
The audit report referred to was requested by the Northern Ireland Police Fund. Any matters relating to the report are a matter for the fund.
All matters relating to the internal audit report on the Northern Ireland Police Fund are a matter for the fund.
The Northern Ireland Police Fund has advised me that the following Directors of the fund resigned with effect from the dates listed:
Director Date of resignation Ms A. Paisley 3 March 2006 Mrs. F. Reid 31 January 2005 Lord Rogan 31 March 2005 Mr. R. Wilson 31 March 2004 Sir J. Semple 31 January 2005
Currently 60 per cent. of the staff of the fund are seconded from the Northern Ireland Civil Service. At 31 December 2003 this figure was 12.5 per cent.
Paramilitary Paraphernalia
The Police Service of Northern Ireland have confirmed that they have no records of anyone being charged with these offences since 2001.
The NIO Statistics and Research branch have confirmed that they have no record of convictions for these offences between the years 2001 and 2003.
Data that might detail convictions from 2004 to present time will not be available until late summer.
Police
Section 51(2) of the Police (NI) Act 2000 provides the Chief Constable with the power to give guidance to officers on any membership which a police officer believes he has, or not, of an organisation which may be regarded as affecting that officer’s ability to discharge his duties effectively and impartially. 1 am advised by the PSNI that all General Orders are reviewed on an annual basis and that during this annual review, the list of organisations will also be revisited. This review of the list of organisations will then be placed before the Chief Constable’s Forum for final decision.
The PSNI has advised that two police officers in Northern Ireland have been suspended from duty as a result of investigations by the Police Ombudsman in 2003 and three officers were suspended in 2004. No officers were suspended in 2005 or 2006 as of 7 July 2006.
Post Office Contracts
The following table lists all current contracts with Post Office Ltd held by Northern Ireland Departments and their associated public bodies.
Department Service Start date End date Livestock and Meat Commission for Northern Ireland (LMC): “Presstream” and “Mailsort” services for delivery of weekly LMC bulletin. 29 October 2006 Open ended (seven days notice by either party) Driver And Vehicle Licensing Northern Ireland Processing motor vehicle licensing renewals 1 April 2002 31 March 2007 Social Security Agency Post Office card account (POCA) banking services 1 April 2003 31 March 2010
Rates
The average domestic rate for households in Northern Ireland consists of the average of the 26 district council domestic rates plus the domestic regional rate.
The formula for calculation of the average rate for households is as follows: Each year, district councils' estimated net expenditure is reduced by anticipated general grant payments and any balance that councils have indicated they wish to apply, to determine the net amount to be raised from district rates. This figure is divided by the total penny product (the income from one penny in the rates) to give the average non-domestic rate. The average non-domestic rate is then multiplied by the Northern Ireland growth factor to determine the average domestic rate. The average domestic rate for 2006-2007 is 157.33 pence
The regional domestic rate is a single rate applied uniformally across Northern Ireland. It is determined by dividing the domestic rate revenue required in the Budget by the domestic tax base, currently defined in rental values.
The average domestic rate in 2006-07 is 355.50 pence, which is the sum of the uniform regional domestic rate of 198.17p and the average district rate of 157.33p.
Redundancy
All benefits payable on redundancy terms which apply to staff in the Northern Ireland Office who are members of the Home Civil Service are determined under the Civil Service Compensation Scheme.
All benefits payable on redundancy terms which apply to staff in the Northern Ireland Office who are members of the Northern Ireland Civil Service are determined under the Civil Service Compensation Scheme (Northern Ireland).
The terms and conditions for the employment of staff in the Northern Ireland Police Fund are a matter for the fund.
Road Improvements
The acting chief executive of roads service Mr. Geoff Allister has written to the hon. Gentleman in response to this question.
Letter from Geoff Allister, dated 17 July 2006:
You recently asked the Secretary of State for Northern Ireland a Parliamentary Question about when the major planned roadworks on the A2 between Limavady and Coleraine will (a) begin and (b) be concluded. As this issue falls within my responsibility as Acting Chief Executive of Roads Service, I have been asked to reply.
It is assumed that you are referring to the planned improvements for the A37, the main route between Limavady and Coleraine.
Roads Service plans to carry out a major improvement scheme to provide a 2.3 kilometre long climbing lane to improve overtaking opportunities for Coleraine-bound traffic on the A37 west of Keady mountain.
It was expected to commence construction work on this scheme during this financial year, however this has had to be deferred because of land acquisition difficulties. We are hopeful that construction will commence in 2007/2008.
We are mindful of the elevation of the site and propose to programme the works to commence in the spring and be completed by the autumn to avoid the need to divert traffic onto other less suitable mountain roads during winter conditions.
Sectarian Attacks
The statistics have been split by police District Command Unit and have been provided for the months of Jan, Feb and Mar 2006-April 2006 statistics are not yet available.
January 2006 February 2006 March 20006 January to March 2006 January 2006 February 2006 March 2006 January to March 2006 Antrim 3 2 I 6 1 3 0 4 Ards 0 0 0 0 0 4 0 4 East Belfast 1 2 0 3 4 2 0 6 North Belfast 12 7 4 23 6 3 2 11 South Belfast 2 0 5 7 1 0 1 2 West Belfast 0 0 1 1 0 0 0 0 Carrickfergus 4 1 0 5 0 0 1 1 Castlereagh 0 0 0 0 1 0 0 1 Larne 3 0 0 3 3 1 0 4 Lisburn 2 3 0 5 0 0 1 1 Newtownabbey 3 2 4 9 2 2 1 5 North Down 0 0 0 0 0 0 0 0 Armagh 0 0 0 0 0 1 0 1 Ballymena 7 5 1 13 3 3 1 7 Ballymoney 2 0 0 2 0 0 1 1 Banbridge 0 0 0 0 1 0 0 1 Coleraine 3 2 0 5 5 1 2 8 Cookstown 0 0 0 0 0 0 0 0 Craigavon 0 10 1 11 0 3 1 4 Down 0 0 1 1 1 2 0 3 Dungannon and South Tyrone 0 0 0 0 0 0 0 0 Fermanagh 1 1 0 2 0 1 0 1 Foyle 6 4 1 11 9 4 18 31 Limavady 0 1 0 1 0 0 0 0 Magherafelt 0 0 0 0 0 0 2 2 Moyle 0 0 0 0 0 0 0 0
Sex Offenders
Probation Board for Northern Ireland have responsibility for the post-release supervision of persons subject to life licences and sex offender licences. Of the 17 persons released in the last five years who are subject to a life licence or sex offender licence, and who are also subject to the notification requirements of the Sexual Offences Act 2003, one person has been reconvicted.
The Probation Board for Northern Ireland has responsibility for the post-release supervision of persons subject to life licences and sex offender licences. In the last five years, three offenders on sex offender licences who were also subject to the notification requirements of the Sexual Offences Act 2003 were returned to prison for breach of licence conditions, two in 2001 and one in 2002. There have been no licences revoked in any of the last five years in respect of those subject to a life licence or sex offender licence who are also subject to the notification requirements of the Sexual Offences Act 2003.
Victims March (Dublin)
This was an unfortunate but isolated incident. I understand 41 people were arrested during the disorder that occurred on 25 February: the decision to prosecute is a matter for the Director of Public Prosecutions. The safety of Northern Ireland citizens, whether in Dublin or Belfast or anywhere else, remains paramount for me and of course I discussed this and keep in touch with Ministers of the Irish Republic.
Westminster Election (Expenditure)
The spend in relation to the parliamentary general election held on 7 June 2001 in Northern Ireland was £1.65 million.
Environment, Food and Rural Affairs
Abandoned Cars
Numbers of abandoned vehicles for each local authority were primarily collected from 2000-01 to 2003-04 from the DEFRA Municipal Waste Management Survey and from WasteDataFlow in 2004-05. Results from authorities that responded have been placed in the Library of the House. Numbers were not collected prior to 2000-01 and results for 2005-06 are not yet available.
Air Quality
There are no plans at present to visit the London borough of Bexley.
Carbon Islands
I understand carbon islands to mean the production of biomass grown by hydroponics on artificial islands in tropical seas. My Department has not evaluated any research on this idea as a way to mitigate the effects of climate change.
Energy Efficiency
On 12 June the Prime Minister and my right hon. Friend the Secretary of State for Environment, Food and Rural Affairs announced new sustainable operations targets for the Government estate. They replace the previous targets in the Framework for Sustainable Development on the Government Estate, and will drive improvements in the way Departments manage their land and buildings sustainably.
These new commitments do not set a separate target for gas and electricity consumption on the Government estate. Instead Government have set targets on overall energy efficiency, carbon emissions and carbon neutrality, all of which will apply from April 2006. A table of the new targets follows as annex A. In addition, the existing commitment that Government Departments should source at least 10 per cent. of their electricity from renewables will remain in place until 2008.
Departmental performance against Government estate targets, including carbon emissions and energy efficiency, has been published in annual Sustainable Development Government Reports. The last report was produced by the Sustainable Development Commission, the independent watchdog, in December 2005. It covered the reporting period April 2004 to March 2005 and is available at: http://www.sd-commission.org.uk/watchdog.
Priority area Targets Climate change and energy Carbon emissions from offices Reverse the current upward trend in carbon emissions by April 2007 Reduce carbon emissions by 12.5 per cent. by 2010-11, relative to 1999-2000 levels Reduce carbon emissions by 30 per cent. by 2020, relative to 1999-2000 levels Carbon emissions from road vehicles Reduce carbon emissions from road vehicles used for Government administrative operations by 15 per cent. by 2010-11, relative to 2005-06 levels Carbon neutral Central Government’s office estate to be carbon neutral by 2012 Energy efficiency Departments to increase their energy efficiency per sq m by 15 per cent. by 2010, relative to 1999-2000 levels. Departments to increase their energy efficiency per sq m by 30 per cent. by 2020, relative to 1999-2000 levels Sustainable consumption and production Waste arisings Departments to reduce their waste arisings by 5 per cent. by 2010, relative to 2004-05 levels Departments to reduce their waste arisings by 25 per cent. by 2020, relative to 2004-05 Recycling Departments to increase their recycling figures to 40 per cent. of their waste arisings by 2010 Departments to increase their recycling figures to 75 per cent. of their waste arisings by 2020 Natural resource protection Biodiversity Departments to meet or exceed the aim of having 95 per cent. of Sites of Special Scientific Interest (SSSIs) in sole ownership or control in target condition by 2010 Water consumption Reduce water consumption by 25 per cent. on the office and non-office estate by 2020, relative to 2004-05 levels Reduce water consumption to an average of 3m3 per person/year for all new office builds or major office refurbishments Government to mandate Departments to adopt the Carbon Trust’s Carbon Management Programme—involves the proactive management to the risks and opportunities relating to climate change mitigation The application of BRE’s Environmental Assessment Method (BREEAM) excellent standards, or equivalent, to all new builds and major refurbishments Accepted elements from the Sustainable Procurement Task Force National Action Plan OGC’s Property Benchmarking Scheme—aimed at improving the efficiency and effectiveness of corporate estate management All Departments to have Environmental Management Systems based, or modelled upon, a recognised system Data collection and reporting—identification of core data to be reported against the new targets All Departments to encourage staff to take an active role in volunteering in the community All Departments to conduct sustainability appraisals of office relocations Existing Sustainable Operational Commitments (to continue until completion) Departments to source at least 10 per cent. of electricity from renewables (31 March 2008) Departments to source at least 15 per cent. of electricity from Combined Heat and Power (2010) 1 Vision for the Government estate: A sustainably managed estate which is modern, resource efficient, with low energy buildings; well conserved and managed land; efficient use of space and ways of working; and where the principles of sustainable development are embedded into our working practices. Note: The above sustainable operational targets to apply for the reporting period April 2006-March 2007
Environmental Directives
DEFRA was created in June 2001. Between 1 June 2001 and 30 June 2006 the Department was the lead Department for 60 environmental infringement proceedings initiated by the European Commission. The following table lists these by year:
Number 1 June to 31 December 2001 10 2002 7 2003 20 2004 12 2005 4 2006 7
A member state can be infracted for a number of different reasons falling into the following categories: late transposition, poor transposition and implementation issues. The infraction procedure begins with an initial pre-litigation stage, during which the Commission issues first a letter of formal notice (article 226 letter).
A list of all infringements, including environmental ones, initiated by the European Commission against the UK can be found on the European Commission website at:
http://ec.europa.eu/community_law/eulaw/index_en.htm-infractions
Greenhouse Emissions
Annex I Parties to the Kyoto Protocol are required to submit Greenhouse Gas Inventories to the United Nations Framework Convention on Climate Change (UNFCCC) every year. These inventories are compiled using methodologies devised by the International Panel on Climate Change and agreed by the UNFCCC. Once submitted, the inventories are scrutinised by international experts to ensure their completeness and accuracy.
In the UK, inventory data are subject to an audited quality control and assurance programme. This ensures that the data sources are reliable and quality checked, that the choice of methodologies is transparent, and that data are consistent over time, complete, comparable, and assessed for uncertainties. When required, methodological changes are made to take account of new data sources, new guidance from the IPCC, relevant work by other international organisations, new research, or specific research programmes sponsored by DEFRA. Such improvements to the methodology are applied retrospectively to ensure a consistent time series of emissions.
DEFRA periodically tests the accuracy of key source sector estimates in the national inventory by undertaking independent peer review. Reviews completed to date include carbon dioxide from fossil fuel combustion and agriculture. DEFRA also funds independent verification of the reliability of the emissions estimates by combining measurements of the concentrations of selected greenhouse gases at Mace Head in Ireland and a model of atmospheric transport developed by the Met Office.
Methyl Bromide
Under the Montreal Protocol, methyl bromide use was phased out in developed countries from 2005, except for quarantine and pre-shipment purposes, and critical uses agreed by the parties to the Protocol and (in the EU) licensed by the European Commission.
In 2006, agreed UK critical uses amount to up to 33 tonnes. This shows a significant downward trend of less than half the previous amount licensed for 2005 (some 70 tonnes). 2006 is the last year that methyl bromide will be used by the agricultural sector in soil. UK nominations of 11 tonnes for critical uses in 2007 continue the downward trend.
Methyl bromide is an ozone depleting substance and the Government's policy is to support further critical uses only where lack of availability would cause significant market disruption and there are no technical or economically feasible alternatives.
The Department does not generally seek to find alternatives to specific uses of chemicals such as those listed, since this is a matter for the industry sectors concerned. However, it is funding a small number of projects, some jointly with industry, on the development of alternatives to methyl bromide, particularly in the horticulture sector.
Additionally, our pesticides research and development programme includes alternative crop protection technologies projects which aim to support Government policy directed at the minimisation of conventional chemical pesticide use. DEFRA's Pesticides Safety Directorate administers a research budget of about £5.5 million per year, of which over £1 million is applied to support this objective.
Radioactive Waste
No. It is inappropriate to place private ministerial correspondence in the Library of the House.
However, it might be helpful to explain and put into context the current role of Nirex in the management of radioactive waste.
Responsibility for securing the safety of the public and the environment rests with the independent regulators—the Health and Safety Executive (HSE) and the environment agencies (the Environment Agency, EA, in England and Wales and the Scottish Environment Protection Agency, SEPA, in Scotland).
The nuclear operators are required to demonstrate to the regulators that the risks to the public and the environment from their activities, including the management of radioactive waste, are reduced as low as reasonably practicable. In support of their safety cases for the packaging and disposal of radioactive waste, the operators may seek advice from Nirex.
Nirex is not a regulator. It is a company that is jointly owned by the Department for Environment, Food and Rural Affairs (DEFRA) and the Department of Trade and Industry (DTI) that advises nuclear site operators on the preparation of the industry's safety case submissions to the regulators for the conditioning and packaging of waste.
It is the independent regulators who take decisions on the acceptability of waste conditioning and packaging safety cases submitted to them. The environment agencies have teams that scrutinise Nirex's contribution to the safety case process. It is regulators who are responsible for applying and determining the statutory safety requirements of the Nuclear Installations Act 1965 and the Radioactive Substances Act 1993.
The Nuclear Decommissioning Authority (NDA) is the strategic UK-wide body with responsibility for securing the clean-up and decommissioning of public sector nuclear liabilities and the treatment, storage, transportation and disposal of hazardous materials including radioactive waste. It is the owner of most of the UK's radioactive waste.
The majority of Nirex's current funding—over 90 per cent.—comes from a contract with the NDA. The remainder comes through an agreement with the Ministry of Defence (MoD). The company also receives payment from nuclear site operators for supply of their waste conditioning and packaging advice.
Rights of Way
Responsibility for improving the rights of way network, and ensuring that routes are properly recorded and maintained, rests with individual local highway authorities.
Data on how many new routes have been re-opened and established is not collected centrally by DEFRA.
Rural Life
Information from Action for Communities in Rural England shows that, of the 9,000 village halls on Rural Community Council databases, just five are known to have closed in the past few years. The Department does not hold information on the rate of closure of village shops or rural pubs.
The Government recognise that village halls, shops and pubs can all play a part in helping rural communities to thrive. That is why, among other things, we have extended mandatory rate relief at 50 per cent. to include sole village public houses, petrol stations and village food shops under the village shop scheme.
Special Protection Areas
English Nature has published a draft Thames Basin Heaths Delivery Plan. This is designed to provide a means of mitigating against the potential adverse effects of increased housing around the Thames Basin Heaths Special Protection Area.
The Government Office for the South East is working with English Nature to explore the practicalities and flexibilities in the delivery plan approach, and to provide advice to local authorities and developers.
The delivery plan, along with other research evidence, will be considered at the Examination in Public of the South East Plan in November.
International Development
Afghanistan
Afghanistan is a sovereign nation which has an elected Parliament and President. The Government of Afghanistan are therefore the civilian body responsible for overseeing the reconstruction efforts in Afghanistan. The Afghanistan Compact signed at the London Conference in January 2006, commits the Government of Afghanistan to lead on the reconstruction process in Afghanistan over the next five years, with support from the international community. The Government’s plans are described in the interim Afghan National Development Strategy (iANDS), also launched at the London Conference. The UN has a Special Representative of the Secretary General in Kabul (currently Tom Koenigs). It is the responsibility of this person to help co-ordinate the international community’s efforts. He is the joint chair of the Joint Co-ordination Monitoring Body (JCMB) which helps to make sure progress is seen against the targets set in London.
As far as DFID civilian staff are concerned, I refer the hon. Member for Mid Norfolk to the response I gave on 10 July 2006, Official Report, column 1405W to the hon. Member for the Forest of Dean (Mr. Harper).
African Aid
Important progress has been made since Gleneagles on delivering G8 commitments to support development in Africa. This includes an increase in international aid of around 25 per cent. between 2004 and 2005 to over $100 billion, putting us well on track to reach the target of $130 billion in global aid by 2010. Half of this extra money will go to Africa, so that by 2010 it will be receiving $50 billion a year—double the aid it received in 2004. DFID met its pledge to provide £1 billion in aid to Africa through its country programmes in 2005-06 and is on track to double its bilateral programme by 2010-11. The Gleneagles pledges represent a long-term agenda and the Government remain committed to ensuring that all 2005 promises are fully implemented.
Agency Staff
DFID periodically engages temporary staff, both administrative and professional, through employment agencies. Only some information on agency hourly rates is held centrally; for those agencies who supply staff to DFID regularly. The average hourly rate for these agencies, who supply mainly junior administrative grades, is as follows:
Grade C2 - £7.30 Glasgow, Margaret Hodge Recruitment Agency £7.46 Glasgow, TempTeam
Grade C1 - £8.75 - Glasgow, Margaret Hodge Recruitment Agency £10.98 - London, Josephine Sammonds
Other agencies are used on an ad hoc basis but information about these agencies is not held centrally and could be secured only at disproportionate cost.
DFID will be joining an existing arrangement, set up by the Prison Service, this year and once this comes into force information will be more readily available.
Child Labour
The UK is committed to the elimination of child labour wherever it occurs. DFID is funding projects worth more than £20 million around the world, which aim to address the plight of those children already in work as well as to prevent further child labour. Many of these projects also tackle the trafficking of children for work. In addition, many of DFID’s broader poverty reduction programmes are also helping to get children out of work and into education and are protecting children from having to take on harmful jobs to survive.
In Asia, DFID is supporting the work of the International Labour Organisation’s (ILO) International Programme for the Elimination of Child Labour (IPEC). For example, in India, DFID is currently providing over £2.5 million for their programme in the state of Andhra Pradesh. DFID is also providing nearly £9 million to the ILO’s programme in the Greater Mekong Region to end trafficking of women and children for exploitative labour.
In Africa, DFID is supporting many countries to provide free universal primary education. Many of the most vulnerable cannot afford school fees or seek work to pay for schooling. In Tanzania, DFID is providing £110 million this year for the implementation of the Government’s national strategy for growth and poverty reduction. Child labour is a key challenge that this strategy seeks to address and free primary education is part of the response.
In Latin America, support is focused on street children. In Brazil, Peru, and Central America, DFID has funded projects aimed at reducing the numbers of children living and working on the streets by providing them with realistic alternatives.
The UK is in regular contact with both the International Labour Organisation (ILO) and UNICEF, the lead UN agencies working to eliminate child labour. My right hon. Friend the Secretary of State’s recent discussions with these organisations have not focused specifically on child labour. DFID is a major funder of both organisations, with a current commitment of over £15 million to the ILO’s programmes to combat child labour and the trafficking of children. DFID also provided £19 million in core funding to UNICEF programmes in 2005, including support to their Child Protection programme.
My right hon. Friend the Secretary of State for International Development regularly holds meetings with UK-based non-governmental organisations (NGOs) which often have issues relating to child labour on their agenda. However there has been no specific discussion of child labour in recent meetings. DFID funds a number of UK-based NGOs, including Save the Children Fund (SCF) and World Vision, to implement projects addressing child labour issues, including trafficking and street children.
DFID’s overarching mission is to address extreme poverty which is the underlying cause of most child labour. DFID supports many activities which will enable children and families to survive without depending on income from child labour.
In the White Paper published last week, the Government restate their commitment to the elimination of child labour and the development of social protection measures to ensure that poor families and vulnerable children do not need to depend on child labour.
A number of DFID programmes already support social protection. For example, DFID is supporting the development of the Ghana Social Protection Strategy. One of the flagship projects of this strategy is the provision of cash payments to families living in chronic poverty, some of whom currently depend on their children’s income. In Zimbabwe, DFID is providing £30 million to the Protracted Relief Programme which is supporting food security for £1.5 million households in extreme poverty and will mean that many children, including those orphaned by AIDS, will not have to undertake harmful work to survive.
DFID uses data from the International Labour Organisation (ILO) and UNICEF to estimate the extent of child labour. Between 2000 and 2004, the number of children at work in Latin America and the Caribbean fell by two thirds. Just over 5 per cent. of children in the region are now working. According to the ILO, the levels of child labour in Latin America and the Caribbean are now similar to those of some developed and transition economy countries.
The datasets on child labour available from the ILO and UNICEF differ and are not available for all countries. The Statistical Information and Monitoring Programme from the ILO collate estimates on the number of working children based on national survey data. UNICEF estimates the percentage of children (aged five to 14) who are in child labour.
The data available for the countries requested are as follows:
Data Mexico According to UNICEF, 16 per cent. of children aged 5 to 14 are involved in child labour. No data are available from the ILO Belize According to the ILO, 9,000 children between 5 and 17 years are working. No data are available from UNICEF Argentina No data available from either the ILO or UNICEF Bolivia According to the ILO there are 313,000 children between the ages of 7 and 17 in work. UNICEF estimates that 21 per cent. of children between the ages of 5 and 14 are working Brazil According to the ILO, there are 2.2 million child workers in Brazil. UNICEF estimates that 7 per cent. of children aged between 5 and 14 are involved in child labour Chile According to the ILO there are 196,104 working children between the ages of 5 and 17 in Chile. This figure represents approximately 5 per cent. of children. No data from UNICEF available Colombia According to the ILO, there are 1.5 million working children between the ages of 5 and 17 in Colombia. UNICEF estimates that 5 per cent. of children aged between 5 and 14 are involved in child labour Cuba No data from available from the ILO or UNICEF Ecuador UNICEF estimates that 6 per cent. of children aged between 5 and 14 are involved in child labour. No recent ILO data available El Salvador According to the ILO, there are 222,000 working children between the ages of 5 and 17. No data from UNICEF available Guatemala According to the ILO, there are 938,000 working children between the ages of 5 and 17. UNICEF estimates that 24 per cent. of children aged between 5 and 14 are involved in child labour Guyana UNICEF estimates that 19 per cent. of children aged between 5 and 14 are involved in child labour. No data available from the ILO Haiti No data from either the ILO or UNICEF available Honduras According to the ILO, there are 356,000 working children between the ages of 5 and 17. No data from UNICEF available Nicaragua According to the ILO, there are 253,000 working children between the ages of 5 and 17. UNICEF estimates that 10 per cent. of children aged between 5 and 14 are involved in child labour Panama According to the ILO, there are 48,000 working children between the ages of 5 and 17. No data from UNICEF available Paraguay UNICEF estimates that 8 per cent. of children aged between 5 and 14 are involved in child labour. No data available from the ILO Peru No data from UNICEF or the ILO available Surinam No data from UNICEF or the ILO available Uruguay No data from UNICEF or the ILO available Venezuela UNICEF estimates that 7 per cent. of children aged between 5 and 14 are involved in child labour
Clean Water
I refer the hon. Member for Bosworth to the response I gave on 10 July 2006, Official Report, column 1406W.
Comprehensive Spending Review
I have had, and will continue to have, regular discussions with the Chief Secretary about preparations for the 2007 Comprehensive Spending Review, as a matter of great importance to the Department for International Development’s medium and long term planning.
Departmental Staff (Sickness Absence)
Since October 2004, when an electronic absence recording system was introduced, records of sick absences have been held centrally by DFID. This has afforded better management control of frequent and long-term sick absences. However, we are still in the process of defining the types of reports we will require on a regular basis. To provide the information in the format requested requires intensive manual manipulation of the data. We have also changed the basis of recording working patterns from days to hours, which compounds the problem of producing ad hoc reports. We are working with an external consultant towards implementing a simpler process for extracting information from existing systems, but we are unlikely to be able to produce the data until later this year.
Departmental Travel Costs
(2) what steps his Department is taking to reduce the (a) cost and (b) number of internal flights for his staff; and if he will make a statement;
(3) what the total cost was of these flights in 2005; and if he will make a statement.
The average cost of flights in each month in 2005 was as follows:
Average cost (£) January 215.84 February 222.83 March 203.66 April 241.70 May 242.61 June 231.66 July 207.54 August 227.53 September 218.33 October 239.41 November 224.88 December 122.87
DFID's domestic travel policies ensure that staff travel only when necessary, to minimise cost and environmental impact from carbon emissions. Only top management staff may buy business class tickets. However, DFID benefits from an arrangement used by a number of Government Departments whereby travellers on flexible economy tickets may be upgraded to business class at no extra cost. We are keen to reduce the number of internal flights and time spent travelling. We instruct staff to consider whether meetings are essential, and we have invested in modern communication systems, including video conference facilities, to reduce the need for travel.
Disability Policy
DFID has started its preparations for the implementation of the Disability Equality Duty, which comes into effect on 1 December 2006. We are currently developing a DFID-specific equalities screening tool, and an equalities impact assessment tool, to allow for the effective identification and assessment of policies and functions relevant to the Disability Equality Duty.
We will shortly be mapping out our Disability Equality Scheme and preparing our Disability Action Plan. At this stage we will involve disabled people’s organisations as well as development organisations with a disability focus—both in the UK and in our partner countries.
DFID is already taking a number of steps to address disability issues in its approach to development. For example, DFID commissioned a Disability Knowledge and Research programme, and we have since been adopting a twin track approach to disability research. This involves mainstreaming disability into existing research initiatives and working directly towards the establishment of an emancipatory model of research with an umbrella Disabled Peoples’ Organisation in Southern Africa.
DFID is also consulting disabled people’s organisations, and development organisations with a disability remit, about the development of a good practice note for its staff on Inclusive Development. This will have a strong focus on the involvement of disabled people and their representatives in partner countries to ensure that disability issues are taken into account across DFID’s programmes.
Disabled Children
(2) how much his Department has spent on ensuring schools in developing countries have adequate facilities to meet the needs of children with disabilities in each of the last three years.
DFID has committed some £2 billion to education over the last 10 years. In April, my right hon. Friend the Chancellor of the Exchequer, pledged to increase this sum to £8.5 billion over the next 10 years, and last month the Prime Minister promised to increase DFID’s annual budget for education to £1 billion a year by 2010.
Most of this funding will be channelled to the Governments of developing countries to invest in long term, comprehensive investment plans for the education sector. We will be working with our partners to ensure that access to education by children with disabilities is part of these plans. For example, in India, DFID has supported the District Primary Education Programme, which promotes inclusive education and has helped states integrate disabled children into mainstream schools.
We will also continue to fund discrete civil society projects focused on children with disabilities. DFID has partnership agreements with a number of organisations that support disability-focused activities, such as World Vision, HelpAge International, Save the Children and VSO, among others. In addition, through our partner Action on Disability and Development, with whom we have a six-year Programme Partnership Agreement, we work to promote greater participation and inclusion of disabled people and their organisations in decision-making processes, particularly on partner Governments’ Poverty Reduction Strategies.
The Global Monitoring Report, which we regard as the most reliable source of education data, estimates that only 2 per cent. of children with disabilities in developing countries are enrolled in school. Civil society organisations working in this field make similar estimates.
All children, including those with disabilities or living in difficult circumstances, should have equal access to a good-quality basic education. DFID is committed to working with the Governments of developing countries towards the education of all children, including those with disabilities.
DFID’s policy paper, ‘Reducing poverty by tackling social exclusion’, which has been deposited in the Libraries of the House, sets out our broad-based approach to tackling social exclusion across all sectors. The paper outlines how DFID will build on the work that is already under way and some practical actions that DFID is taking to tackle social exclusion and make a real difference to the lives of excluded people.
EU Economic Partnership Agreements
The negotiations on Economic Partnership Agreements (EPAs) between the EU and African, Caribbean and Pacific (ACP) countries are continuing and are due to be finalised by the end of 2007.
Based on our strategy on development and trade as outlined in the Trade and Investment White Paper 2004 (in which we supported improved trade opportunities for developing countries in line with their broader development strategies), the Government have responded to the EPA negotiations. We published a policy statement in March 2005 on how we think EPAs should be designed if they are to help the ACP countries develop. This policy determines how we will influence the EPA negotiations and assess their outcome.
Secondly, at ACP countries' request, DFID has provided substantial financial and independent technical assistance to help inform their positions in the negotiations. This includes support for the west African, eastern and southern African and Caribbean countries as well to the regional bodies which negotiate on their behalf. The UK is the largest bilateral donor in the EU providing such assistance for EPAs.
Thirdly, UK international development assistance will also respond to the needs and priorities of the ACP arising from EPAs in order to help them develop their ability to trade. DFID will provide funding through the European Development Fund. Support for developing countries, including the ACP, will also be provided through our own bilateral initiative, Aid for Trade, to which we have committed £100 million per year by 2010.
Fast Track Initiative
The UK is supporting the Fast Track Initiative (FTI) as part of our overall approach to speeding up progress towards primary education for all children by 2015. Earlier this year, I announced an additional UK contribution of £100 million to the FTI Catalytic Fund, bringing our total support to £150 million. Our contribution over the next two years will cover nearly a quarter of the funding gap in the FTI.
In addition, the UK is calling for other donors, especially G8 countries, to increase their support for an expanded FTI. We have urged other G8 countries to increase their support to education within the FTI framework, either directly through the FTI Catalytic Fund or by increasing their support for education in FTI endorsed countries.
Health Services
[holding answer 3 July 2006]: I attach details of our bilateral general health sector spend by country for the financial years 1997-98 to 2004-05. This totalled nearly £267 million in the financial year 2004-05. We are still in the process of validating expenditure data for 2005-06 and cannot release this under National Statistics Protocols.
DFID also supports work to improve health through our regional and central programmes (including research programmes) that complement the work of our country programmes. In 2004-05, this additional support brought our total bilateral spend on the health sector to some £363 million.
In addition, we provide funding to UN agencies such as the World Health Organisation (WHO) and UNICEF, and bodies such as the Global Fund for AIDS, TB and Malaria, which are all primarily concerned with helping countries improve their health services. In 2004-05, expenditure on multilateral organisations that have a significant focus on health was £108.6 million.
DFID also provides general Poverty Reduction Budget Support to several developing countries to help build basic services. Some of this funding goes on health services, but is not captured within our sector specific spending figures which therefore somewhat underestimate our overall contribution to improving health in developing countries.
GBP £ Country 1997-98 1998-99 1999-2000 2000-01 2001-02 Afghanistan 200,000 — 132,167 — — Albania 38,930 188,398 151,338 107,814 296,881 Algeria 4,362 — — — — Angola 1,274,663 963,376 617,035 257,381 29,829 Anguilla 8,201 77,665 111,147 83,808 248,543 Antigua and Barbuda 118 33,787 576,013 529,333 — Armenia, Republic of — 8,612 110,163 100,000 — Azerbaijan, Republic of 12,926 — 40,000 40,000 — Bahamas — — — — — Bangladesh 7,864,076 10,576,683 12,146,258 18,203,254 16,794,134 Barbados 11,755 3,332 — — — Belarus, Republic of — 4,800 4,772 14,552 15,185 Benin, Peoples Republic — 87,952 81,647 8,316 — Bolivia 604,453 808,630 1,333,854 2,300,908 3,188,656 Bosnia 245,320 427,928 613,522 243,557 77,457 Botswana 16,394 27,960 32,307 18,155 14,269 Brazil 812,485 625,719 754,713 746,557 1,192,809 Bulgaria 52,473 — — — — Burkina Faso 84,602 134,980 70,775 25,371 29,986 Burma 17,379 262,095 175,915 99,252 4,144 Burundi — — — — — Cambodia 2,306,696 2,485,202 2,116,258 1,899,004 1,718,249 Cameroon 18,946 34,690 70,296 12,871 — Caribbean 109,216 136,977 254,216 74,452 415,141 Chile 164,374 322,899 145,625 — — China 144,798 471,529 1,895,663 2,681,681 3,784,647 Colombia 14,753 69,324 61,014 43,703 4,405 Congo, Dem Republic 41,278 52,545 141,460 49,721 — Congo, Peoples Republic 23,005 6,018 23,540 — — Croatia 15,952 42,657 84,418 5,863 6,719 Cuba 111,401 66,634 49,094 87,480 49,038 Cyprus — — 538 — — Dominican Republic 17 — — — — Ecuador 76,096 90,242 26,179 114,481 82,837 Egypt, Arab Republic 10,559 — — — — El Salvador 49,340 107,371 75,788 115,745 97,469 Eritrea — — — — — Estonia 342 — — — — Ethiopia 444,264 267,151 241,957 212,408 9,326 Fiji 88,705 — — 194 — Gambia, The 298,553 318,524 99,034 183,185 276,647 Georgia 110,081 134,189 183,697 293,871 615,553 Ghana 3,533,964 9,941,984 6,165,425 8,570,308 11,414,003 Guatemala 143,502 96,000 96,400 37,933 54,159 Guinea — — 64,825 68,648 31,501 Guyana 183,345 131,930 61,102 17,432 3,653 Haiti — — — 21,530 71,951 Honduras — — 126,802 152,961 122,604 Hong Kong 5,325 809 — — — Hungary 4,463 24,679 61,873 90,540 114,898 India 21,351,855 20,295,078 35,486,879 30,586,585 29,560,090 Indonesia 11 164,453 32,583 38,198 118 Iraq 368,000 — 530,582 — — Jamaica — — — — — Kazakhstan, Republic of 453,362 270,565 258,822 420,692 322,795 Kenya 4,372,218 9,884,658 7,524,589 8,008,104 9,151,998 Kyrgyzstan, Republic of 99,412 157,066 341,676 550,017 446,835 Laos 222,058 192,878 61,896 68,893 66,758 Lesotho 233,911 142,080 220,406 129,886 74,000 Liberia — 173,244 393,721 1,136,057 362,107 Madagascar — — — — — Malawi 4,857,793 3,392,773 6,995,995 11,888,179 6,892,694 Malaysia 3,250,000 — 25,016 26,877 17,626 Mali 92,986 30,194 38,609 24,565 79,536 Malta 18,045 20,972 20,785 15,170 1,695 Mauritius 42,149 22,884 18,338 4,815 — Mexico 182,452 413,926 310,896 142,357 55,709 Middle East 29,847 40,863 32,134 32,294 — Moldova, Republic of 7,524 2,653 — — 11,960 Montserrat 11,008,453 8,950,343 8,770,595 4,117,418 644,272 Mozambique 596,329 547,725 613,395 8,119,134 8,640,202 Namibia 693,694 329,226 316,170 577,113 410,039 Nepal 1,666,631 2,582,387 2,038,442 3,646,826 7,256,920 Nicaragua 350,661 214,310 365,931 228,749 89,580 Niger 60,000 89,842 100,000 100,000 78,210 Nigeria 4,310,965 6,244,925 7,125,469 6,844,552 7,507,481 Pakistan 6,451,560 5,952,187 7,373,423 4,074,751 10,318,693 Panama — — 18,255 1,473 — Papua New Guinea 44,066 30,933 17,886 — — Peru 1,680,287 1,526,543 2,061,625 1,594,336 1,509,490 Philippines 144,448 115,038 37,099 19,516 — Pitcairn Islands — — — — — Romania 140,937 193,566 66,804 29,882 217,949 Russian Federation 2,777,722 2,305,030 2,876,347 2,214,351 2,107,051 Rwanda — — 261,679 34,223 23,364 Senegal 23,470 — 44,806 118,988 147,442 Serbia and Montenegro — — — 213,495 1,021,768 Sierra Leone 74,752 743,429 1,397,690 1,332,327 1,378,128 Slovak Republic 16,730 — — — — Slovenia 1,501 — — — — Solomon Islands 183,715 55,347 34,520 7,658 3,074 Somali Democratic Republic — 27,601 43,203 52,351 5,678 South Africa, Republic of 3,946,036 6,026,802 4,594,120 5,965,406 3,573,262 Sri Lanka 331,939 452,821 447,962 200,849 182,181 St. Helena 578,808 492,616 478,522 355,793 852,514 St. Lucia — — — — 248 Sudan 27,883 151,609 107,182 140,092 143,580 Swaziland 118,817 70,063 84,722 151,867 94,240 Tajikistan, Republic of — 10,409 20,000 60,396 30,780 Tanzania 5,898,613 5,462,371 6,391,140 9,337,450 12,508,228 Thailand 24,645 44,859 4,206 — — Togo 80,207 124,147 114,375 172,767 47,285 Tonga 12,430 14,290 5,570 — 5,337 Trinidad and Tobago 4,251 — — — — Tristan da Cunha 291,625 123,387 149,457 112,520 184,852 Turkmenistan 48,597 100,047 30,000 30,747 — Turks and Caicos Islands 48 13,791 132,818 89,684 10,317 Uganda 8,676,854 8,537,985 9,160,803 54,019,083 38,711,758 Ukraine 62,533 18,931 209,095 112,379 52,141 Uzbekistan, Republic of 33,449 93,772 248,572 262,906 254,740 Vanuatu — — — — 10,223 Vietnam 152,383 190,173 229,208 58,350 82,746 West Bank and Gaza 368,541 543,481 1,515,131 1,916,678 1,751,244 Windward Islands — 17,686 — — — Yemen, Republic of1 — — — — — Yugoslavia 43,070 — 5,350,846 1,187,375 300,000 Zambia 4,432,521 3,607,646 3,498,394 4,949,194 813,859 Zimbabwe 3,867,411 2,791,817 3,500,968 4,267,535 3,219,267 Totals 107,455,315 123,034,688 151,126,188 207,303,175 191,996,756
Country 2002-03 2003-04 2004-05 1997-2005 Total Afghanistan 71,913 160,023 63,657 627,760 Albania 405,235 417,831 271,459 1,877,886 Algeria — — — 4,362 Angola — 34,800 422,970 3,600,054 Anguilla 44,963 23,195 214,569 812,092 Antigua and Barbuda 131,928 — — 1,271,179 Armenia, Republic of — — — 218,775 Azerbaijan, Republic of — — — 92,926 Bahamas 3,034 912 — 3,946 Bangladesh 16,356,777 11,576,883 7,120,246 100,638,311 Barbados — — — 15,087 Belarus, Republic of 6,000 33,423 97,646 176,378 Benin, Peoples Republic — 54,426 — 232,341 Bolivia 2,553,235 1,206,039 898,533 12,894,310 Bosnia — — — 1,607,785 Botswana 8,543 — — 117,627 Brazil 1,734,181 1,212,617 879,439 7,958,519 Bulgaria — — — 52,473 Burkina Faso 30,095 16,051 — 391,860 Burma 3,581,449 2,868,746 4,154,258 11,163,239 Burundi — — — — Cambodia 1,520,188 4,370,537 5,821,983 22,238,116 Cameroon — — — 136,803 Caribbean 166,757 478,902 1,008,116 2,643,776 Chile — — — 632,899 China 11,962,737 9,151,283 9,156,735 39,249,073 Colombia 2,238 — — 195,437 Congo, Democratic Republic 274,251 2,317,507 5,815,521 8,692,283 Congo, Peoples Republic — — — 52,563 Croatia 115,872 18,128 — 289,610 Cuba 65,160 66,204 37,522 532,532 Cyprus — — — 538 Dominican Republic — — — 17 Ecuador 84,722 — — 474,557 Egypt, Arab Republic — — — 10,559 El Salvador 150,942 84,448 2,507 683,610 Eritrea — 500,000 — 500,000 Estonia — — — 342 Ethiopia 62,789 3,905,402 3,901,535 9,044,831 Fiji — — — 88,900 Gambia, The 40,035 1,661 — 1,217,640 Georgia 265,309 605,622 776,229 2,984,551 Ghana 7,524,897 11,727,091 14,599,713 73,477,385 Guatemala 73,490 65,738 14,354 581,575 Guinea 311,251 59,835 — 536,060 Guyana — — — 397,462 Haiti 81,669 73,699 — 248,849 Honduras 72,352 — — 474,719 Hong Kong — — — 6,134 Hungary 94,053 — — 390,506 India 33,811,687 35,883,728 74,895,144 281,871,047 Indonesia 2,310 — 75,932 313,606 Iraq — — — 898,582 Jamaica 12,239 730 — 12,969 Kazakhstan, Republic of 259,405 147,270 — 2,132,910 Kenya 15,139,169 10,417,915 17,665,328 82,163,979 Kyrgyzstan, Republic of 273,549 329,441 524,263 2,722,258 Laos 86,795 37,784 — 737,062 Lesotho — — 339,516 1,139,800 Liberia 37,893 586,419 836,521 3,525,962 Madagascar 54,435 119,296 — 173,731 Malawi 13,090,485 14,780,123 12,544,271 74,442,313 Malaysia 6,551 — — 3,173,930 Mali 24,716 138,485 — 429,091 Malta 15,457 3,250 — 95,375 Mauritius — — — 88,186 Mexico 50,630 70,791 64,251 1,291,012 Middle East — — — 135,138 Moldova, Republic of — 60,284 92,116 174,537 Montserrat 814,059 229,599 11,121 34,545,859 Mozambique 7,726,032 9,990,827 9,565,394 45,799,038 Namibia 627,655 87,383 — 3,041,279 Nepal 5,748,756 4,816,752 5,506,638 33,263,351 Nicaragua 106,830 64,161 154,061 1,574,282 Niger 21,790 — — 449,842 Nigeria 13,342,712 14,220,421 19,100,411 78,696,937 Pakistan 5,710,661 19,763,895 18,454,129 78,099,299 Panama — — — 19,728 Papua New Guinea — — — 92,885 Peru 191,750 224,531 831,523 9,620,084 Philippines — — 81,604 397,705 Pitcairn Islands — — 9,063 9,063 Romania 263,865 187,055 86,563 1,186,620 Russian Federation 5,520,263 5,746,922 2,819,130 26,366,816 Rwanda 64,812 77,876 491,604 953,558 Senegal 191,527 176,902 52,878 756,013 Serbia and Montenegro 395,037 20,498 — 1,650,797 Sierra Leone 1,470,743 2,474,677 410,592 9,282,338 Slovak Republic — — — 16,730 Slovenia — — — 1,501 Solomon Islands 70 — — 284,385 Somali Democratic Republic 60,738 373,584 791,006 1,354,161 South Africa, Republic of 4,962,862 5,849,554 6,881,227 41,799,268 Sri Lanka 426,346 73,538 26,646 2,142,284 St. Helena 681,089 1,061,986 983,638 5,484,965 St. Lucia — — — 248 Sudan 24,377 2,364,000 6,989,879 9,948,602 Swaziland 68,483 11,516 — 599,707 Tajikistan, Republic of 51,429 18,805 — 191,819 Tanzania 12,893,487 6,082,347 1,835,021 60,408,657 Thailand — — — 73,709 Togo 219,672 196,555 36,626 991,634 Tonga 12,928 — — 50,555 Trinidad and Tobago — — — 4,251 Tristan da Cunha 163,781 12,029 — 1,037,651 Turkmenistan 743 — — 210,133 Turks and Caicos Islands 8,882 — — 255,539 Uganda 20,107,168 31,750,624 3,124,761 174,089,035 Ukraine 62,246 127,796 148,266 793,387 Uzbekistan, Republic of 334,191 558,484 72,524 1,858,637 Vanuatu — — — 10,223 Vietnam 46,678 775,742 2,061,950 3,597,230 West Bank and Gaza 1,900,907 2,192,092 1,086,903 11,274,976 Windward Islands — — — 17,686 Yemen, Republic of1 — 485,900 220,850 706,750 Yugoslavia — 36,534 488,240 7,406,064 Zambia 9,824,217 6,610,710 4,692,756 38,429,297 Zimbabwe 5,593,554 9,961,352 17,624,652 50,826,556 Totals 210,301,723 240,231,163 266,933,990 1 YAR to May 1990. Note: Date 29 June 2006. Source: SRSG database DFID Bilateral and Broad Sector.
Inclusive Education
DFID is committed to inclusive education and teacher training related to this, being part of education sector investment plans. In addition, DFID provides targeted support; for example in Vietnam, DFID has co-financed with the Government of Vietnam, the World Bank and other donors the Primary Education for Disadvantaged Children programme, a £243 million project which was launched in October 2003 and includes a strong focus on inclusive education. In Kenya, DFID is supporting an innovative pilot project with Sightsavers and the Ministry of Education to provide assistive technology to all totally blind and severe low-vision students at Kenyatta University and three Teacher Training Colleagues.
Iraq
The International Organization for Migration (IOM) published figures in June 2006, which give an overall estimate of 1.3 million people internally displaced in Iraq.
Of these, the IOM believes that nearly 100,000 people have been displaced in Iraq’s central and southern governorates since the bombing of the shrine at Samara on 22 February.
The IOM add that numbers are estimates only and are continually changing. More information and updates are available on the IOM website (http://www.iom.int).
Since the 2003 conflict, DFID has provided £85 million humanitarian assistance for Iraq, to help avert a major humanitarian crisis and to assist in the restoration of essential services. DFID has also contributed £32 million to the International Red Cross and Red Crescent movement in Iraq, and provided £7.2 million to non-governmental organisations (NGOs) for humanitarian work, including work to assist displaced people.
In 2003, following increasing concerns regarding drug shortages in Iraq, the World Health Organisation (WHO) set up a task force to look at of the problem.
Since then WHO has been working with the Ministry of Health in Iraq to improve drug supply systems. In addition to training staff, WHO is working with Iraqis to build new systems, monitor and plan the supply of essential drugs, establish quality control, and assist emergency planning. This has included direct supply of some essential medicines to Iraq.
Shortages remain and WHO advises that the national drug supply management system is still in need of technical and logistical assistance.
DFID has given most of its assistance to the Iraqi health sector through financial contributions to international organisations, including WHO, that have particular expertise in health. These contributions include:
£5 million to WHO, which has helped to fund the delivery of emergency medical supplies, supported clinics and hospitals in Baghdad and Basra, and supports the Iraqi Government's Health Sector Working Group. More information can be found at: http://www.who.int/en
£32 million to the International Red Cross for immediate humanitarian assistance
£70 million to the United Nations and World Bank multi-donor trust funds for Iraq. These trust funds finance reconstruction in a number of areas including health. The UN trust fund has approved 10 health and nutrition projects, in total valued at $96 million. The World Bank trust fund also has a $25 million health rehabilitation project which finances priority emergency services, including basic medical equipment and essential drugs. More information on both trust funds can be found at: http://www.irffi.org
Kosovo and Somalia (Aid)
In the three financial years from 2002-03, DFID spent £3.1 million, £2.5 million and £2.12 million in Kosovo, all on technical assistance. Our allocation for 2005-06 was £2.7 million. Expenditure figures are being finalised. We intend to provide approximately £3 million in 2006-07 and expect this level to continue for the next two financial years. Virtually all EC support to Kosovo is given through the European Agency for Reconstruction which provided €63 million in 2003, €73 million in 2004 and €77 million in 2005. The UK’s share of this assistance is 19 per cent. Data for future years are not available. We do not have disaggregated data for expenditure on Kosovo by UN agencies and the World Bank.
DFID’s programme of funding for Somalia for the last three financial years and by percentage is set out in the following table. Official figures for the financial year 2005-06 have yet to be published but the allocation was provisionally £13.2 million. Planned programme allocations for the next two financial years’ are as follows:
£ million 2006-07 15.5 2007-08 21
It is currently not possible to disaggregate spending to institutions as our programme is developing in light of the ongoing Joint Needs Assessment.
Future allocations beyond 2007-08 will be announced next year following completion of the current Spending Round.
£ million Total DFID Bilateral Programme Percentage Imputed UK share via EC Percentage Imputed UK share via UN Percentage UK share via WB Percentage Total 2002-03 3.1 52 1.9 32 0.9 16 0.0 0 5.9 2003-04 4.0 53 2.8 36 0.8 11 0.0 0 7.6 2004-05 5.3 56 3.6 38 0.6 6 0.0 0 9.5 Note: Imputed multilateral shares are available by calendar year only so these taken as proxy for financial years. Date: 10 July2006 The majority of our bilateral aid in 2002-03 and 2003-04 was channelled through either non-governmental organisations or humanitarian agencies Source: Statistics on International Development 2005 and Imputed Multilateral Shares
Oxfam Offices (Darfur)
We share Oxfam’s concern that the declining security situation in one area of North Darfur has forced them to close two of their local offices there. They hope their withdrawal will only be temporary, and are doing everything they can to reduce the humanitarian impact. Part of Oxfam’s work is building local capacity to manage emergency water and sanitation systems, and they are confident that the water supply will not deteriorate significantly in the immediate term.
We continue to press all parties in Darfur to implement the May 2006 Darfur Peace Agreement (DPA) and the 2004 N'Djamena ceasefire to which the Sudan Liberation Movement/Army (SLM/A) as a whole and the Justice and Equality Movement (JEM) agreed.
Palestinian Territories
I have arranged for the document entitled “Revised Emergency Appeal, 31 May 2006: Consolidated Appeals Process (CAP); Occupied Palestinian Territory”, to be placed in the Libraries of the House.
This report can also be accessed via the Humanitarian Information Centres website at http://www.humanitarianinfo.org/opt/docs/UN/OCHA/CAP06_Revised_emergency_30May06.pdf.
Public Private Infrastructure Advisory Facility
(2) what assessment he has made of (a) the value for money supplied from UK public funds of the Public Private Infrastructure Advisory Facility and (b) whether the facility provides quality development assistance which has positive impacts on citizens in developing countries by helping to relieve poverty; and on what evidence those assessments are based;
(3) when the Government last reviewed their involvement in the Public Private Infrastructure Advisory Facility; and what the results were of the review;
(4) what recent assessment he has made of the (a) role and (b) value of the consensus-building activities of the Public Private Infrastructure Advisory Facility; and if he will make a statement;
(5) what the timetable is for decision-making on the annual allocation of funds to the Public Private Infrastructure Advisory Facility; and what public consultation will take place prior to any decision on this allocation.
Improving infrastructure is essential for achieving economic growth in developing countries. There is also a pressing need to increase the efficiency of infrastructure to give greater access to the poor and better value for money. Current investment flows are insufficient to fund these additional needs and the public sector alone cannot bridge the financing and efficiency gaps. A significant contribution from the private sector will be required. However, attracting private capital and participation is difficult—according to World Bank figures, private investment in developing country infrastructure fell from US$ 49.6 billion in 1997 to US$ 12.5 billion in 2003.
Among the main constraints to successful private sector participation in infrastructure are the lack of appropriate policies, laws, regulations and institutions and the weak capacity of the public sector to effectively manage private sector involvement. The PPIAF is a global technical assistance facility managed by the World Bank to address these constraints and, where requested to do so by developing country governments, facilitate and, where appropriate, raise the quality of private sector involvement in infrastructure. The PPIAF is a good example of successful donor harmonization in development. It is supported by 14 donors with a wide range of skills, knowledge and experience. As of April 2006, it had approved US$ 108.7 million funding for 495 activities in 101 countries. This funding mobilised an additional US$ 59.8 million co-financing from Governments and other donors.
A particular strength of the PPIAF is its open and transparent systems of governance. These include procedures governing the application for, and allocation of, activity funds. As a partner in a multilateral facility, DFID abides by the endorsed systems and governance arrangements.
DFID fully endorses the PPIAF's objective to help developing countries to improve the quality of their infrastructure to the benefit of the poor through effective public-private partnerships. In practice, this is largely achieved by helping Governments improve their policies, laws, regulations and institutions (their “enabling environment”). Our other objectives are to encourage greater donor coordination in designing solutions to meet the demands of developing countries, reducing transaction costs for developing countries and effective dissemination of lessons learned.
DFID does not earmark its contribution to the PPIAF. Funding is pooled with that of other donors. The breakdown of total PPIAF expenditure in US$ by sector for each of the last three years is provided in the table. Future allocations will depend on demand from Governments of developing countries.
2003 2004 2005 Energy US$ 792,010 2,229,500 3,663,675 Percentage 6 16 21 Water US$ 3,452,122 2,700,118 3,171,640 Percentage 34 19 18 Telecom US$ 2,745,040 1,536,218 796,600 Percentage 19 11 5 Transport US$ 3,624,750 1,701,270 3,361,993 Percentage 25 12 19 Multi-sector US$ 3,690,383 6,053,654 6,409,295 Percentage 26 43 37 Total US$ 14,304,305 14,220,760 17,403,203 Percentage 100 100 100
As a partnership arrangement, the PPIAF is jointly governed. The PPIAF has four policy and administrative organs. DFID is represented on the first two:
The Program Council is the governing body of the PPIAF, composed of representatives of the 14 donors contributing resources to the PPIAF, and chaired by the World Bank. The Program Council, which meets once a year around June time, is responsible for defining programme policies and priorities, approving an annual work plan and financial plan, reviewing PPIAF performance and overseeing other PPIAF organs.
The Donor Steering Group provides strategic direction to the Program Council. Membership of this group is on a voluntary basis and decided in consultation with the full Program Council.
The Technical Advisory Panel (TAP), comprises six international experts. It provides independent advice on strategy and evaluates the impact of the PPIAF programme by carrying out evaluations of a sample of PPIAF projects.
The PPIAF Program Management Unit (PMU) is responsible for managing the day-to-day operations of the facility with a focus on reviewing proposals, arranging delivery of PPIAF programmes and activities, and proposing and administering the work plan and budget.
Further details on these organs and the PPIAF governance structure are provided in the PPIAF Program Charter, dated May 2001, as amended from time to time, available from its website:
www.ppiaf.org
All project proposals are assessed for value for money and their potential for impact by the PPIAF. Once approved, all activities follow World Bank procurement rules that require open and transparent competition to ensure value for money. A sample of activities are systematically evaluated by the Technical Advisory Panel of independent experts that reports to the Programme Council. PPIAF evaluations have confirmed that 84 per cent. of its activities have satisfactorily achieved their original objectives.
In 2004, PPIAF donors also commissioned an independent evaluation—the ‘Strategic Review', of the first five years of PPIAF's operations. The objective was to evaluate PPIAF's progress against its original objectives and identify ways for improving its performance. The report, issued in the final quarter of 2004, was very positive, concluding that the PPIAF is making an important contribution to development.
A number of recommendations were made that the PPIAF has since implemented. The recommendations included strengthening the strategic direction of the programme; increasing stakeholder involvement in the Program Council, more focus on outcomes rather than outputs; enhancing PPIAF's identity as an autonomous multi-donor facility and improving impact measurement.
Changes facilitated by the PPIAF often take a few years to deliver the anticipated improvements to the enabling environment. This has made it difficult to assess direct poverty impact to date. Improving impact measurement is an issue that is currently being addressed. One proposal is that PPIAF activity should be more closely anchored to planned infrastructure projects. Further work is in hand to gauge the impact of PPIAF activity on the International Financial Corporation's national ‘doing business' ratings that address various aspects of the enabling environment.
Country-specific activities may be undertaken only where governments seek the assistance of the PPIAF.
Consensus building is essential if reforms are to be successful. Governments are responsible for leading the process. The PPIAF has played an important supporting role. For example, the PPIAF has supported the development of a series of training courses on utility regulation and finance that have been targeted at key stakeholder groups including Ministers and senior Government officials, journalists and consumer associations. The aim of the training courses is to equip stakeholders with a sound knowledge with which to appraise reforms. Two training workshops have also been held for stakeholders. The first workshop was held in South Africa in June 2005 and the second was held in Costa Rica in February 2006. Feedback provided to PPIAF on the workshops has been very positive.
DFID last reviewed its involvement with the PPIAF in July 2005, when considering a request for continued support. This review drew heavily on the findings of the independent strategic review and progress on implementing its recommendations. The strategic review reported that the PPIAF has a comparative advantage over other facilities by demonstrating clear focus, global reach, strong donor support and efficient management. It confirmed that demand for PPIAF services by Governments of developing countries is growing and that continued DFID support is critical to growth and increasing the leverage of funds required for scaling up. On this basis, DFID agreed to continue its contribution to PPIAF for a further three-year period—July 2005 to June 2008.
Donors are asked annually to consider a financial plan incorporating an estimate of future calls on donors based on the anticipated demand by Governments. The PPIAF then considers requests for funding from Governments once a quarter in light of available funds and donor pledges. DFID has agreed an indicative biannual payment schedule for meeting our commitment to the PPIAF based on the financial plan. DFID funds are only ever released on evidence of need and good performance.
DFID consults with members of the public, NGOs and other stakeholders when setting the UK policy for international development. It is not practical to consult the public on the many individual funding decisions that DFID takes to deliver this policy.
(2) what assessment the Government have made of the value for money of the UK's involvement with the public private infrastructure advisory facility; and if he will make a statement;
(3) how the Government seeks to influence the activities of the public private infrastructure advisory facility; what recent representations the Government have made; and if he will make a statement;
(4) what the objectives are of UK involvement in the Public Private Infrastructure Advisory Facility; what UK funding has been provided in each year to the Facility for (a) energy production, (b) the water industry and (c) other functions; and what UK funding has been allocated in each of the next three years.
Improving infrastructure is essential for achieving economic growth in developing countries. There is also a pressing need to increase the efficiency of infrastructure to give greater access to the poor and better value for money. Current investment flows are insufficient to fund these additional needs and the public sector alone cannot bridge the financing and efficiency gaps. A significant contribution from the private sector will be required. However, attracting private capital and participation is difficult—according to World Bank figures, private investment in developing country infrastructure fell from US$ 49.6 billion in 1997 to US$ 12.5 billion in 2003.
Among the main constraints on successful private sector participation in infrastructure are the lack of appropriate policies, laws, regulations and institutions and the weak capacity of the public sector to effectively manage private sector involvement. The PPIAF is a global technical assistance facility managed by the World Bank to address these constraints and, where requested to do so by developing country Governments, facilitate and raise the quality of private sector involvement in infrastructure. The PPIAF is a good example of successful donor harmonization in development. It is supported by 14 donors with a wide range of skills, knowledge and experience. As of April 2006, it had approved $US 108.7 million funding for 495 activities in 101 countries. This funding mobilised an additional US$ 59.8 million co-financing from governments and other donors.
A particular strength of the PPIAF is its open and transparent systems of governance. These include procedures governing the application for, and allocation of, activity funds. As a partner in a multilateral facility, DFID abides by the endorsed systems and governance arrangements.
DFID fully endorses the PPIAF's objective to help developing countries to improve the quality of their infrastructure for the benefit of the poor through effective public-private partnerships. In practice, this is largely achieved by helping governments improve their policies, laws regulations and institutions (their “enabling environment”). Our other objectives are to encourage greater donor coordination in designing solutions to meet the demands of developing countries, reducing transaction costs for developing countries and effective dissemination of lessons learned.
DFID does not earmark its contribution to the PPIAF. Funding is pooled with that of other donors. The breakdown of total PPIAF expenditure in US dollars by sector for each of the last three years is provided in the table below. Future allocations will depend on demand from Governments of developing countries.
2003 2004 2005 Energy US$ 792,010 2,229,500 3,663,675 Percentage 6 16 21 Water US$ 3,452,122 2,700,118 3,171,640 Percentage 34 19 18 Telecom US$ 2,745,040 1,536,218 796,600 Percentage 19 11 5 Transport US$ 3,624,750 1,701,270 3,361,993 Percentage 25 12 19 Multi-sector US$ 3,690,383 6,053,654 6,409,295 Percentage 26 43 37 Total US$ 14,304,305 14,220,760 17,403,203 Percentage 100 100 100
The PPIAF has good systems for assessing outcomes. The following table provides broad details of these by main category since the PPIAF's inception in 1999 to December 2005.
Category Completed activities Facilitating transactions 54 Creating/strengthening regulatory institutions 34 New legislations and regulations 24 Public Private Sector Strategies 26 Workshops concerned with the above 176
All project proposals are assessed for value for money and their potential for impact by the PPIAF. Once approved, all activities follow World Bank procurement rules that require open and transparent competition to ensure value for money. A sample of activities are systematically evaluated by the technical advisory panel of independent experts that reports to the Program Council, which is composed of representatives of the 14 donor members. PPIAF evaluations have confirmed that 84 per cent of its activities have satisfactorily achieved their original objectives.
In 2004, PPIAF donors also commissioned an independent evaluation the ‘Strategic Review', of the first five years of PPIAF's operations. The objective was to evaluate PPIAF's progress against its original objectives and identify ways for improving its performance. The report, issued in the final quarter of 2004, was very positive, concluding that that PPIAF is making an important contribution to development. A number of recommendations were made that the PPIAF has since implemented. The recommendations included strengthening the strategic direction of the programme; increasing stakeholder involvement in the PPIAF's Program Council; more focus on outcomes rather than outputs; enhancing PPIAF's identity as an autonomous multi-donor facility, and improving impact measurement.
Changes facilitated by the PPIAF often take a few years to deliver the anticipated improvements to the enabling environment. This has made it difficult to assess direct poverty impact to date. Improving impact measurement is an issue that is currently being addressed. One proposal is that PPIAF activity should be more closely anchored to planned infrastructure projects. Further work is in hand to gauge the impact of PPIAF activity on the International Financial Corporation's national ‘doing business' ratings that address various aspects of the enabling environment.
DFID is an active member of the PPIAF's Program Council and we are involved in discussions about the strategic direction of the PPIAF. Over the past couple of years, DFID and other donors have sought to encourage the PPIAF to make better progress on measuring the impact of its activities on poverty alleviation and to better co-ordinate its activity with others.
Rotavirus
DFID supports partner countries to strengthen the health system to address all major causes of disease including the prevention and management of childhood diarrhoea.
The Global Alliance for Vaccines and Immunisations (GAVI) alliance board recently approved US$15 million for the completion of clinical trials of rotavirus vaccines in Africa and Asia during the period 2006-09. Furthermore, the board requested the development of an ‘investment case' for the introduction of rotavirus vaccine, to be submitted to the November 2006 joint meeting of the GAVI alliance and GAVI fund boards. If approved, GAVI would finance rotavirus vaccine in GAVI-eligible countries (those with GNI of below $1000 p.a). The request for an investment case clearly signals GAVI's interest in supporting rotavirus vaccine.
DFID is a strong supporter of GAVI. We have committed £68.5 million between 2000-08. Our main approach to financing GAVI over the next decade is through the International Finance Facility for Immunisation (IFFIm). The IFFIm is expected to provide GAVI with $4 billion over 10 years and DFID has committed to provide one third of the finance required to deliver this (approximately £1.38 billion to 2025).
DFID plans to sign a memorandum of understanding with the International Centre for Diarrhoeal Disease Research, Bangladesh for £7.5 million core funding for five years. This includes funding their work on a new oral vaccine for rotavirus.
DFID also supports Unicef and WHO; much of their work supports the management of common childhood illnesses
Street Children (Central America)
On 26 May 2006, my hon. Friend the Under-Secretary of State for International Development responded to a letter from Casa Alianza, forwarded by my right hon. Friend the Member for Oxford, East (Mr. Smith) outlining recent DFID assistance to street children in Central America. He would be happy to meet with representatives of Casa Alianza to discuss further the situation of street children and how DFID works in Central America.
Tobacco Control
The UK was one of the first to ratify the World Health Organisation Framework Convention on Tobacco Control (WHO FCTC): 168 countries have now done so. Since the adoption of the convention, the WHO FCTC secretariat has been working to ensure that as many countries as possible sign and ratify the treaty through awareness-raising among politicians, policy-makers, health professionals and society at large. Regional and national consultations to assist countries in preparing for the ratification and implementation of the WHO Framework FCTC have taken place. The WHO Tobacco-Free Initiative is also providing technical support to countries to assist them with implementation.
In order to support the development of a strong FCTC and combat tobacco industry disinformation, an alliance of non-governmental organizations from around the world has been formed. Now comprising more than 200 groups from more than 90 countries, the Framework Convention Alliance (FCA) is playing a key role in educating policymakers and strengthening cooperation across borders.
The health impacts of tobacco use in developing countries are of increasing concern. By 2030, tobacco will be responsible for ten million deaths per year, and 70 per cent. of these deaths will be in the developing world. The UK is taking action to address this problem.
Firstly, the UK played a key role in negotiating and ratifying the WHO'S Framework Convention on Tobacco Control, which sets international standards on tobacco price and tax increases, tobacco advertising and sponsorship, labelling, illicit trade and second-hand smoke among others. Secondly, we have recently given the International Development Research Centre a £1.1 million grant over 3 years for research into effective tobacco control policies and programmes that will minimize the threat of tobacco production and consumption to health and human development in developing countries. Thirdly, we provide advice to tobacco-dependent poor countries on constraints to their economic development and the livelihoods of their citizens.
As a final point, DFID's focus on improving health systems will impact on the adverse health effects of tobacco. We are currently revising our health strategy and looking at whether we should be doing more on tobacco control. As part of developing our strategy, we are specifically commissioning some work to help guide us in this area.
Trade Matters
Freer and fairer trade is vital for poverty reduction, and “Trade Matters” is DFID’s most popular downloaded publication. So far 150,000 copies have been printed in hard copy at a cost of around 64p a copy, totalling some £96,214. It would incur a disproportionate cost to disaggregate specific costs of distribution from the general costs of distributing all DFID publications. However, DFID has spent £26,928 on the promotion of Trade Matters, with flyers in The Independent, New Statesman, Big Issue in the North, Sunday Herald, The Grocer, SAGA magazine, and the full publication in the Women’s Institute magazine.
Yugoslavia
According to the United Nations High Commission for Refugees (UNHCR), the following numbers of people were internally displaced (IDPs) in the former Republic of Yugoslavia as of the end of 2005. The UNHCR does not have data on ethnic origin.
Country Refugees1 Asylum seekers2 Returned Refugees3 IDPs4 Returned IDPs5 Stateless Persons6 Various7 Total Bosnia and Herzegovina 10,568 215 1,273 182,747 5,164 — — 199,967 Croatia 2,927 8 5,261 4,804 2,736 20 — 15,756 Serbia and Montenegro (including Kosovo) 148,264 33 5,828 246,391 2,482 — 85,000 487,998 Slovenia 251 185 — — — 445 — 881 The Former Yugoslav Republic of Macedonia 1,274 723 2,200 123 4,320 1 Persons recognized as refugees under the 1951 UN Convention/1967 Protocol, the 1969 OAU Convention, in accordance with the UNHCR Statute, persons granted a complementary form of protection and those granted temporary protection. 2 Persons whose application for asylum or refugee status is pending at any stage in the procedure. 3 Refugees who have returned to their place of origin during the calendar year. Source: Country of origin and country of asylum. 4 Persons who are displaced within their country and to whom UNHCR extends protection and/or assistance. 5 IDPs of concern to UNHCR who have returned to their place of origin during the calendar year. 6 Persons who are not considered nationals by any country under the operation of its laws. 7 Persons of concern to UNHCR not included in the previous columns (in the case of Serbia, local residents deemed at risk by UNHCR). Source UNHCR 2005 Global Refugee Trends.
Wales
NHS Operations
Statistics Wales released figures on 28 June 2006 relating to NHS hospital waiting times as at 31 May 2006. These figures show that 768 Welsh patients were waiting for more than six months for inpatient and day care treatment at non-Welsh NHS Trusts.
Further information can be found at http://www.statswales.wales.gov.uk/ReportFolders/Report Folders.aspx
Sickness Absence
The Wales Office does not collect this information in this way, and obtaining this information could be achieved only at disproportionate cost.
Home Department
Human Trafficking
The UK is currently considering whether to sign the Council of Europe Convention on Action against Human Trafficking. The Government are examining how the convention’s approach could best be harmonised with effective immigration controls. The responses to the recent consultation paper on a proposed UK Action Plan on trafficking in humans will assist the Government in taking a decision on signature.
The Serious Organised Crime Agency, together with the new UK Human Trafficking Centre, is at the forefront of tackling human trafficking within Europe. We have today launched a consultation paper setting out a further package of measures, such as increased data sharing and organised crime civil orders, aimed at helping law enforcement agencies better target and disrupt the activities of organised criminals.
One of the aims of the recent police led multi-agency operation (called Operation Pentameter) which aimed at tackling trafficking for sexual exploitation was to raise awareness of the issue among the public and key stakeholders to be followed by a series of enforcement campaigns across the country. Examples of materials produced by Pentameter include posters in ports of entry in a variety of different languages and leaflets handed out to passengers at ports highlighting the dangers of trafficking.
Work abroad is also undertaken by the Home Office, in conjunction with the Foreign and Commonwealth Office and the Department for International Development to prevent trafficking by investing in projects in key source and transit countries to raise awareness of trafficking.
In the recent consultation on proposals for a UK Action Plan on Human Trafficking views were invited on how to raise awareness among potential trafficking victims about the risks of being trafficked. A summary of responses was published on 21 June and the suggestions put forward will be considered in developing the final UK action plan to be published later in the year.
The total amount of funding for UK policing, provided directly from the Home Office (Project Reflex) amounts to £5.7 million per annum and is allocated until 2008. The UK Human Trafficking Centre will be funded from within this.
The Home Office is undertaking a review to determine the extent to which the United Kingdom complies with the Articles set out in the Optional Protocol on the sale of children, child prostitution and child pornography.
The Government is keen to ratify the Optional Protocol as soon as possible but also wants to ensure that there are no gaps in the measures which exist to protect children in the way the Protocol intended. Once the Government are confident that the United Kingdom is fully compliant, the Optional Protocol will be ratified.
Community Support Officers
The delivery of 16,000 police community support officers nationally by next April, with 138 of these in Northamptonshire, will be a significant boost to neighbourhood policing and tackling the Respect Agenda. The funding of PCSOs comes from general police funding, pooled Government grant in the Neighbourhood Renewal and Safer and Stronger Communities Fund, funding by partners in community safety and specific grant from the Home Office, not simply the latter as the hon. Gentleman has mentioned. Even so, we will be giving Northamptonshire Police Authority nearly £1.6 million of new money this year in the Neighbourhood Policing Fund.
Alcohol Exclusion Zones
No research has been undertaken into the effectiveness of designated public place orders (DPPOs) as they tend to form just one part of a wider local strategy for tackling alcohol-related antisocial behaviour. However, of the 184 local authority areas that have adopted DPPOs, 72 have more than one in place suggesting that the orders are helping police deal with the problem of alcohol misuse.
A series of alcohol misuse enforcement campaigns have targeted alcohol-related crime and disorder since 2004 through the use of fixed penalty notices and test-purchasing operations. Antisocial behaviour orders, contracts and dispersal powers are also powerful tools in dealing with antisocial behaviour or alcohol related disorder on our streets.
Biometric Passports
Identity fraud costs the UK economy at least £1.7 billion each year and we have set up a public-private sector work programme to tackle all aspects of this problem. Our plans for a National Identity Scheme will also provide people with a highly secure means of protecting their identity.
Crime Reporting
Members of the public can report “non-emergency” crime and hate crime/incidents to a third party online via the national Police Portal (www.police.uk). Incident specific forms are available that seek information from the public. The information is then sent to the force in whose area the alleged crime is committed. Visitors to the portal are advised to dial 999 in an emergency.
Doctors
I am advised that up to 13 July 2006 there have been 495 work permit applications for doctors to undertake medical training under the newly introduced requirement.
Domestic Violence, Crime and Victims Act
The sections within the Domestic Violence, Crime and Victims Act are being introduced gradually and as resources become available.
There have been no arrests in West Lancashire under section 5 of the Act, which came into force in March 2005 and creates an offence of causing or allowing the death of a child or vulnerable adult.
The new powers of arrest, which were created under section 10(1) of the Act were repealed in January 2006 by the introduction of section 110 of the Serious Organised Crime and Police Act 2005, which made all offences arrestable. As section 10(1) of the Domestic Violence, Crime and Victims Act had not been implemented, data on the number of arrests for domestic violence related incidents under these powers are not available centrally.
However, data from January 2006 to March 2006 on domestic violence arrests for all police forces, covering the extended powers of arrest, will be published this autumn and data from April 2006 to March 2007 will be published in autumn 2007.
Dorset Constabulary
The information is set out in the following table.
£ million General grant1 Capital provision, specific grants and special formula grant Total 1997-98 54.1 1.4 55.4 1998-99 54.9 3.7 58.6 1999-2000 56.6 4.4 61.0 2000-01 58.4 2.0 60.4 2001-02 60.0 5.5 65.4 2001-022 58.3 5.5 63.8 2002-03 59.7 5.7 65.4 2003-04 61.6 6.8 68.3 2004-05 63.6 6.6 70.1 2005-06 66.0 7.2 73.2 2005-063 58.2 15.0 73.2 2006-074 60.0 16.4 76.4 1 Total government grants includes general grant (Home Office police grant, DCLG/Welsh Assembly Government Revenue Support Grant and National Non-Domestic Rates). It also includes specific grants: Crime Fighting Fund, Rural Policing Fund, Basic Command Unit funding, Community Support Officers funding, Neighbourhood Policing Fund, Airwave, DNA Expansion Programme, Special Priority Payments and capital grants. Pensions deficit grant and Dedicated Security Posts funding is included for 2006-07. Special formula grant in 2006-07 comprises the former specific grants Rural Policing Fund, Special Priority payments, DNA grant and South East/London allowances. 2 Figures 2001-02 not directly comparable with 2002-03 due to transfer of funding for NCS/NCIS from police authorities to Home Office. Adjusted figures are comparable with subsequent years. 3 Figures for 2006-07 are not directly comparable with 2005-06 owing to the transfer from general to specific grant of pensions’ and security grant. The adjustments to 2005-06 render them comparable with those for 2006-07. 4 General grant allocations are net of Amending Report adjustments for 2004-05 and 2005-06 that took account of ONS population data changes and some pensions’ data changes.
Drug Classification Review
Since coming into post the Home Secretary has not had the opportunity to decide how to proceed with the matter. In any event, it is sensible to take into account the conclusions drawn by the House of Commons Science and Technology Committee in its inquiry into “Scientific advice, risk and evidence: how Government handles them” which is using the classification of illegal drugs as one of its case studies.
Firearms
[holding answer 14 July 2006]: There are no central guidelines on the disposal of firearms except where firearms seized in respect of criminal offences. In such cases an order for their disposal are normally sought from the trial judge or magistrate. In these circumstances, the forfeiture and/or destruction order (as applicable) is actioned locally, at force level.
Disposal is also undertaken locally in cases where firearms are seized by the police from licensed firearms holders as a result of a breach of licence conditions or where the person is no longer considered to be fit and proper to hold the weapon; or where members of the public surrender firearms voluntarily to the police.
The only exception is where firearms are considered to have historical significance or instructional value for training. In such cases the weapons may be retained in liaison with a museum or the Royal Armouries or by the police in secure conditions as instructional aids.
Fox Hunting Ban (Scotland)
This is an operational matter for chief officers.
Gun Crime
The requested data is not in a form suitable for publication.
Handling Centres
The Policing Bureaucracy Taskforce recommended in its report published in July 2002 that greater use should be made of prisoner processing units (PPUs) to handle and interview suspects and to complete initial case preparation with a view to freeing up patrol officer time.
The use of PPUs, also referred to as Investigation and Detainee Handling Centres (IDHCs) helps provide an appropriate level of expertise in dealing with volume crime arrests and to enable designated police staff to be employed flexibly within such units. The performance drive and focus is in line with Office for Criminal Justice Reform’s objective to bring more offences to justice through a more modern and efficient justice process by supporting all criminal justice agencies in working together to provide an improved service for the public.
The provision of detention facilities within each force area is an operational matter for the chief officer of the force concerned. Information is not held centrally on the number of units or centres. objective to bring more offences to justice through a more modern and efficient justice process by supporting all criminal justice agencies in working together to provide an improved service for the public. The provision of detention facilities within each force area is an operational matter for the chief officer of the force concerned. Information is not held centrally on the number of units or centres.
Haringey Coroner Services
The Home Office does not hold information on (a) the pathologists instructed by specific coroners, (b) the coroners instructing forensic pathologists on the Home Office Register or (c) the age of the pathologists on the Home Office Register. I am therefore unable to provide the information requested.
Knives
Although the homicide figures record where a knife or other sharp instrument has been used, other crimes specifically involving the use of a knife cannot be separately identified in the recorded crime statistics or the court proceedings data.
Mohammed Siddique Khan
[holding answer 3 July 2006]: It is the Government's policy not to comment on speculation about specific intelligence.
Murders
The information available centrally relates to homicides recorded by the police in England and Wales for each year between 1995 and 2004-05 where there was a family relationship between victim and suspect. Figures are also provided for this period where the suspect was known to be intoxicated at the time of the offence, but as they are based on information notified to the Home Office, rather than the actual case files held by the police or the court records, it may understate the true position. Figures are contained in the table.
Extended family relationship2 Alcohol related3 1995 232 107 1996 218 87 1997 226 84 1997-98 214 74 1998-99 194 75 1999-2000 186 48 2000-01 247 61 2001-02 232 3161 2002-03 230 172 2003-04 206 181 2004-05 213 170 1 As at 28 November 2005; figures are subject to revision as cases are dealt with by the police and by the courts, or as further information becomes available. 2 From the information notified to the Home Office, the relationship between victim and suspect is known to be within the following categories: Son, daughter (including adopted) Stepson, stepdaughter (including child of suspect's cohabitant/lover Spouse Ex-spouse, estranged spouse Cohabitant, common law spouse Ex-cohabitant, ex-common law spouse Lover, mistress Ex-lover, ex-mistress Lover's spouse, spouse's lover, cohabitant's spouse or lover, lover's lover Homosexual/ex-homosexual relationship—long-term Homosexual relationship—casual Other family (including foster children). 3 From the information notified to the Home Office, the suspect is known to have been intoxicated at the time of the offence, or on drink and drugs. The drink and drugs related cases may include those where drink was not the primary factor. The figures are affected by recording changes, most notably in 2001-02 when some forces introduced a new notification system.
Available figures relate to the number of homicides recorded by the Metropolitan police in each London borough from 2000-01 to 2004-05 and are contained in the following table.
Period offence initially recorded 2000-01 2001-02 2002-03 2003-04 2004-05 Barking and Dagenham 4 2 3 4 8 Barnet 8 4 5 2 5 Bexley 3 2 2 0 2 Brent 6 12 6 10 18 Bromley 7 3 4 2 3 Camden 7 10 16 1 8 City of Westminster 8 8 9 6 5 Croydon 3 7 6 12 10 Ealing 8 9 9 6 8 Enfield 2 6 6 6 12 Greenwich 4 5 4 12 8 Hackney 14 14 6 20 9 Hammersmith and Fulham 6 10 6 4 4 Haringey 9 7 17 12 10 Harrow 3 3 0 3 0 Havering 5 3 1 6 0 Heathrow 0 0 0 0 0 Hillingdon 2 2 5 6 2 Hounslow 5 6 2 7 6 Islington 11 9 3 5 7 Kensington and Chelsea 4 3 3 1 9 Kingston upon Thames 1 3 0 1 2 Lambeth 13 17 15 12 10 Lewisham 6 7 5 9 5 Merton 3 2 3 2 0 Newham 11 7 14 15 10 Redbridge 5 3 5 8 4 Richmond upon Thames 2 0 2 3 3 Southwark 15 11 11 13 9 Sutton 3 2 3 1 1 Tower Hamlets 4 9 11 11 8 Waltham Forest 4 5 7 9 5 Wandsworth 3 11 6 2 4 Total 189 202 195 211 195 1 This measure is the one used generally for recorded crime statistics. It differs from the more commonly used ‘currently recorded’ homicide measure, which excludes cases where a suspect has been acquitted or convicted of a lesser offence. Figures using this measure are not available below police force area level.
Parking (Lancashire)
Available information on fixed penalty notices relating to all offences of obstruction, waiting and parking within the Lancashire police force area during the calendar years 2000 to 2004 (latest available) is given in the following table.
Information for 2005 will be available early in 2007.
Number of tickets Endorsable Non-endorsable Fixed penalty notices issued 2000 6 64,900 2001 6 56,000 2002 4 47,700 2003 8 31,800 2004 9 17,700 1 Offences under the Road Traffic Act 1988 s.22; Transport Act 2000 ss. 173 (5); 173 (6); 173 (7); 174 (3); 175 (2); 175 (3); 175 (4); 190 Highway Act 1835 ss 72 & 78; RTA 1988 ss. 19 & 21; Highways Act 1980 s. 137 (1); Road Traffic Regulations Act 1984 ss. 5 (1), 8, 32-36 and 45-53; Road Vehicles (Construction and Use) Regulations 1986 Regs. 101 and 103; Transport Act 2000 Part III.
Parliamentary Questions
[holding answer 5 June 2006]: Internal management information shows that 565 parliamentary questions tabled before 5 May remained unanswered on 25 May.
Police
The proportion of each police authority’s budget met from the police precept on council tax in 2006-07 is set out in the table. There are clearly differentials in precepts between a number of neighbouring police authorities.
I refer the hon. Member to the reply given on 19 June 2006, Official Report, column 1057.
Police authority Percentage Avon and Somerset 31.4 Bedfordshire 26.8 Cambridgeshire 33.2 Cheshire 26.2 Cleveland 21.9 Cumbria 31.3 Derbyshire 29.7 Devon and Cornwall 30.1 Dorset 41.6 Durham 17.9 Essex 29.8 Gloucestershire 40.1 Hampshire 29.4 Hertfordshire 32.5 Humberside 25.3 Kent 28.7 Lancashire 21.8 Leicestershire 27.3 Lincolnshire 32.3 Norfolk 35.3 Northamptonshire 34.1 North Yorkshire 42.4 Nottinghamshire 25.0 Staffordshire 32.5 Suffolk 32.8 Surrey 45.6 Sussex 31.2 Thames Valley 33.7 Warwickshire 35.3 West Mercia 36.4 Wiltshire 34.5 Total Shires 31.1 Greater Manchester 17.0 Merseyside 17.4 Northumbria 11.7 South Yorkshire 18.3 West Midlands 13.6 West Yorkshire 19.3 Total Mets 16.2 Total England (exc. London) 26.5 Metropolitan 25.0 (Total England (inc London) 26.1 Dyfed-Powys 37.4 Gwent 28.4 North Wales 37.9 South Wales 25.4 Total Wales 30.6 Total England and Wales 26.4 Source: English Police Authorities—Office of the Deputy Prime Minister Welsh Police Authorities—Welsh Assembly Government
The Independent Police Complaints Commission (IPCC) is responsible for the management of the police complaints system. I will ensure that the chairman receives a copy of the question and replies to you directly. Copies of the letter containing the IPCC’s response will be placed in the Library.
This is a matter for the police forces concerned and the information is not held centrally.
The available information is given in the following table.
Full-time equivalent 1994-95 1995-96 1996-972 1997-982 1998-993 1999-20003 2000-013 2002-03 2003-04 2005-05 Avon and Somerset 213 206 — — — — — 216 222 228 Bedfordshire 87 88 — — — — — 75 80 80 Cambridgeshire 95 90 — — — — — 85 99 101 Cheshire 187 191 — — — — — 194 200 194 Cleveland 88 87 — — — — — 64 73 2 Cumbria 116 116 — — — — — 107 110 108 Derbyshire 147 141 — — — — — 107 121 116 Devon and Cornwall 219 219 — — — — — 192 198 211 Dorset 98 94 — — — — — 91 86 82 Durham 113 114 — — — — — 111 119 108 Dyfed Powys 100 111 — — — — — 136 105 141 Essex 277 269 — — — — — 241 242 243 Gloucestershire 81 82 — — — — — 62 66 67 Greater Manchester 441 437 — — — — — 406 392 359 Gwent 93 90 — — — — — 93 95 96 Hampshire 265 268 — — — — — 248 246 244 Hertfordshire 159 156 — — — — — 150 151 149 Humberside 157 166 — — — — — 123 119 225 Kent 179 169 — — — — — 104 122 Lancashire 273 273 — — — — — 198 187 190 Leicestershire 105 87 — — — — — 92 95 85 Lincolnshire 104 101 — — — — — 90 89 96 London, City of 32 32 — — — — — 24 24 28 Merseyside 345 223 — — — — — 125 119 115 Metropolitan police 1,005 922 — — — — — 583 592 1029 Norfolk 109 111 — — — — — 120 121 107 Northamptonshire 93 91 — — — — — 70 71 65 Northumbria 225 221 — — — — — 245 253 165 North Wales 131 127 — — — — — 115 114 76 North Yorkshire 132 126 — — — — — 151 138 101 Nottinghamshire 154 154 — — — — — 26 121 133 South Wales 188 174 — — — — — 243 245 243 South Yorkshire 205 204 — — — — — 180 127 134 Staffordshire 238 227 — — — — — 50 49 58 Suffolk 76 70 — — — — — 68 72 76 Surrey 192 198 — — — — — 108 110 107 Sussex 231 202 — — — — — 164 163 163 Thames Valley 335 288 — — — — — 259 259 245 Warwickshire 123 117 — — — — — 103 103 93 West Mercia 134 178 — — — — — 292 115 117 West Midlands 417 417 — — — — — 384 405 393 West Yorkshire 343 341 — — — — — 320 314 317 Wiltshire 118 108 — — — — — 91 96 93 Total 8,423 8,084 — — 7,525 7,238 7,005 6,902 6,706 7,104 1 Staff with multiple responsibilities(or designations) are recorded under their primary role or function. The traffic function includes staff who are predominantly employed on motorcycles or in patrol vehicles for the policing of traffic and motorway related duties. This does not include officers employed in accident investigation, vehicle examination and radar duties. 2 Data is unavailable for 1996-97 and 1997-98 3 Data by police force area is not available centrally.
(2) what guidelines are followed when a minor is stopped and searched by the police;
(3) what guidelines his Department has issued on the length of time before stop and search records should be deleted;
(4) what guidelines his Department has issued on how long a stop and search record is retained in the case of an underage minor where there has been no further action after the initial stop and search;
(5) procedures are followed when an underage minor is stopped and searched by the police; and if he will make a statement;
(6) long the record is kept for a minor who is stopped and searched where no further action is taken; and if he will make a statement.
Code of practice A issued under the Police and Criminal Evidence Act (PACE) 1984 regulates contacts with the police and the public in the exercise of police powers to stop and search.
Code A requires that a record of the stop or stop and search must be made at the time unless there are exceptional circumstances. If the record is not given at the time, the person must be notified by the officer of their entitlement to a record if requested within 12 months and informed how a copy can be obtained. The decision to retain records after that period is a matter for individual chief officers, irrespective of whether the record relates to an adult or a juvenile and the outcome of the stop or stop and search.
Code A does not make special provision for the handling of a stop or stop and search involving a person under the age of 17 years old. Officers exercising these powers must do so fairly, responsibly and with respect for people being stopped or stopped and searched. It would be an operational matter for the officer concerned to determine whether any additional support or action would be required owing to the vulnerability of the individual; and guidance due for publication this summer by the National Centre for Policing Excellence highlights the need for officers to take account of the person's age and vulnerability .
Probation
We set out our plans for the probation service in “Working with probation to protect the public and reduce re-offending” which was published on 30 March. We will introduce the necessary legislation as soon as parliamentary time allows. The precise timing and form of that legislation has yet to be decided.
Prisons
The programme was introduced as a pilot only at HMP Dartmoor.
Following a review under Prison Service Order 4350 (Effective Regimes Interventions) the programme is currently being withdrawn. The Review Panel identified a range of concerns, the most significant being:
Poor quality of the manuals which did not demonstrate a structured and coherent programme
Lack of consistency and clarity about the primary aims of the programme
Lack of understanding and appropriate sensitivity to the diversity agenda of HM Prison Service
Lack of protocols for the management of the mentor system, making it unsafe
Inability of the programme to satisfy the Chaplaincy in a number of areas.
I have been asked to reply.
At present, improvement in literacy and numeracy for adults in custody is measured by reference to their overall contribution towards the Government’s Skills for Life targets by counting the qualifications achieved. For young offenders and juveniles in custody, the Youth Justice Board measures improvement by those serving custodial sentences of more than six months through an assessment at the start and end of the sentence that shows what they have achieved, and whether or not they have gained a qualification.
As new Learning and Skills Council-led delivery arrangements for offender learning are introduced across England from 31 July, data on individual achievement by offenders will start to become available for adults, young offenders and juveniles in custody, and on those serving sentences in the community.
A system of star ratings exists for prison health services. This is based on a framework of measures, including prison self-assessments, external inspection reports and prisons’ performance against key areas such as mental health and dental waiting times.
Since April 2006, HM Inspectorate of Prisons (HMIP) and the Healthcare Commission have worked in partnership through a Memorandum of Understanding. HMIP continues to inspect and report on the health outcomes for prisoners in all public sector establishments. The Healthcare Commission now assesses the effectiveness of primary care trusts’ commissioning arrangements.
Public Pensions (Transferability)
All public service schemes pay cash equivalent transfer values to other pension schemes in respect of accrued rights in compliance with pensions law. Under the Fair Deal for Staff Pensions there is a requirement to transfer pension rights when employments are transferred to the private sector under Public Private Partnerships or Public Finance Initiatives and subsequent transfers for former public servants. Public service scheme members can also transfer accrued pension rights by way of the Public Sector Transfer Club. The club is a network of public and private sector occupational pension schemes which makes it easier for employees who move between employers covered by separate participating schemes to transfer their accrued pension rights.
Scottish Criminal Records Office
My right hon. Friend the Secretary of State for the Home Department has not issued any advice in response to this case. However, The Association of Chief Police Officers (ACPO) National Fingerprint Board has issued a document dated 4 April 2006 entitled ‘Erroneous and disputed identifications: Learning from experience elsewhere’. This document is for guidance only and is not a policy document; it was circulated to all fingerprint bureau in police forces in England and Wales.
The ACPO report referred to Her Majesty’s Inspectorate of Constabulary Scotland’s inspection of the Scottish Criminal Records Office (SCRO) that commenced on April 2000. The key recommendations of the inspection report were that the SCRO should:
Move towards a non-numeric standard;
Reform management and scope demands for staff levels;
Consider moving to a centralised model for a national fingerprint service;
Have external provision and management of competency testing for experts to provide a sustainable and defensible programme;
Move towards a competency-based standard for expert qualification that all fingerprint experts within the SCRO should undergo;
Provide a common procedure to deal with failure in the course of competency testing; introduce an improved automated manual system of case tracking.
Produce national guidance on fingerprint standards and procedures and issue it to all fingerprint staff;
Establish a national policy which encapsulates an independent review process to deal with all erroneous and disputed fingerprints.
ACPO and the Home Office place a strong emphasis on ensuring forensic standards in fingerprinting. The Home Office will shortly be consulting about the creation of a forensic regulator (in accordance with the evidence given by the then Minister of State, the hon. Member for Leigh (Andy Burnham), before the Science and Technology Committee on 23 November 2005). The creation of the National Policing Improvement Agency through the Police and Justice Bill will also be very significant in providing an Agency dedicated to continuous improvement of policing, including the area of forensic science.
Terrorist Attacks (Compensation)
(2) what compensation payments the Government have made to the families of victims of the Bali bombings in 2002.
The Criminal Injuries Compensation Authority (CICA) awarded a total of £66,708 in compensation to 26 claimants in respect of the New York incidents of 9/11. The payments were made to them for the mental trauma they suffered from seeing their loved ones killed in the USA on live television here. No compensation payments have been made in respect of the Bali bombings. Through the Foreign Commonwealth Office’s ‘Aftercare Plan for victims of terrorism overseas’ the Government provide immediate assistance to the victims and families of overseas terrorism.
We do not hold information about compensation paid to the victims of these incidents by other Governments.
As at 30 June 2006, CICA had made 370 awards totalling £2.324 million in respect of the 7/7 bombings.
These comprised a mix of final awards and interim awards, and were paid both to victims and to families bereaved by the bombings. This figure will include some payments for non British nationals because neither nationality nor residence are criteria for claiming compensation under the Criminal Injuries Compensation Scheme.
World Cup
Police forces do not routinely provide the Home Office with information on specifically alcohol-related crime, and so it is difficult to gauge the effect of occasional events such as the World Cup on this. Police recorded crime statistics covering the period of the World Cup will be released in September.
The Home Office funded an Alcohol Misuse Enforcement Campaign (AMEC) during the month preceding the World Cup. Part of the intention for this was to set the tone of acceptable behaviour during the competition itself. Results from this campaign will be released shortly.
Research has suggested a link between major sporting events and domestic violence. Because of this, a Domestic Violence Enforcement Campaign took place in some areas during the World Cup. Data from this campaign are still being collected and analysed, and the results will be released when they are ready.
A police delegation of 78, undertaking a range of policing functions, were deployed in Germany for the duration of the England team’s participation in the tournament. In accordance with the European Union handbook on policing co-operation in respect of international matches the costs were met by the host authorities. A Home Office press officer was attached to the police delegation. Some minor costs and reimbursements will be met by the Home Office. These are yet to be claimed or calculated. The Home Office does not hold details of any other Government officials who attended the World Cup.
Solicitor-General
Correspondence
The information requested is not collated centrally and could be obtained only at disproportionate cost (code of practice on Access to Government Information, part 2, clause 9). The cost of a stamp is a post office cost. The cost of stationery is difficult to estimate but around £1 when all the overheads in terms of posting, computer costs and paper are taken into consideration. Staff time varies considerably based on the length of the letter. It is impossible therefore to estimate an average cost for all the letters sent out.
Departmental Finance Directors
I am answering this question for the Crown Prosecution Service, the Treasury Solicitor’s Department, the Revenue and Customs Prosecutions Office and the Serious Fraud Office.
The finance director of the Crown Prosecution Service is Mr. John Graham. He has a BA and MA in economics. He has extensive experience as a finance director and has fulfilled this role since 1999.
The finance director of the Treasury Solicitor’s Department is Tony Hindley. He is a Fellow of the Association of Chartered Certified Accountants (ACCA). He was appointed on 1 May 2003. He was previously head of corporate planning for Defence Scientific and Technology Laboratory. Other positions previously held include financial controller and company secretary at Defence Evaluation and Research Agency where he was also a member of the board of management; finance director at British Nuclear Fuels plc. (UK Group) and financial controller and member of the sector board at BNFL.
The head of resources and planning of the Serious Fraud Office is Bob Evans. This role incorporates the responsibility of a finance director. He is an MA (Gonville and Caius college, Cambridge) and Chartered Fellow of the Chartered Institute of Personnel and Development. He is currently studying for membership of CIMA and ACMA. He was appointed in November 2005. Previously he was a member of HM Treasury for 15 years. He has also served as a financial supervisor with the Bank of England and the Financial Services Authority, as economic adviser for the Ministry of Defence and has managed several large financial programmes and Government projects.
The head of finance for the Revenue and Customs Prosecution Office (RCPO) is Justin Freebairn. He holds an MA in Logic and Moral Philosophy (St. Andrews) and is a member of the Chartered Institute of Management Accountants. He was appointed in March 2006 following a number of senior finance positions both within and outside central Government.
Departmental Publications
My Departments are not generally responsible for drawing up and framing legislation. Where they are we always seek a full range of views in doing so. Consultation is a key part of the policy making process: both formal and informal.
The Attorney-General and I, along with our officials, hold regular meetings with representatives of the principal stakeholder groups, and relevant experts, in the areas for which we are responsible.
Documents which are laid before Parliament as unnumbered Command Papers are generally restricted to explanatory notes to treaties, explanatory memoranda to statutory instruments and some Treasury minutes. All other documents are published in the numbered Command Papers series.
A complete list of unnumbered Command Papers can be produced only at disproportionate cost. Copies of all unnumbered Command Papers are made available via the Vote Office.
Constitutional Affairs
Command Papers
Documents which are laid before Parliament as unnumbered Command Papers are generally restricted to Explanatory Notes to Treaties, Explanatory Memorandum to Statutory Instruments and some Treasury Minutes. All other documents are published in the numbered Command Papers series.
Details of unnumbered Command Papers published since 1976 can be produced only at disproportionate cost.
Coroners
A coroner has the duty to investigate a death abroad which is reported to him or her where the body is brought back to England and Wales and where there is a reasonable cause to suspect that the death was violent, or unnatural, or sudden and of unknown cause or where the death occurred in prison.
Under section 14 of the Coroners Act 1988 coroners have limited powers to seek to transfer cases to another coroner on grounds of expediency.
Proposals are outlined—in clauses 50 and 51—in the draft Coroners Bill which I published on 12 June 2006.
There is no compulsory retirement age for all coroners. However, coroners who held office immediately before April 6, 1978, and did not opt out of the statutory provisions, can be required by the relevant council to vacate office if they have completed 15 years service and attained the age of 65 years. Coroners’ pensionable service under the applicable local government scheme will come to an end at the age of 70 years.
There is no appeal against a coroner’s verdict at an inquest. However, each year a number of inquests are held, quashed or amended by order of the High Court, and the number of such occurrences over the last five years is shown in the table as follows.
Number of inquests held by order of the High Court Number of inquests quashed or amended by the High Court 2001 3 2 2002 2 1 2003 1 4 2004 1 1 2005 3 1
Removing boundary restrictions on coroners’ jurisdictions is a measure in the draft Coroners Bill which I published on 12 June 2006.
Court Facilities
There are 93 Crown courts 88 of which have dedicated witness facilities. Of the 355 operational magistrates courts 302 can provide dedicated facilities. The remaining courts, which are used on a more infrequent basis, make use of alternative facilities.
Crown Dependencies
I have not made any such assessment, however the governments of the Crown Dependencies have confirmed that they are satisfied that the Protocol has achieved the purposes for which it was established in 1972, that is the free flow of goods between the Islands and the European Community.
Departmental Premises (Security)
My Department uses a mix of in-house and contract security guards.
Where security guards are recruited directly to provide in-house services, recruitment is carried out in accordance with the requirements of the Civil Service Commissioners Code.
Two suppliers have provided manned guarding services to all Crown and county courts since 2000. Another supplier provides manned guarding services to offices on the DCA HQ estate. Under the terms of their respective contracts, these suppliers are required to carry out security vetting of personnel they propose using.
My Department assumed responsibility for magistrates courts in April 2005, many of which have contracts for manned guarding services awarded prior to this date. Information on individual contractual arrangements is not held centrally and could be obtained only at disproportionate cost.
A national procurement exercise covering all courts in England and Wales, which will standardise the contractual arrangements including vetting requirements, will begin later this year.
In 2005, an individual employed as a security guard by Her Majesty’s Courts Service, an Executive Agency of the Department, was found to be an illegal immigrant. His status was discovered in the process of an immigration officer's investigation, and he was found to have provided false information in order to obtain documents that showed him to be fit for employment. He was dismissed.
Departmental Staff
The statistics are provided as at 31 December 2005 as staff headcount:
Headcount Under 55 years 23,124 Over 55 years 5,499 Total 28,623 Note: Data on civil service entrants has been collected by the Cabinet Office on an annual basis. Previously published data on entrants has been based on Departments submitting returns on a ‘Mandate’ or summary level basis. Data on entry age is only available from Departments’ records of individual civil servants, as civil service statistics does not include this information for all Departments.
The statistics for the last three financial years are set out in the table as follows.
Financial year Total 1 April 2003 to 31 March 2004 1193 1 April 2004 to 31 March 2005 1299 1 April 2005 to 31 March 2006 345 Grand total 1 April 2003 to 31 March 2006 837 1 The figures do not include the magistrates courts prior to 1 April 2005.
Early Retirement
The number of employees who have taken early retirement due to ill-health in each of the last five years is set out as follows. These figures are for the period April to March for each of the years shown.
Number 2001 60 2002 38 2003 30 2004 27 2005 31
Family Courts
I refer my hon. Friend to my written statement of 11 July 2006, Official Report, column 60WS.
Home Repossessions
The following table shows the number of mortgage possession orders made in county courts in Hampshire and the Isle of Wight (includes Aldershot and Farnham, Basingstoke, Portsmouth, Southampton, Winchester and Newport) since 1987. These are the only county courts in Hampshire and Isle of Wight that deal with mortgage repossession matters.
The civil procedure rules provide that all claims for the repossession of land must be commenced in the district in which the land is situated. However, these county courts cover areas that are not necessarily consistent with other administrative or constituency boundaries, and therefore for instance repossessions at Portsmouth county court may relate to properties in other constituencies besides Portsmouth.
These figures do not indicate how many houses have been repossessed through the courts, since not all the orders will have resulted in the issue and execution of warrants of possession.
Possession orders made2 19873 19883 19893 1990 1991 1992 1993 1994 1995 1996 Aldershot and Farnham 118 370 663 486 470 322 344 291 309 172 Andover 27 28 15 46 88 75 93 59 67 20 Basingstoke 83 112 105 348 249 188 135 93 71 59 Portsmouth 906 649 683 1,088 1,211 1,115 617 423 259 126 Southampton 219 519 361 298 601 466 304 407 260 175 Winchester 62 48 47 40 78 52 50 33 32 9 Hampshire 1,415 1,726 1,874 2,306 2,697 2,218 1,543 1,306 998 561 Newport (IoW) 106 85 124 121 220 140 123 81 141 69 Isle of Wight 106 85 124 121 220 140 123 81 141 69
Possession orders made2199719981999200020012002200320042005Aldershot and Farnham1393415399666571103122Andover44—4—4—4—4—4—4—4—Basingstoke567028514643635872Portsmouth168324179135111142125158314Southampton9516414112210994107175223Winchester91311713611926Hampshire471605512414345350377503757 Newport (IoW)593633152221354862Isle of Wight593633152221354862 1 Local authority and private 2 The court, following a judicial hearing, may grant an order for possession immediately. This entitles the claimant to apply for a warrant to have the defendant evicted. However, even where a warrant for possession is issued, the parties can still negotiate a compromise to prevent eviction. 3 For they years 1987 to 1989, “Suspended orders” were not separately counted. They are thus included in “Orders made”. 4 This court no longer deals with civil procedures.
Legal Aid
Applicants for legal aid in housing cases can obtain legal aid for legal advice and information, investigative help, or legal representation, if they pass the standard tests of financial eligibility and if their case meets the criteria for the grant of funding, as set out in the Funding Code. Housing cases are considered a priority for funding, and the Funding Code criteria for legal representation in housing cases reflect this. Cases in which the roof over the applicant’s head is directly at issue are considered to be of “overwhelming importance” to the applicant and can be funded in a wider range of circumstances than other housing cases.
Legal Professionals
There are currently 100,938 solicitors and 11,818 (self-employed) barristers who hold practising certificates.
In 1992 these figures were 59,566 and 7,271 respectively.
In 1997 they were 71,637 and 9,369 respectively.
The information available is set out in the table.
2006 1996 1992 1983 1979 Barristers (self-employed) 3,543 2,115 1,420 573 409 Solicitors 41,967 21,356 15,653 5,117 3,700 Licensed conveyancers 533 1— 1— n/a n/a Fellows of the Institute of Legal Executives 4,811 3,307 1,592 n/a n/a Total 50,854 26,778 18,665 5,690 4,109 1 No data available.
In 2005, the average earnings of a solicitor were £35,000 per year. This figure is drawn from across the whole solicitors profession and so does not differentiate for size of firm, number of partners, grade of solicitor etc.
The full information, showing the breakdowns, is available in the Law Society's Private Practice solicitors' salaries 2005 fact sheet.
Information on salaries prior to 2001 is not available.
While I have no plans to carry out a survey of the socio-economic background of lawyers, I am taking forward a programme of work to encourage and increase diversity in the legal profession.
The information requested is not available.
Information about the earnings of barristers is not held centrally.
Long Trials
The Government are committed to ensuring that criminal cases are dealt with in a speedy fashion commensurate with the interests of justice. In the DCA command paper ‘A Fairer Deal for Legal Aid’ we clearly stated our aim to improve the financial control and overall management of the highest cost cases, achieving more timely and effective disposal.
We have put in place a number of measures to work towards this aim, such as the High Cost Cases Review Board, a cross-CJS board which aims to bring greater scrutiny to the way that high cost cases are managed.
The judiciary have also issued a number of protocols on the management of heavy fraud and other complex cases, terrorism cases and of the disclosure process, which are intended to ensure that judges actively case manage to minimise the length of trials, and that prosecution and defence teams comply with deadlines and directions.
The Criminal Case Management Framework promotes robust judicial case management among operational practitioners and provides guidance as to how cases should be managed efficiently and effectively from pre-charge through to conclusion. The Criminal Procedure Rules 2005 add a degree of prescription to the practices outlined in the CCMF by ensuring that criminal cases are dealt with efficiently and expeditiously.
Magistrates
In the year 2004-05 there were 28,300 magistrates of which 6.7 per cent. were members of the Black and Minority Ethnic community; 18.96 per cent. of magistrates were under 50 years of age.
In 2005-06 the magistracy increased to 28,865. Of these, Black and Minority Ethnic members rose to 7.2 per cent.; and magistrates under 50 rose to 20.16 per cent.
The gender split remains evenly balanced.
Magistrates Courts (Foreign Nationals)
Yes, where the court considers this information appropriate to the decision it intends to make for instance if a non-EU foreign national is found guilty of an imprisonable offence.
Yes, when it becomes relevant for instance when considering bail or sentencing for an imprisonable offence. In practice this is something that would be brought to the attention of the court by the prosecution.
Official Visits
In an official capacity over the last 12 months I have visited the North West five times, the East Midlands twice, the East of England once, the West Midlands twice, the South East once and have made 11 visits in London.
Public Appointments
Details of the public appointments to public bodies sponsored by the Department for Constitutional Affairs can be found in “Public Bodies”, copies of which are in the Library. “Public Bodies” has been published annually since 1980 and the most recent edition provides figures for 2005. Each edition of “Public Bodies” contains details on the number of public appointments and remuneration details for that particular year. Further information, including comparable information for 1976, in respect of Department for Constitutional Affairs could be provided only at disproportionate cost.
Small Claims Courts
Information on the average payment made to claimants on successful cases heard by small claims courts is not collected since payment will often be made between the parties without the court having been informed. The following table gives information on the average level of award in cases where the claimant (a) had legal representation and (b) had no legal representation in each year since 1997, drawn from a sample collected from 29 county courts during the months of February, July and November each year and aggregated to provide national figures.
Number of claims made where claimant was represented by a solicitor Average size of award for claims using a solicitor (£) Number of claims made by the claimant in person Average size of award for claims made by claimant in person (£) 1997 43,499 829.47 54,314 561.25 1998 45,517 1052.46 53,175 760.92 1999 46,149 884.35 42,255 706.29 2000 27,161 1389.41 28,675 1252.92 2001 29,877 1363.21 28,456 1344.92 2002 23,799 1157.99 31,920 1878.99 2003 22,114 1651.11 30,029 1387.44 2004 20,059 1411.48 26,041 1436.94 2005 20,554 1081.61 26,967 1029.15
Information on the number of cases that have been heard by small claims courts where (a) claimants had legal representation and (b) claimants had no legal representation in each year since 1997 is contained in the following table. The data are derived from case samples collected from 29 county courts during the months of February, July and November each year, which has then been aggregated to provide national figures.
Number of claims Represented by a Solicitor Claimant in person 1997 97,813 43,499 54,314 1998 98,692 45,517 53,175 1999 88,404 46,149 42,255 2000 55,836 27,161 28,675 2001 58,333 29,877 28,456 2002 55,719 23,799 31,920 2003 52,143 22,114 30,029 2004 46,100 20,059 26,041 2005 47,521 20,554 26,967
Small Claims Limit
The Government are currently working with stakeholders to make the claims process more timely, proportionate and cost-effective. We intend to publish a consultation paper later this year.
Social Exclusion
The Department for Constitutional Affairs (DCA) has an important role in the social exclusion agenda. We are promoting the benefits of good early advice services for those most in need. Evidence shows that this can prevent relatively simple civil legal issues spiralling into more complex problems. We are also encouraging closer working across Whitehall. Our role is crosscutting in highlighting the worth of advice services to Government colleagues. DCA is also the facilitating Department for other Government Departments that require a final remedy to be decided upon by a court or tribunal.
Specialisation and innovation in the courts system is also relevant. We are looking at both preventing crime through community justice initiatives, and re-integrating offenders into society. The Community Justice Centre in North Liverpool is spearheading such an approach.
Another main area of influence is the role of family courts. The recent Review of the Child Care Proceedings System in England and Wales (produced jointly with DfES) aims to achieve better lives for children and their families by improving the care proceedings system and eliminating unnecessary delay in care cases, while ensuring that the process remains a fair one. The DCA is also a key player on the Domestic Violence Inter-Ministerial Group. There are currently 25 Specialist Domestic Violence (DV) courts. A bidding process is currently under way to establish a second tranche of these courts by 1 April 2007.
Good, early advice services can prevent relatively simple civil legal issues developing into more complex and numerous problems. This is evidenced by the recent Legal Services Research Centre’s “Causes of Action” publication, which also highlights the tendency for inter-related problems to develop around a key theme (broadly around ‘family’, ‘homelessness’ and ‘economic’ clusters). The Legal Services Commission’s new Community Legal Service Strategy is informed by this research, and proposes that newly created Community Legal Advice Centres are located in areas of high deprivation in order to target the most vulnerable. My Department’s recent Getting earlier, better advice to vulnerable people document underlines the need for ensuring advice is people focussed, with problems not being considered in isolation. It also highlights the importance of getting advice right first time, and ensuring more effective referral networks are in place so that people get the service they need regardless of their point of access to the system.
As part of its role in delivering legal aid, the Legal Services Commission (LSC) considers the need for its services to help prevent social exclusion. The LSC can play its part by ensuring that services are better co-ordinated, focussed and effective, and that acts of advice/assistance increase. The new Community Legal Service (CLS) Strategy proposes that Community Legal Advice Centres (CLACs) are located in areas of high deprivation in order to target the most vulnerable. In less densely populated areas Community Legal Advice Networks (CLANs) will ensure that clients are able to access a range of high quality advice services regardless of their geographic location. Community Legal Service Direct also allows easy access for clients. The new CLS Strategy, in proposing that CLACs and CLANs will cover all five areas of social welfare law (Community Care, Housing, Debt, Employment and Welfare Benefits), will further promote social inclusion.
Special Advocates
I met with Mary Williams, the chief executive of Brake, on 3 May 2006 and discussed whether victims’ advocates should be extended to include deaths caused by driving offences. I also have regular discussions about the progress of the pilots with key stakeholders, in the pilot areas. No decisions will be taken about the future of the victims’ advocates scheme until we have assessed the success of the pilots.
Foreign and Commonwealth Office
Afghanistan
One UK Government secondee from the Ministry of Defence serves with the UN Assistance Mission in Afghanistan (UNAMA), acting as a military assistant to the Head of UNAMA.
Ascension Island
The value placed on domestic properties on Ascension Island for the purposes of property taxation, extracted from the Valuation Roll 2005-06, totals £22,335,333.
Pakistan
(2) what recent representations she has made to the Pakistani Government on the use of blasphemy laws.
I raised the situation of Christians in Pakistan during my meeting with Prime Minister Shaukat Aziz, on 7 March, asking him to take action to protect religious minorities in Pakistan.
Working with our EU partners, we raise our human rights concerns with the Government of Pakistan through regular démarches, as well as bilateral lobbying. The most recent demarche was presented to the Government of Pakistan in June 2006. In the démarche we reiterated our concerns over the abuses of the blasphemy laws and renewed our requests for the Government of Pakistan to repeal or modify them, to remove the possibility of the law being misused against minority communities.
There continues to be incidents of violence against Christians in Pakistan, although the Government in Pakistan is quick to condemn them. I raised the situation of Christians during my meeting with Pakistani Prime Minister Shaukat Aziz, on 7 March, asking him to take action to protect religious minorities in Pakistan.
We condemn instances where individuals are persecuted because of their faith whenever it happens and whatever religion of the individual or group concerned. We make regular representations to the Government of Pakistan on this issue, both through bilateral lobbying and working with our EU partners. This was last raised through an EU démarche in June 2006.
We have not made any representations on this case since January. We continue to lobby, both bilaterally and as part of the EU, on minority issues in Pakistan, to remove the possibility of the law being misused against minority communities. In June 2006, an EU démarche on human rights was delivered to the Government of Pakistan, which reiterated our concerns over the abuses of the blasphemy laws and renewed our requests to repeal or modify them.
Palestine
I have been asked to reply.
Emergency support through the temporary international mechanism has already begun to reach the occupied Palestinian territories. On 11 July, the European Community began providing fuel for emergency generators for hospitals in Gaza. This will enable essential health services to continue after electricity supplies were affected by recent damage to the Gaza power station. We expect that further assistance to health services throughout the West Bank and Gaza will begin during July.
I have been asked to reply.
The UK Government are deeply concerned at the increased violence between Israel and the Palestinians. We continue to urge both parties to act with restraint and to end the current cycle of violence. The case for the temporary international mechanism is strengthened by the worsening humanitarian situation. The mechanism has already provided emergency fuel supplies to generators at Gaza hospitals, keeping vital services going. Other assistance to continue health services is expected to begin shortly.
I have been asked to reply.
The temporary international mechanism is open to any donor that wishes to contribute. The European Community has committed €105 million. DFID intends to provide up to £12 million through the mechanism. We are aware that several European countries are considering contributions, but any announcement will be for them to make.
Culture, Media and Sport
Art Market
My Department sees maintaining the pre-eminent position of London within the global art market as vitally important. Through Arts Council England, we have invested around £480,000 of lottery capital funding into London studio spaces for artists. The Arts Council also supports a number of art fairs, including the Frieze Art Fair which last year attracted 31,497 people, encouraging new buyers for contemporary art and leading to £32 million of sales.
My Department sponsors a number of museums and galleries, a number of which have important contemporary collections. The Arts Council has also stimulated public interest in contemporary art through its Own Art Scheme, which offers interest free loans to open up the market to a wider range of people. Own Art, although primarily focused on the regions, is to be expanded to involve a number of art colleges in London.
Casinos
Under the Gambling Act 2005, local authorities acting in their capacity as licensing authorities will be responsible for issuing the one regional, eight large and eight small new casino licences permitted by the Act. Licensing authorities will be required to run the competitions for these licences in a fair and open way. These competitions are not expected to begin until mid-2007, and the identities of the bidding companies will not be known until then.
DCMS Ministers and officials have met frequently with casino and other companies that may be interested in bidding, and their representative bodies. These meetings have covered all aspects of the implementation of the Gambling Act and wider gambling policy, and are part of our regular and ongoing consultation with the gambling industry, local authorities and other stakeholders. Those meetings that have been identified that have taken place since 1 January 2006 are listed in the following table, and all these meetings took place in the UK.
Date DCMS Minister and/or official(s) present Who attended the meeting 18 January 2006 Richard Caborn Rank Group 6 February 2006 Official(s) British Casino Association 7 February 2006 Official(s) Representatives of the gambling industry, including British Casino Association and Casino Operators' Association 10 February 2006 Official(s) Rank Group 21 March 2006 Official(s) British Casino Association 11 April 2006 Official(s) Representatives of the gambling industry including the British Casino Association 20 April 2006 Official(s) Overseas casino operators including Ameristar, Kerzner International, MGM Mirage 10 May 2006 Official(s) British Casino Association 15 May 2006 Official(s) Representatives of the gambling industry, including British Casino Association and Casino Operators' Association 18 May 2006 Official(s) Rank Group 23 May 2006 Official(s) London Clubs International 24 May 2006 Richard Caborn and official(s) British Casino Association
Details of earlier meetings that may be relevant were included in my reply of 20 December 2005, Official Report, columns 2654-6W to the hon. Member for North-East Cambridgeshire (Mr. Moss).
One further meeting has been identified, which was inadvertently omitted from my earlier reply: DCMS officials and I met Detlef Kornett, Managing Director of the Anschutz Group in London on 7 July 2003. The minutes of this meeting were published on the DCMS website as part of a response dated 26 July 2005 to a request made under the Freedom of Information Act.
The process for considering local authority proposals for regional casinos is a matter within the discretion of the Casino Advisory Panel having regard to published criteria and to Government policy. Local authorities have no rights of appeal to the panel. The panel, however, has given interested parties the opportunity to submit further relevant information. The deadline for any such information was 28 June 2006.
Coastal Resorts
The Heritage Lottery Fund have awarded the following grants to English coastal resorts (as defined by the British Resorts Association) and Welsh coastal resorts since 1994-95 to 2005-06:
Region/coastal resort Number of projects Total value (£) England East Midlands Skegness 3 1,232,360 East Midlands total 3 1,232,360 Eastern Aldeburgh 3 133,842 Clacton-on-Sea 3 501,495 Cromer 4 787,300 Felixstowe 1 25,000 Frinton-on-Sea 1 6,500 Great Yarmouth 13 6,419,375 Hunstanton 1 38,000 Lowestoft 9 4,879,370 Sheringham 6 1,327,340 Southend-on-Sea 4 1,659,300 Southwold 2 308,600 St. Ives 1 67,600 Eastern total 48 16,153,722 North East 12 7,912,350 North Shields 9 1,652,600 Redcar 7 942,124 Saltburn-by-the-Sea 5 1,676,500 South Shields 10 6,074,725 Sunderland 18 15,751,100 Whitley Bay 3 157,680 North East total 64 34,167,079 North West Blackpool 10 6,063,500 Fleetwood 1 28,300 Grange-over-Sands 8 448,519 Lytham St. Annes 5 168,600 Morecambe 3 177,800 Southport 8 5,552,000 Thornton-Cleveleys 1 49,700 Whitehaven 7 1,386,400 North West total 43 13,874,819 South East Bexhill-on-Sea 4 3,341,900 Bognor Regis 3 1,802,700 Brighton 27 1,365,862 Broadstairs 1 433,000 Christchurch 2 413,400 Eastbourne 8 2,492,750 Folkestone 5 2,126,618 Hastings 8 4,819,100 Herne Bay 3 1,230,400 Hythe 2 2,581,750 Margate 5 1,954,725 Ramsgate 8 4,034,750 Ryde 6 2,383,500 Sandown 3 2,573,729 Southsea 4 479,465 Ventnor 1 30,000 Whitstable 4 490,625 Worthing 10 2,210,245 South East total 104 32,032,795 South West Bournemouth 7 3,431,025 Bristol 78 73,601,388 Brixham 4 119,300 Bude 5 85,700 Burnham-on-Sea 1 431,400 Christchurch 2 2,670,000 Clevedon 2 1,221,013 Dartmouth 2 72,000 Dawlish 1 20,400 Exmouth 1 50,000 Falmouth 22 21,017,031 Ilfracombe 3 1,203,000 Lyme Regis 6 492,800 Minehead 6 787,000 Newquay 3 89,000 Paignton 2 71,700 Penzance 23 4,384,812 Poole 9 1,480,700 Sidmouth 3 684,100 St. Ives 2 648,700 Swanage 3 109,600 Teignmouth 1 50,000 Torquay 9 7,530,800 Weston-super-Mare 11 2,042,140 Weymouth 5 2,747,288 South West total 211 125,040,897 Yorkshire and the Humber Bridlington 4 184,900 Cleethorpes 2 324,000 Filey 3 114,000 Hornsea 3 186,900 Scarborough 16 3,472,500 Whitby 15 7,397,100 Withernsea 1 3,800 Yorkshire and the Humber total 44 11,680,200 England total 517 234,184,872 Wales Aberystwyth 18 3,892,036 Colwyn Bay 10 914,981 Llandudno 8 1,770,910 Porthcawl 2 102,865 Prestatyn 3 9,357 Rhyl 13 2,733,523 Swansea 68 14,448,580 Tenby 13 1,104,401 Wales total 135 24,976,653
Engagements
I refer the hon. Member to the answer given on 11 July 2006.
Gambling
The Government have no plans to introduce a statutory levy to finance the integrity of sports.
The Gambling Act 2005 will be fully implemented by September 2007. Under current plans local authorities will begin to consider the first applications for premises licences from 31 January 2007. My officials are discussing with the Local Authorities Co-ordinators of Regulatory Services—LACORS—the timetable and resources needed to achieve this date.
Illegal Sports Betting
(2) what discussions her Department has held with (a) EU and (b) other countries sports ministers on tackling illegal betting from overseas on UK sporting events.
I outlined the Government's internal arrangements to protect the integrity of sporting events on which betting takes place with Jean-Francois Lamour, French Minister for Youth, the Sports and Community Life at a recent meeting in Paris. I have subsequently written to Monsieur Lamour explaining these arrangements in more detail.
The Gambling Commission works closely with gambling regulators in other jurisdictions on a range of issues, including mechanisms for exchanging information on gambling operators and procedures to address illegal practices in gambling.
The Gambling Commission may, once the provisions of the Gambling Act 2005 are implemented in September 2007, require any betting operator it licenses to provide information on bets that are placed with that operator. The Commission may share that information with the sports governing bodies listed under Schedule 6 of the Gambling Act. While the Gambling Commission has no jurisdiction over betting operators licensed outside Great Britain, it is continuing to build upon its co-operative relationships with overseas gambling regulators.
The Government have worked with sports governing bodies to develop a 10 point plan which facilitates information sharing between sports bodies and betting operators.
So far eleven sports bodies have signed up to the voluntary plan and an increasing number have Memoranda of Understanding with betting operators allowing for the sharing of information about suspicious betting patterns or individuals betting with those operators here or abroad.
Judicial Review
I informed the hon. Member in my reply to him of 5 July 2006, Official Report, column 1097W, that the information requested is not held centrally. The request includes all judicial review claims brought against the Department of Culture, Media and Sport, not just those in which judgment was given by the court but also all those withdrawn or settled by the parties and those where the court did not grant permission to proceed. The information will be held on files of Her Majesty’s Court Service, of the Department for Culture, Media and Sport and of the Treasury Solicitors Department. It is open to hon. Members and members of the public to make a request for information under the Freedom of Information Act Some information is also available on Her Majesty’s Courts Service website www.hmcourts-service.gov.uk and other legal research databases, although these may be selective and are likely to be confined to cases that proceeded to judgment.
Liquor Licences
Licensing authorities became responsible for licences granted under the Licensing Act 2003 on 7 February 2005. All licences granted under the previous alcohol licensing regime became invalid when the Licensing Act 2003 came fully into operation on 24 November 2005, regardless of whether they had been due to expire after that date. Under the new licensing regime there is no renewal date for premises licences and club premises certificates. Licensees currently pay an annual fee on the anniversary of the date when the licence application was granted.
London Olympics
The Olympic delivery bodies are currently preparing the Olympic Transport Plan, a requirement of the London Olympic Games and Paralympic Games Act 2006. They will be consulting on the draft plan later this year.
Low or zero emission vehicles will be used throughout the fleet of cars, buses and service vehicles for the 2012 Olympic and Paralympic Games.
The delivery bodies are currently in discussion with a number of potential marketing partners within the automotive sector and expect to appoint a single automotive partner in due course. The successful partner will be contractually bound to provide a fleet of some 3,500 low emission cars, MPVs and vans. During initial discussions all the potential partners have shown a clear understanding of and commitment to the bid promise of a low carbon Games. They will also enter into discussions with transport operators to provide a fleet of 1,500 low emission buses and coaches, and will also appoint a partner to provide low carbon fuels for all vehicles.
The promotion of sustainability will be a fundamental strand of the London 2012 Education Programme. LOCOG is in the process of working with partners to develop its plans for this programme with the aim of engaging and enhancing the learning of young people across the UK and internationally.
(2) what plans the Government have to implement delivery of a zero waste games; by what criteria the level of waste will be assessed; and if she will make a statement.
We have committed to zero waste to landfill for the duration of the Olympic and Paralympic games in 2012. The Olympic Board has identified waste as one of five key sustainability themes the Olympic programme will be focusing on. The Government, GLA, ODA and LOCOG are currently developing their delivery plans in this area, and are looking at appropriate targets for waste as part of the overall Olympic programme. As part of this, the ODA is currently investigating the opportunities to divert waste from landfill during the demolition and construction of the Olympic Park as part of its sustainable development strategy.
The construction commitments signed very recently by DCMS, DTI, ODA, the Mayor for London and the Strategic Forum for Construction are a major step forward in enabling us to showcase collaborative behaviours and best practice. The ODA and the Strategic Forum are now developing various measures in each of the areas of the commitments, and these will be made publicly available.
Winning the bid to host the Olympic games in 2012 creates the best possible opportunity to transform sport for young people.
Through our national school sport strategy we are well on the way to ensuring that 75 per cent. of children do two hours of high quality physical education and sport per week by 2006 and 85 per cent. by 2008. In addition, by 2010 all children will be offered a further two to three hours of sport every week. We are also putting in place competition managers so that all pupils can compete individually or in teams. 20 managers have been in post since September 2005 and the next wave will be in place by September 2006. By 2010 all school sport partnerships will be supported by a competition manager.
We have set up the UK school games which will showcase our talented young athletes in an annual inter nation and regions competition to be held from 2006- 2011. We have already appointed 600 young ambassadors across the school sport partnerships and we aim to have 822 in place by September 2006. Their objective is to help to spread the Olympic message and ideals within their school sport partnership, and act as advocates and role models to other young people.
The National Sports Foundation is now in place and is responsible for levering and promoting new and additional money for grass roots sports. One of its schemes 2012 Kids builds on the success of the Olympics to encourage children and young people to take up sport.
The venues for the 2012 road show were selected to ensure that there is a wide and diverse coverage of events and locations from within each region in England and Scotland, Wales and Northern Ireland. As well as all four capital cities and other major towns, the road show is visiting 2012 competition venues, sporting events, venues with special significance for the Olympic or Paralympic movement, cultural venues and tourist attractions. All road show venues and locations were agreed in conjunction with the Nations and Regions Group.
The Olympic stakeholders hope to stage events of this sort in the years from 2007 onwards although plans for future years are yet to be decided.
Museums and Galleries
The Department’s public service agreement target 3 is, by 2008, to increase the number of people from priority groups visiting museums and galleries during the past 12 months by two percentage points on the final baseline estimate, which will be known in late 2006. The provisional baseline estimates published on 24 March 2006 are set out as follows. These data are from the Taking Part survey.
Percentage At least one visit Range1 Black and minority ethnic 36.3 33.4—39.1 Limiting disability 31.8 29.8—33.9 Lower socio-economic 29.3 27.7—30.8 All adults 42.7 41.6—43.8 1 Using 95 per cent. confidence interval. Note: 1. Figures have been rounded to 1 decimal place.
Taking Part is new survey commissioned by the Department and the following NDPBs: Arts Council England; English Heritage; Museums, Libraries and Archives Council and Sport England. The survey was launched in July 2005 and is a continuous national survey of adults and children living in private households in England. The survey asks about engagement and non-engagement in and across activities within the Department’s remit. The survey is the principal measurement tool for reporting performance on the Department’s PSA target 3.
NESTA
The information is as follows.
Total expenditure NESTA (£000) Total number of awards Total number of applicants rejected 1998-99 909 — — 1999-2000 5,914 31 — 2000-01 9,659 64 244 2001-02 13,581 95 973 2002-03 17,823 126 912 2003-04 20,843 206 1,190 2004-05 24,773 255 1,024 2005-06 25,332 273 1,460 Total 118,834 1,050 5,803
NESTA was created by Act of Parliament in 1998, to support UK creativity and innovation. NESTA is working towards transforming the UK’s capacity for innovation. It invests in all stages of the innovation process, backing new ideas and funding ventures that stimulate entrepreneurship. It aims to be the single most important catalyst for innovation in the UK.
Its total expenditure in 1998-99 was £909,000, rising to £25,332,000 in 2005-06. The number of awards made in 1999-2000 totalled 31, rising to 273 in 2005-06. Finally the number of applicants rejected in 2000-01 totalled 244, rising to 1,460 in 2005-06.
School Swimming Pools
I have been asked to reply.
We are not aware of any discussion between the Secretary of State for Culture, Media and Sport and the Amateur Swimming Association regarding the classification of school swimming pools.
Indoor swimming pools are normally classified as ‘supplementary net area’, as set out in DfES Building Bulletin 98: ‘Briefing Framework for Secondary School Projects’. This is because they are usually an enhancement to school facilities, not part of the core provision that we expect all schools to have. Outdoor pools are not included in either the net or gross floor area of school buildings.
Sport England
266,883 interviews have been conducted so far for Sport England's active people survey which is on track to meet the target of at least 1,000 interviews per local authority in England by October 2006.
Stonehenge
The specific impact of each A303 option on commercial performance at Stonehenge has not been modelled. However, should English Heritage's plans for a new visitor centre and access arrangements at Stonehenge go ahead, along with the published scheme for improvements to the A303, it is estimated that visitor numbers are likely to stay the same as at present. Any increase in visitor spending is likely to be balanced by the cost of operating the new facilities.
The net income (not profit) generated from visitors to Stonehenge in each year since 1997 is as follows:
£ 1996-97 3,156,883 1997-98 3,310,350 1998-99 3,755,389 1999-2000 4,036,315 2000-01 13,827,769 2001-02 13,554,282 2002-03 3,854,550 2003-04 4,260,664 2004-05 4,669,575 2005-06 4,794,121 1 Decline in income in years 2000-01 and 2001-02 reflects the decline in visitors during the foot and mouth crisis and the aftermath of 9/11.
The only English Heritage site in the vicinity of Stonehenge is Old Sarum. Other key sites in the area are Salisbury Cathedral and Wilton House. The visitor figures from 1997 for Old Sarum and Salisbury Cathedral are given in the table. Visitor figures for Wilton House will follow shortly:
Old Sarum Salisbury Cathedral1 1996-97 80,390 340,000 1997-98 76,372 338,000 1998-99 80,691 332,000 1999-2000 81,378 331,000 2000-01 75,921 313,000 2001-02 70,868 262,000 2002-03 65,818 263,000 2003-04 58,299 244,000 2004-05 53,977 271,000 2005-06 48,637 268,000 1 Salisbury Cathedral does not charge entry fees, therefore figures are approximate and do not include people attending services, concerts or visiting the Close generally.
Visitor number projections resulting from the construction of any of the shortlisted options for the A303 are not available.
However, South West Tourism has identified Stonehenge and Salisbury as a key destination for regional tourism. Should the published road scheme be approved, it will enable English Heritage to make major improvements to the visitor experience at Stonehenge, encourage a longer stay in the region and potentially benefit attractions such as Salisbury Cathedral and other local heritage sites and museums.
Swimming (Peterborough)
Access to good quality sporting provision, including swimming pools, is essential if we are to encourage people to lead healthier, more active lives. There has been significant public investment in sports facilities in recent years—by 2006 over £1 billion of Exchequer and lottery funding will have been committed to develop over 4,000 new or refurbished facilities. Swimming has been the single greatest beneficiary of sport lottery funding, having received some £249 million since 1997. Peterborough has benefited from 31 awards totalling £699,823.
Provision for sport and leisure is currently a discretionary service for local authorities. Decisions on such provision are therefore a matter for local government. However, Sport England are encouraging and helping local authorities through the development of swimming strategies and toolkits to aid strategic planning. According to the Active Places database (available at www.activeplaces.com) there are 14 swimming pools within a 10 mile radius of Peterborough.
Ticket Touting
DCMS have been working with many of the organisers of summer music festivals including those representing the organisers of T in the Park, the Reading and Leeds festivals and the V festival as well as other representatives covering music, sport and the arts as well as secondary sellers and EBay.
All of these parties were involved in the production of the statement of principles (copies of which I have now placed in the Libraries of both Houses, which was first presented at a meeting) hosted by my right hon. Friend the Secretary of State in April. The statement of principles sets out the broad guidelines which we expected all parties involved in the commercial selling of tickets to follow. Since that meeting DCMS officials have had continued meetings with these representatives to aid their sectors in the production of sector specific codes of practice, which puts the rights of the consumer at the forefront.
Our principle in taking this forward must be to find a solution that protects fans and ensures that our creative, cultural and sporting industries are able to realise legitimate revenue streams.
Wembley Stadium
On 3 July, Multiplex announced publicly that it remained confident that substantial completion of the stadium would be achieved in July 2006 sufficient to enable practical completion of its work at the end of September 2006.
Wembley National Stadium Ltd (WNSL) continues to discuss progress towards practical completion of the project with Multiplex and will announce an opening date in due course.
Public Accounts Commission
National Audit Office
At its meeting in December 2005 the Commission gave outline approval to the NAO's proposed refurbishment of its headquarters building in Buckingham Palace Road, London, subject, however, to three conditions. First, that the NAO should produce a detailed, fully costed business case for the project. Second, that the NAO should carry out a cost-benefit analysis of an alternative approach to its accommodation requirements, namely moving its headquarters to a North of England location. And third, that the NAO should provide a fuller explanation of its decision to rule out the possibility of acquiring alternative accommodation in London as part of the Government estate.
At its meeting on 4 July 2006, the Commission considered the NAO's response under each of those headings.
The Business Case
The business case produced by the NAO gives the total cost of the project as £77.44 million, spread over five years starting in 2006-07. In the longer term, there will be a small increase in annual resource costs to the NAO, resulting from higher business rates, capital charges and depreciation, partially offset by reduced running costs through greater building efficiency. Since submitting its original proposals the NAO has revised its approach to the decanting of staff which will be necessary while the building work is in progress. It is now hoped to carry this out in a single rather than a two or three stage process, depending on the availability of suitable decant accommodation. On the basis of the business case, the NAO made a persuasive argument in support of refurbishment as the most cost-effective way of avoiding what would otherwise be—because of the building's current deficiencies—an unacceptable risk to the Office's continued ability to function efficiently. The Commission was, however, conscious of the sensitivity surrounding the timing of the project, since, under the NAO's plans, the bulk of the expenditure would occur in the years covered by the next, and potentially difficult, comprehensive spending review. We therefore pressed the NAO on the implications of deferring the project (which, because of the need to avoid coinciding with the competing demands on the construction industry from Olympics-related activity, would entail a delay until 2013). The NAO satisfied the Commission that, given the deteriorating condition of the current building, waiting a further seven years before undertaking remedial work would pose an unacceptable risk to the NAO's operations and therefore to the service it provides to Parliament.
The Possibility of Relocating to the North of England
In response to the Commission's request, the NAO examined Manchester as a possible location for a provincial headquarters building. Of a number of cities considered, Manchester was judged to come nearest to meeting the Office's principal requirements: good transport connections; and a sufficiently large local pool of qualified accountants to enable the NAO to recruit and retain key professional staff. On the latter count, the available pool in Manchester, though large in comparison with other provincial cities, is much smaller than London's and is insufficient to support the NAO's requirements. The cost-benefit analysis carried out by the NAO indicated that the basic costs associated with relocating would be broadly similar to those for the option of staying on in a refurbished Buckingham Palace Road. On the other hand, the analysis suggested that the uncertainty over the number of staff who would be willing to relocate posed a risk both of additional, but unquantifiable costs of redundancy and resettlement packages, and of disruption of core business activity. The Commission was satisfied that, for these reasons, relocation was not a realistic option. The NAO is, however, proposing to expand its presence in the North, concentrating on its existing team in Newcastle.
Alternative Accommodation in London
As part of its consideration of alternative sites in London for its headquarters building, the NAO has examined the portfolio of vacant, or about to become vacant, properties maintained by the Office of Government Commerce. The NAO's assessment, which the Commission accepted, is that there is at present no building available of a size and configuration to meet the NAO's requirements on a long term basis, and at a cost competitive with the headquarters refurbishment option, taking account of the resultant loss of the current peppercorn rent. Taking all these factors into account, and having carefully considered the NAO's business case, the Commission gave its formal approval to the proposed refurbishment of the Buckingham Palace Road building. The Commission noted that, depending on how quickly the refurbishment work can begin, it may be necessary for the NAO to submit a supplementary estimate for the financial year 2006-07. The Commission will consider any such request if and when it is received. In the meantime, the Commission looks to the Treasury to make room within the public expenditure envelope for the relevant years for the resources needed for the refurbishment. For its part, the Commission will monitor carefully the progress of the project against both time and budget.
Duchy of Lancaster
Cabinet Office Staff Handbook
A CD Rom containing the terms and conditions of service of Cabinet Office staff set out in the Cabinet Office HR Code, was placed in the Library for the reference of Members on Friday 14 July.
Departmental Staff (Sickness Absence)
The Cabinet Office had 365 staff with two or more periods of sick absence of less than five days in two or more of the years between 2003 and 2005. “Analysis of sickness absence in the Civil Service”, copies of which are available in the Library for the reference of Members, publishes sickness absence lost per employee for Government Departments.
FIFA World Cup
Cabinet Office Ministers have not attended any World Cup 2006 matches.
Official Residence
I have been asked to reply.
On 1 July 2006, 1,093 Foreign and Commonwealth Office staff were employed in the Old Admiralty Building.
Parliamentary Questions
At the end of business on Monday 10 July 2005, there were 17 parliamentary questions tabled to the Department awaiting a response, of which one was two weeks overdue. The question was responded to on Tuesday 11 July.
Statutory Instruments
The number of statutory instruments made in each year from 1989 to 2005 is shown in the table.
Number made by Government Departments Authorities and UK Total 1989 — 2,503 1990 — 2,664 1991 — 2,951 1992 — 3,359 1993 — 3,279 1994 — 3,334 1995 — 3,345 1996 — 3,291 1997 — 3,114 1998 — 3,319 1999 — 3,488 2000 — 3,424 2001 — 14,147 2002 — 3,271 2003 of which 2,999 Government departments and 355 other UK authorities 3,354 2004 of which 3,103 Government departments and 349 other UK authorities 3,452 2005 of which 3,297 Government departments and 302 other UK authorities 3,599 1 The number of SIs/SSIs registered during 2001 included 597 UK Government Sis, 36 National Assembly for Wales Sis and 65 Scottish Sis which related directly to the outbreak of foot and mouth disease.
It is not possible to provide information split between Government Departments and other UK authorities prior to 2003. The information could be obtained only at disproportionate cost.
Detailed statutory instrument statistics are also available on the website of the Office of Public Sector Information (OPSI), at: http://www.opsi.gov.uk/si-statistics.htm
The Cabinet Office has had one statutory instrument reported as defective since October 2005—The Civil Contingencies Act 2004 (Contingency Planning) Regulations 2005 (S.I. 2005/2042). A correction slip was issued in February 2006 to correct the error.
Communities and Local Government
Brownfield Sites
[holding answer 13 July 2006]: The information shown as follows is the total of sites reported by local authorities for the 2004 National Land Use Database of Previously-Developed Land. Local authorities do not claim to cover all sites in their returns, particularly small sites, so the totals understate the full amounts.
West Sussex Mid Sussex Vacant and derelict land and buildings 153 19 Currently in use with potential for redevelopment 344 42 Total 497 61
Community Infrastructure Scheme
Two London Gateway transit schemes were allocated £34 million of Community Infrastructure Fund (CIF) funding in November 2004 to provide support to the 2012 Olympics bid. In addition, the Government received 104 expressions of interest in January 2005 for the remaining £166 million of CIF funding. These were reviewed and in March 2005 the Government announced that 48 schemes would be invited to prepare full bids. Following detailed assessment of the bids received, 25 schemes have been allocated CIF funding, with a further six schemes receiving Department for Communities and Local Government funding. The Government are working with local partners to look into other funding options for a small number of the remaining schemes.
In total £193 million of the £200 million Community Infrastructure Fund (CIF) has been allocated following a series of announcements—the final of which took place on 11 April 2006. The remaining £7 million is to be used as a contingency reserve to address any emerging issues that may arise over this two-year programme.
Following is a list of the approved CIF schemes:
Scheme name Growth area Total CIF £ million (to 2dp) A602 Improvements South of Stevenage LSCP 3.12 Bishops Stortford Green Corridors LSCP 1.98 Cambridge Station Area Access LSCP 0.60 Dalston Slab LSCP 10.00 Great Notley Garden Village Access LSCP 4.80 Haringey Heartlands Spine Road LSCP 5.00 Peterborough Fletton Parkway LSCP 7.01 Aylesbury Vale Parkway MKSM 8.17 Aylesbury PT Hub MKSM 11.42 Aylesbury Southcourt Bridge MKSM 2.96 Corby Northern Orbital Road MKSM 6.10 Cross Valley Link Northampton MKSM 9.69 East Luton Corridor Improvements MKSM 14.50 Ml Junction 14 MKSM 8.42 Milton Keynes Station MKSM 24.00 Sandy Lane Improvements MKSM 5.72 Sandy Lane Relief Road MKSM 4.51 Wilby Way Roundabout MKSM 1.30 Fastrack—Greenhithe Stn/Ingress TG 5.24 Fastrack Thames Way TG 8.12 Fryerns/Craylands, Basildon TG 5.90 Langdon Park DLR TG 5.70 London Gateway Transits—two schemes TG 34.00 Pontoon Dock Station Bridge TG 1.34 Tidal Basin Roundabout TG 0.96 Woolwich New Road TG 2.62
The announcement of the final tranche of schemes to be funded under the Community Infrastructure Fund (CIF) was made in April 2006 and was placed on both the Department for Transport (DfT) and Department for Communities and Local Government (DCLG) websites.
The Barking-Dagenham-Rainham-Grays-Pitsea 12 car platform lengthening project bid was not successful. There were numerous bids for GIF funding and DfT and DCLG ministers had to prioritise schemes against a cash limited fund.
There were many bids for Community Infrastructure Funding. We, with colleagues in the Department for Transport, had to prioritise schemes against a cash limited fund. The bid for the Rainham scheme was to fund enabling works and so would not, in itself, have delivered a capital infrastructure project to support housing growth.
Council Tax
The Expenditure Control Division of the Department deals with council tax capping among other issues. At present the division has 8.6 full-time equivalent members of staff, including temporary staff.
It is not possible to set out the split of staff input between capping and other work.
The total expenditure incurred by the Division dealing with council tax capping, including work on issues other than capping, was:
(£) 2004-05 503,610.22 2005-06 414,949.95
It is not possible to set out the split of resources between capping and other work.
The number of chargeable dwellings liable for council tax in England as at November 2005 was 21,267,000 of which 8,018,000 dwellings (37.7 per cent.) were entitled to a discount.
The number of chargeable dwellings and those entitled to a discount are taken from the CTB1 forms submitted to this Department by all 354 billing authorities in England. The number of individuals liable for council tax cannot be accurately determined from these or other sources.
A total of £18.4 billion council tax was collected by local authorities in England in 2005-06, irrespective of the financial year to which the liabilities relate.
Councillors (Parental Rights)
Legislation does not provide maternity or paternity rights for local authority councillors.
Crasher Green (Stroud)
English Partnerships is currently conducting a feasibility study into the development of the Crasher Green site in Stroud which is due to be completed in July. A decision about the future development of the site will follow in the autumn.
Discharged Psychiatric Patients
Although psychiatric patients should not be discharged as homeless, some may nevertheless self-discharge and not have accommodation available to them. People may be discharged to temporary accommodation as part of a plan agreed between mental health services and housing departments, but this is not recorded as part of routine monitoring.
Information collected by my Department about households accepted by local authorities as unintentionally homeless and in a priority need group identifies those where the applicant or a household member was vulnerable as a result of mental illness or disability. Results for years since 1997 are presented in Table 4 of the quarterly Statistical Release on homelessness, first quarter of 2006, published on 12 June. A summary of information back to 1990 is presented in the table. However, information on the number of these who had been former psychiatric patients, and whether they were subsequently allocated temporary accommodation or a settled tenancy, is not available centrally.
Total Of which, vulnerable due to mental illness or disability: 1990-91 132,280 4,300 1991-92 139,630 5,200 1992-93 136,230 5,950 1993-94 125,360 6,740 1994-95 116,850 7,200 1995-96 116,550 7,570 1996-97 110,600 8,010 1997-98 102,430 6,930 1998-99 104,260 7,260 1999-2000 105,580 7,580 2000-01 114,670 9,110 2001-02 116,660 9,970 2002-03 128,540 10,980 2003-04 135,430 12,070 2004-05 120,860 10,650 2005-06 93,980 7,340 1 All households eligible under homelessness legislation, found to be unintentionally homeless and in a priority need category, and consequently owed a main homelessness duty. Source: DCLG P1E homelessness returns (quarterly).
Green and White Papers
No Green or White Papers have been published by this Department for the period in question.
Homelessness
[holding answer 13 July 2006]: Information about local authorities' actions under homelessness legislation is collected quarterly, at local authority level. The parliamentary constituency of the Ribble Valley shares its boundaries with those of Ribble Valley district council.
Statistical returns distinguish the number of households accepted as eligible for assistance, and unintentionally homeless according to the main category of priority need the applicant falls within. The returns do not identify the number of people in the household. Information reported by Ribble Valley in each year since 2001-02 is summarised in the following table:
Total households Of which: containing dependent children Of which: containing an expectant mother Applicant of family member vulnerable1 2001-02 31 14 2 15 2002-03 51 17 0 34 2003-04 78 31 5 42 2004-05 45 20 4 21 2005-06 38 25 2 11 1 As well as applicants, or members of their household, considered vulnerable, figures also include households homeless in an emergency, applicants aged 16 or 17 years old, and applicants formerly in care and aged 18 to 20 years old. Source DCLG P1E Homelessness returns (quarterly)
Information about local authorities’ actions under homelessness legislation, which is collected in respect of households rather than persons, is summarised in a quarterly Statistical Release, the latest of which was published by the Department for Communities and Local Government on 12 June.
Copies of the Statistical Release and tables are available in the Library, and from the DCLG website at:
http://www.communities.gov.uk/index.asp?id=l002882& PressNoticeID=2169
(a) Table 1 of the Statistical Release provides the number of decisions on homelessness applications from eligible households in each year since 1997, distinguishing those found to be homeless. This includes those accepted by local authorities as unintentionally homeless and in a priority need category, and consequently owed a main homelessness duty.
Information is also collected by the Department on the number of people who sleep rough—that is, those who are literally roofless on a single night. These are recorded on a calendar year basis, and figures for 1998 up to the latest available figures, for 2005, are also presented on DCLG’s website, at:
http://www.communities.gov.uk/pub/132/National RoughSleepingEstimate2005Excel116Kb_idll50132.xls
(b) The duty owed to a person accepted as eligible for assistance, unintentionally homeless and in priority need is to secure suitable accommodation. If a settled home is not immediately available, the authority may secure temporary accommodation until a settled home becomes available. Table 6 of the Statistical Release presents those in various forms of temporary accommodation arranged by local authorities at the end of each quarter since March 1997.
The supplementary tables of the release show the results at local authority level.
No data are yet available for 2006-07. Figures for the first quarter of 2006-07 will be published in September.
(A) The number of new local authority lettings in each local authority for the years 2000-01 to 2004-05 has been placed in the Library of the House. No data are available for 2005-06 or 2006-07.
(B) The number of new Housing Association lettings in each local authority for the years 2001/02 to 2005-06 has been placed in the Library of the House. No data are available for 2006-07.
(C) Data on the number of sales under right-to-buy are available from the DCLG website at:
http://www.communities.gov.uk/pub/383/Table648Excel 545Kb_idl156383.xls
Local authorities report their activities under homelessness legislation quarterly, and this includes the number of homeless households in various forms of temporary accommodation as on the last day of the quarter.
The duty owed to a person accepted as eligible for assistance, unintentionally homeless and in priority need is to secure suitable accommodation. If a settled home is not immediately available, the authority may secure temporary accommodation until a settled home becomes available. As an alternative to the provision of temporary accommodation some authorities arrange for households to remain in their current accommodation until a settled solution becomes available.
Information is also collected on the number of people who sleep rough - that is, those who are literally roofless on a single night. These are recorded on a calendar year basis, and figures for mid-year 2001 up to the latest available figures, for 2005, are also presented in the following tables.
(a) The West Lancashire constituency is wholly contained in the West Lancashire local authority, although the authority also contains part of the South Ribble constituency. Temporary accommodation and rough sleeping figures for the entire West Lancashire authority for the last 5 years are in the following table:
(i) Homeless households in temporary accommodation arranged by West Lancashire district council, and (ii) the number of rough sleepers in West LancashireNumber of households in temporary accommodation1 (31 March snapshot)Number of rough sleepers, people, mid-year (June) estimate22001-026—2002-03——2003-045—2004-052—2005-061— 1 Households in accommodation at the end of the year (March) either pending a decision on their homelessness application or awaiting allocation of a settled home following acceptance. Excludes those households designated as “homeless at home” that have remained in their existing accommodation and have the same rights to suitable alternative accommodation as those in accommodation arranged by the authority. 2 Number of persons sleeping rough are based on local authority counts during the year and presented as a mid-year estimate. If no count takes place during the year an estimate is given by the local authority. Source: DCLG P1E Homelessness (quarterly) and HSSA (annual) returns.
(b) The geographical county of Lancashire is made up of 12 district authorities and 2 unitary authorities, Blackburn and Darwen and Blackpool. The totals are in the following table:
Number of households in temporary accommodation1 (31 March snapshot) o.w. Unitary authority o.w. LA districts Number of rough sleepers, people, mid-year (June) estimate2 o.w. Unitary authority o.w. LA districts 2001-02 270 52 218 4 4 — 2002-03 343 76 267 7 4 3 2003-04 360 102 258 3 — 3 2004-05 444 132 312 21 4 17 2005-06 348 76 272 7 4 3 1 Households in accommodation at the end of the year (March) either pending a decision on their homelessness application or awaiting allocation of a settled home following acceptance. Excludes those households designated as “homeless at home” that have remained in their existing accommodation and have the same rights to suitable alternative accommodation as those in accommodation arranged by the authority. 2 Number of persons sleeping rough are based on local authority counts during the year and presented as a mid-year estimate. If no count takes place during the year an estimate is given by the local authority. Source: DCLG P1E Homelessness (quarterly) and HSSA (annual) returns.
Information on the number of beds available for homeless households is not held centrally.
Local authorities report their activities under homelessness legislation quarterly, and this includes the number of homeless households in various forms of temporary accommodation as on the last day of the quarter.
The duty owed to a person accepted as eligible for assistance, unintentionally homeless and in priority need is to secure suitable accommodation. If a settled home is not immediately available, the authority may secure temporary accommodation until a settled home becomes available. As an alternative to the provision of temporary accommodation some authorities arrange for households to remain in their current accommodation (homeless at home), until a settled solution becomes available.
The West Lancashire constituency is wholly contained in the West Lancashire local authority, although the authority also contains part of the South Ribble constituency. Figures for the entire West Lancashire authority for the last 10 years are tabled as follows:
31 March Number1 1996-97 6 1997-98 6 1998-99 3 1999-2000 1 2000-01 4 2001-02 6 2002-03 0 2003-04 5 2004-05 2 2005-06 1 1 Households in accommodation at the end of the year (March) either pending a decision on their homelessness application or awaiting allocation of a settled home following acceptance. Excludes those households designated as “homeless at home” that have remained in their existing accommodation and have the same rights to suitable alternative accommodation as those in accommodation arranged by the authority. Source: DCLG P1E Homelessness (quarterly) returns.
Information about local authorities' actions under homelessness legislation is collected quarterly, at local authority level. The parliamentary constituency of West Suffolk consists of Forest Heath DC and part of St Edmundsbury DC.
Statistical returns distinguish the number of households accepted as eligible for assistance, and unintentionally homeless according to the main category of priority need the applicant falls within. The returns do not identify the number of people in the household. Information reported by Forest Heath and St Edmundsbury district councils, which covers the whole of their districts, in each year since 2001-02 is summarised in the following table:
Total households Of which Containing dependent children Containing an expectant mother Applicant or family member vulnerable1 Forest Heath district council 2001-02 43 31 5 7 2002-03 45 31 8 6 2003-04 57 37 9 11 2004-05 55 44 11 — 2005-06 55 31 13 11 St Edmundsbury district council 2001-02 120 93 6 21 2002-03 146 96 17 33 2003-04 141 87 20 34 2004-05 188 119 20 49 2005-06 139 89 21 29 1 As well as applicants, or members of their household, considered vulnerable, figures also include households homeless in an emergency, applicants aged 16 or 17 years old, and applicants formerly in care and aged 18 to 20 years old. Source: DCLG P1E Homelessness returns (quarterly).
Housing
[holding answer 13 July 2006]: A table showing the number of dwellings built for (a) sale, (b) rent and (c) shared ownership as well as planning permissions given as a result of section 106 agreements in each local authority in England, in each year from 2000-01 to 2004-05, has been placed in the Library of the House. Information on the number of building starts is not held centrally.
[holding answer 13 July 2006]: As at 10 October 2005 there were 9,000 vacant dwellings in West Sussex and 100,400 in the South East. The area covered by the South East plan is the same as that covered by the South East region.
These figures are for all vacant dwellings, including dwellings that have been empty for less than six months, some for less than one month.
Figures for the number of residential housing transactions by local authority areas based on data from the Land Registry are published on the DCLG website at: http://www.communities.gov.uk/pub/162/Table588_id1156162.xls.
There were 1.02 million residential housing transactions in 2005 in England and Wales. In 2004 there were 1.23 million transactions. The number of transactions varies significantly from year to year due to a range of factors in the housing market.
New build completions data are only available at local authority level therefore it is only possible to measure how many dwellings have been built in local authorities classified as rural by the Department for Environment, Food and Rural Affairs (DEFRA) rural definition and local authority classification. This will include dwellings built in towns that are within a local authority classified as rural.
The following number of dwellings were reported to have been built in local authorities classified as rural in England since 2000:
Rural classification 2000 2001 2002 2003 2004 2005 Significant Rural 20,428 20,109 20,882 21,559 21,974 21,807 Rural-50 19,996 18,651 18,482 18,898 18,407 20,692 Rural-80 21,306 21,098 22,271 21,419 21,709 22,626 Total 61,730 59,858 61,635 61,876 62,090 65,125
For further information on the DEFRA classification please see: http://statistics.defra.gov.uk/esg/rural_resd/rural_definition.asp
The information requested is in the following table.
Provision/Part Proposed/Actual publication date of regulations and guidance Part 1 - Housing Conditions The HHSRS (England) Regulations 2005 (3208) were laid on 28 November and came into force on 6 April 2006. The HHSRS Operating Guidance and HHSRS Enforcement Guidance were published in February 2006. Parts 2, 3, 4 and 7- HMO and Selective Licensing The Management of Houses in Multiple Occupation (England) Regulations, the Licensing of Houses in Multiple Occupation (Prescribed Descriptions (England) Order, the Licensing and Management of Houses in Multiple Occupation and Other Houses (Miscellaneous Provisions) (England) Regulations, the Selective Licensing of Houses (Specified Exemptions) (England) Order and the Housing (Interim Management Orders) (Prescribed Circumstances) (England) Order were laid on 22 February and came into force on 6 April. The Houses in Multiple Occupation (Specified Educational Establishments) (England) Regulations and the Housing (Approval of Codes of Management Practice) (Student Accommodation) (England) Order were laid on 16 March and came into force on 6 April 2006. The Residential Property Tribunal Procedures (England) Regulations and the Residential Property Tribunal (Fees) (England) Regulations were laid on 23 March and came into force on 13 April. Draft regulations relating to section 257 HMOs will be published for limited consultation soon. Explanatory information including leaflets and a dedicated website has been available since March. Part 4 - Empty Dwelling Management Orders The Housing (Empty Dwelling Management Orders) (Prescribed Exceptions and Requirements) (England) Order and The Housing (Management Orders and Empty Dwelling Management Orders) (Supplemental Provisions) (England) Regulations were laid on 22 February and came into force on 6 April 2006. Non-statutory guidance for local authorities on Empty Dwelling Management Orders will be published in July 2006. Part 5 - Home Information Packs The Home Information Pack Regulations, Procedural Guidance and Certification Scheme Business and Technical Standards documents were published on 14 June 2006. Part 6 - Right to Buy modifications The Residential Property Tribunal (Right to Buy Determinations) Procedure (England) Regulations were laid on 13 June 2005 and came into force on 4 July 2005. The Housing (Right to Buy)(Information to Secure Tenants) (England) Order was laid on 5 July 2005 and came into force on 26 July 2005. This Order provides guidance on the provision of information to secure tenants. The Housing (Right of First Refusal) (England) Regulations were laid on 20 July 2005 and came into force on 10 August 2005. The guidance booklet 'Your Right to Buy your Home' was revised together with the relevant Right to Buy forms. Guidance on landlords' discretion not to require repayment of discount, which was clarified by section 185 of the Act, was also issued in January 2005. Part 6 - Suspension of certain rights in connection with anti-social behaviour ASB measures in Part 6 of the Act commenced in June 2005. They include enabling local authorities to extend the period of introductory tenancies and withhold consent to mutual exchange on ASB grounds as well as measures to prevent tenants exercising the right to buy. Regulations regarding the form a review should take where a landlord decides to extend the period of an introductory tenancy came into force on 3 May 2006 Part 6 - Gypsy and Traveller accommodation needs assessments Draft guidance was produced in February 2006 under Section 226 of the Housing Act, in respect of Section 225, relating to the assessment of the accommodation needs of Gypsies and Travellers. This document is subject to further consultation. Definitive guidance will be published in the autumn of 2006. Part 6 - Tenant Deposit Protection In order to consider stakeholder concerns raised by that consultation, we are reviewing the commencement date and will confirm a date before Parliament rises
There are no specific funding allocation data available for Morecambe.
Allocations to Lancaster city council of capital funding for housing purposes over the period 1997-98 to 2005-06 exceeds £30 million. This includes the major repairs allowance first introduced in 2001-02 specifically for the improvement of local authority stock alongside the Decent Homes standard which sets out minimum standards to be met by 2010.
A further £1.9 million was allocated to Lancaster city council by the Regional Housing Board in 2006-07 under priority 1.3 of the Regional Housing Strategy, which seeks to provide a better housing mix in the region’s costal towns i.e. Blackpool, Morecambe and Fleetwood. This amounted to an 11 per cent. on year increase in funding.
In addition the North West Development Agency would have contributed towards housing renewal in Morecambe via the Single Regeneration Budget Programme.
No such studies have been undertaken.
The Government are currently considering responses to their consultation on the Planning-Gain Supplement (PGS), including on the issues of the PGS's impact on rural exception sites and the proposal to retain affordable housing delivery within the scope of planning obligations. Further announcements will be made towards the end of 2006.
No data are collected centrally on the number of homes that have been purchased outright, having been originally acquired through shared ownership, or homebuy.
The Government are keen to expand home ownership through the new homebuy scheme. However, we recognise the need to ensure the longer term supply of affordable housing in rural areas which are subject to particular housing pressures.
Therefore we will continue to allow housing associations to restrict the outright purchase (“staircasing out”) of shared ownership or homebuy properties on rural exception sites, where possible and appropriate under leasehold legislation. This flexibility, coupled with the additional safeguards within the homebuy scheme which allow providers to buy back properties when a purchaser who has staircased to full ownership wishes to move, should enable affordable housing to be retained where it is essential to do so and ensure delivery of the rural programme.
I have been asked to reply.
All local authorities currently on the ALMO and transfer programmes have undertaken to meet the Decent Homes target by 2010. However, the Secretary of State for Communities and Local Government announced on 7 June that where greater flexibility and allowing a little longer will allow a better result for the community—or where spreading the work out would deliver better value for money, we will negotiate later dates on a case-by-case basis. That said, we still expect 95 per cent. of social housing to be decent by 2010.
I have been asked to reply.
Over the last five years 2000-01 to 2004-05, West Lancashire have reported that no new dwellings were built in their area in accordance with the rural exceptions policy.
The money that an Arm’s Length Management Organisation (ALMO) receives is determined by the scope of its management agreement with the local authority and the agreed level of extra funding paid to the local authority for its ALMO to deliver decent homes. The money for the ALMO will come from the local authorities Housing Revenue Account (HRA).
Those local authorities that operate Arm's Length Management Organisations receive specific ALMO allowances as part of their HRA annual subsidy determination. Assumed surpluses (and deficits) are calculated after all assumed income (including rent) and allowances have been taken into account.
Surpluses are collected by the Department and together with a net contribution from the Exchequer of around £200 million a year, are paid to authorities with assumed deficits.
Infrastructure Funding
The Secretary of State for Communities and Local Government has not received any specific representations from SEEDA with respect to infrastructure funding in (a) the South East or (b) Mid Sussex. However, SEEDA, the South East regional assembly and Government office for the south east recently submitted advice to Government, as requested in July 2005, on
“the proposed expenditure of regional transport funding allocations for the three years up to and including 2007-08, in line with the regional housing and economic development allocations already published, and indicative longer term planning assumptions up to 2015-16, across the three funding streams”.
The South East advice on this ‘Regional Funding Allocation’ included reference to a scheme in mid-Sussex and a proposal for a Regional Infrastructure Fund covering the whole of the South East; the document can be found on the SEEDA website at: http://www.seeda.co.uk/About_SEEDA/Board_Members/Board_Meetings/papers/Jan2006/Item7AnnexRFAJan06.doc.
The recommended regional programme for transport schemes was accepted, including the A23 Hancross to Warninglid widening in Mid Sussex as an approved scheme in the indicative 2009-10 to 2015-16 list.
It is for local planning authorities to determine what their specific infrastructure requirements are, and they should try to ensure that as far as possible these needs are met through the appropriate use of planning conditions and section 106 Agreements. We have provided advice on the use of these mechanisms in “The Planning System: General Principles” (Planning Policy Statement 1: Sustainable Development), in Circular 11/95 “Use of conditions in Planning Permissions” and Circular 05/05 “Planning Obligations”.
An opportunity for local authorities to promote green infrastructure has been available through the implementation plan submitted with the draft Regional Spatial Strategy, the South East Plan. This was prepared by the South East Regional Assembly in conjunction with sub-regional partners and stakeholders and includes schedules of a wide range of infrastructure requirements with an indication of funding sources and reference to lead agencies. We understand that a revised implementation plan is being prepared by the Assembly for the Examination in Public later this year, where it will be discussed through the independent panel.
My Department has made special arrangements to support ‘green infrastructure’ projects in the growth areas of Ashford, Aylesbury and Milton Keynes, through the growth area funds. The Government response to the Barker report outlined that 10 per cent. of growth area funds are to be used for green spaces. However, given that Mid Sussex is not designated as a growth area and no current new growth point proposals include the hon. Member’s constituency, this specific funding is not available in Mid Sussex.
Listed Buildings
The Planning (Listed Buildings and Conservation Areas) Act 1990 contains provision enabling allowing for fines for unauthorised works to a listed building. The maximum fine that can be imposed in the magistrates court is £20,000, whereas in the Crown court the fines are unlimited. It is open to the magistrates court to refer a case to the Crown court where it feels its sentencing powers are insufficient in relation to the seriousness of the offence committed.
Local Government Pension Scheme
Based on the findings of the 2004 actuarial valuation exercise it is estimated that the average cost to local authority employers will be (i) 12.5-13.5 per cent. of pensionable pay in 2005-06; (ii) 14-15 per cent. in 2006-07; (iii) 16-17 per cent. in 2007-08. On average employees will contribute 5.8 per cent. of pensionable payroll as well in each of these years.
M6 Link Road (Heysham)
The planning application for the proposed Heysham M6 Link road is currently being considered by Lancashire county council.
Should the council be minded to approve the application it will be referred to the Secretary of State for Communities and Local Government under the terms of a Direction (article 14 of the Town and Country Planning Act (General Development Procedure Order 1995)) issued on 8 March 2006.
On receipt of the application from the council, consideration will be given to the possibility of calling it in for determination by the Secretary of State.
Midland Hotel Regeneration
The total project cost was appraised at £7,310,089 of which NWDA is providing a grant of £4,052,850.
English Heritage via Townscape Heritage Initiative (THI) is providing £600,000. The remaining balance is being met by the private sector.
Planning
[holding answer 13 July 2006]: Data on section 106 agreements entered into by individual local authorities are not collected centrally.
A recent study “Valuing Planning Obligations in England” conducted by Sheffield University and Halcrow Group consultants for the Department for Communities and Local Government estimated that the value of planning obligations agreed in England as a whole in 2003-4 was £1.9 billion. This can be broken down as follows:
£ million Open space 116 Transport and travel 280 Community and leisure 111 Education 118 Other 65 Agreements made directly with county councils (e.g. minerals and waste applications) 7 Affordable housing 1,200
Government’s policy guidance on the use of planning obligations is contained in Circular 5/05 Planning Obligations. This does not refer to the use of planning obligations in Special Protection Areas.
Government office for the south east in conjunction with English Nature are encouraging local planning authorities to develop ‘mini-plans’ of programmes of land or enhancement of existing land which could be used as mitigation against development around the Thames Basin Heaths Special Protection Area in the short to medium term. Developers could contribute towards mitigation of their development by agreeing provision as set out in the local authority’s mini-plan by way of a s106 legal agreement.
Government Office for the South East in conjunction with English Nature have advised councils in the vicinity of the Thames Basin Heaths Special Protection Area that there is no moratorium on housing development in their areas and are encouraging local planning authorities to develop ‘mini-plans’ of programmes of land or enhancement of existing land which could be used as mitigation against development in the short to medium term.
English Nature’s Thames Basin Heaths SPA Project Delivery Plan, along with other research evidence, will be considered at the Examination in Public of the South East Plan in November. The plan is due to be adopted in 2008 and will set a regional spatial strategy for the South East region with strategic policies on the SPA which will inform local councils’ local development frameworks.
In addition the Government have commissioned further research to inform English Nature’s considerations as well as planning considerations which will be concluded later this year.
Post Office Network Services
The information requested is not held centrally and cannot be supplied without incurring disproportionate cost.
Second Homes
[holding answer 10 July 2006]: The Affordable Rural Housing Commission, which was set up by my Department and the Department for Environment, Food and Rural Affairs, considered the impact of second homes on housing in rural areas. The Government are currently considering their response to the Commission's recommendations in this area.
In 2005-06 local authorities raised an additional £92 million (and £84 million in 2004-05) from the reduced council tax second homes' discount to spend on local priorities. The Department has made no estimate of the proportion of this additional revenue allocated by authorities to affordable and social housing.
Telecommunications
The Department has not re-issued the consultation paper on local loop unbundling. During a re-organisation and re-branding of the Department's website, information suggesting the consultation had been extended was inserted in error on the website.
The error has now been corrected.
Thames Gateway
[holding answer 14 July 2006]: I chaired the fourth meeting of the Thames Gateway Strategic partnership on 9 February 2006.
The minutes of that meeting, showing the officials in attendance and other organisations represented, have been placed in the Library of the House.
Trade and Industry
Advanced Gas-cooled Reactors
Graphite brick cracking is a well known life-limiting feature of British Energy's advanced gas-cooled reactors, and all of these reactors are undergoing the same degradation process at varying rates. All of the UK's nuclear power stations are subject to robust regulation by the independent regulator, HSE's Nuclear Installations Inspectorate (NII), and I am advised on nuclear safety matters by the NII's Chief Inspector.
I am satisfied that the NII would not allow any nuclear power station to continue to operate if there was an unacceptable risk to the general public.
Arms Trade
The Government’s Annual and Quarterly Reports detail licences issued and refused for the brokering of controlled goods between third countries. While I have no plans to review the format, I always give careful consideration to any recommendation made by the Quadripartite Committee on Strategic Export Controls, concerning the Annual Report.
I have no plans to review the Department’s policy on end-use monitoring. I refer the hon. Member to my response to the hon. Member for North Devon (Nick Harvey) on 8 June 2006, Official Report, column 778W.
[holding answer 13 July 2006]: No standard individual transhipment licences have been issued to UK companies wishing to transfer small arms and light weapons from Bosnia via the UK to other destinations since 2003. The Government publishes details of standard individual transhipment licences issued in its Annual and Quarterly Reports on Strategic Export Controls. The Government's annual reports are available from the Libraries of the House, and the quarterly reports from the DTI Export Control Organisation website at http://www.dti.gov.uk/europeantrade/strategic-export-control/index.html. We expect to publish the 2005 annual report in July 2006.
(2) what import licences have been issued since 2003 for military goods from Bosnia to the UK; and what type of goods were imported under each licence.
[holding answers 13 July 2006]: Details of import licences issued from 1 January 2005 that would allow the import from Bosnia of small arms and light weapons (as defined by the Organisation for Security and Cooperation in Europe) are listed. Similar lists for 2003 and 2004 could only be drawn up in the time available at disproportionate cost.
The list is divided into those licences that specify Bosnia as a country of consignment (BA) and those that could be used for importing weapons from any country including Bosnia (AY).
The Department does not issue import licences for military equipment other than firearms and ammunition falling to Chapter 93 of H M Revenue and Customs' Integrated Tariff of the United Kingdom and not imported by the Ministry of Defence. No such licences in respect of Bosnia other than those listed have been issued since 1 January 2005.
Import Licences Issued from 1 January 2005 to date: AY 4 x DLASK Arms M4 5.56 calibre AY 60 x pistols AY 50 x handguns/machine pistols/silencers AY 45 x shotguns/5 x silencers AY 45 x assorted prohibited weapons AY 500 x assorted prohibited firearms and component parts AY 6,380 x assorted prohibited firearms AY 358,725 x assorted prohibited weapons AY 500 x weapons and ammunition -under Sections 5(l)(c) and 5(1 A)(b) of the Firearms Act 1968, as amended AY 5,000 x automatic weapons of all types AY 1,000 x semi-automatic rifles and carbines AY 200 x short barrelled shotguns AY 50 x rocket launchers, grenade launchers or mortars AY 2,000 x handguns AY 12 x weapons under Section 5(l)(a)/12 x weapons under Section 5(l)(ab)/12 x weapons under Section 5(l)(aba) AY 100,000 x weapons under Section 5(l)(a)/50,000 x weapons under Section 5(l)(ab) AY 500 x assorted prohibited firearms and component parts AY 47,800 x assorted prohibited firearms and component parts AY 40 x handguns/5 x machine pistols/5 x silencers AY 45 x shotguns/5 x silencers AY No more than 45 in total x sub machine guns, light machine guns, medium machine guns, heavy machine guns, automatic cannons, assault rifles/carbines, self-loading rifles, self-loading rifles/carbines, automatic rifles/carbines, pump action rifles/carbines AY Unlimited assorted prohibited firearms AY 6,470 x assorted prohibited firearms AY 100 x handguns AY 358,725 x assorted prohibited weapons AY 500 x automatic weapons of all types AY 1,000 x semi-automatic rifles and carbines AY 200 x short barrelled shotguns AY 50 x rocket launchers, grenade launchers or mortars AY 2,000 x handguns AY 36 x assorted prohibited weapons AY 20,450 x assorted prohibited weapons AY 47,800 x assorted prohibited firearms and component parts AY 1,000 x assorted prohibited firearms and component parts AY No more than 13,000 in total x weapons under Sections 5(l)(a) and 5(l)(ab), (ac) & (ae)/l,300 x weapons under Section 5(l)(b)/500 x weapons under Section 5(l)(aba)/25,000 x weapons under Sections 5(l)(c), 5(1 A)(d) and 5(lA)(e) AY 10 x .223 semi-automatic rifles/carbines AY 110 x lightweight multiple launchers/10 x vehicle missile launchers/75 x automatic, semi-automatic rifles, carbines/25 machine guns/15 grenade launchers/2 x drill anti-tank weapons/500 x shoulder launch aiming units AY No more than 500 in total x prohibited weapons and prohibited ammunition AY 5,000 x automatic weapons of all types AY 1,000 x semi-automatic (self-loading) rifles and carbines of all types AY 200 x short barrelled shotguns fed by slide, pump or lever action or by self loading mechanism AY 50 x rocket launchers, grenade launchers or mortars of all types. AY 2,000 x large and small calibre pistols and revolvers (handguns) of all types AY 100 x pistols under Section 5(l)(aba) AY No more than 10,000 x weapons under Section 5(l)(a)/600 x weapons under Section 5(l)(ab)/6,000 x weapons under Section 5(l)(aba)/100 x weapons under Section 5(l)(ac)/3,000 x weapons under Section 5(l)(ae) AY No more than 10,000 x weapons under Section 5(l)(a)/600 x weapons under Section 5(l)(ab)/6,000 x weapons under Section 5(l)(aba)/100 x weapons under Section 5(l)(ac)/3,000 x weapons under Section 5(l)(ae) AY No more than 75 x medium machine guns, sub machine guns, light machine guns, heavy machine guns, automatic cannon, cannon, assault rifles/carbines, self-loading rifles/carbines, automatic rifles/carbines, pump action rifles/carbines AY 60 x handguns (calibre. 2mm-27mm/. 172-1") AY 45 x shotguns (pump, revolver, semi-automatic, automatic) AY No more than 45 in total x shotguns of the following types: pump, revolver, semi-automatic, automatic AY No more than 75 in total x medium machine guns, sub machine guns, light machine guns, heavy machine guns, automatic cannon, cannon, assault rifles/carbines, self-loading rifles/carbines, automatic rifles/carbines, pump action rifles/carbines AY 10 x Derringer, 30 x handgun, 5 x machine pistol AY 12 x weapons under Section 5(l)(a)/12 x weapons under Section 5(l)(ab)/12 x weapons under Section 5(l)(aba) BA 9,480 x assorted automatic rifles and machine guns BA 2,000 x machine guns, assault rifles and sub machine guns BA 1,500 x machine guns, assault rifles and sub machine guns BA 2,000 x machine guns, assault rifles and sub machine guns BA 500 x rocket launchers/3000 mortars BA 40,000 x various assault rifles BA 10,000 x various machine guns/2,500 various sub machine guns BA 100 x anti aircraft systems BA 100 x rocket launchers BA 5,000 component parts under Section 5(l)(a) BA 20,000 x AK47 assault rifles BA 2,500 x AK47 assault rifles BA 2,500 x AK47 assault rifles BA 2,000 x AK47 assault rifles BA 2,500 x AK47 assault rifles B A 2,000 x AK47 assault rifles BA 2,500 x AK47 assault rifles BA 2,000 x AK47 assault rifles BA 2,500 x AK47 assault rifles BA 2,000 x AK47 assault rifles BA 2,500 x AK47 assault rifles BA 2,000 x AK47 assault rifles BA 2,500 x AK47 assault rifles BA 2,000 x AK47 assault rifles BA 2,500 x AK47 assault rifles BA 2,000 x AK47 assault rifles BA 2,500 x AK47 assault rifles BA 2,000 x AK47 assault rifles BA 2,000 x AK47 assault rifles BA 2,000 x AK47 assault rifles BA 2,000 x assault rifles BA 1,000 x assault rifles BA 2,000 x AK47 assault rifles BA 3,000 x machine guns BA 20,000 x AK47 assault rifles
Coal Health (Compensation)
The figures requested for deceased claims submitted by Beresfords solicitors are set out in the following table:
Wales Scotland Wales Scotland Deceased claims submitted 6,839 3,006 11 12 Denials made 525 412 5 2
Three operational meetings have taken place since June 2005 between officials and representatives of the UDM. Two of these related to the vibration white finger scheme and the third to the respiratory disease scheme.
Company Law Reform Bill
The Bill does not define what is a proper purpose.
Under clause 116 of the Bill, a request to inspect or to be provided with a copy of a company’s register of members must include the purpose for which the information is to be used. The company must either meet the request within five working days or apply to a court. The court will direct the company not to comply with the request if it is satisfied that it is not sought for a proper purpose.
Electricity Transmission
Estimated losses through the electricity transmission and distribution networks for the period 1999 to 2003 were as follows:
GWh 1999 28298 2000 29649 2001 30902 2002 29890 2003 29862
Using the average carbon emission factor for each year provides the following estimates for the carbon emissions associated with these losses. These estimates are based on the average emissions factor for electricity generation in each of these years, which takes account of the mix between coal, gas and other forms of generation in those years.
Million tonnes of carbon 1999 3.28 2000 3.67 2001 3.95 2002 3.72 2003 3.83
Energy
Data on net imports of primary fuel are published in the annual Digest of United Kingdom Energy Statistics. Table 1.1.3 in the 2005 edition shows that, having been a net exporter of primary energy since 1993, the UK became a net importer of primary energy in 2004.
The minutes of the Sustainable Energy Policy Advisory Board (SEPAB) have now been published on the DTI website as usual. Publication was held back until the Energy Review conclusions had been announced to Parliament.
All responses to the Energy Review consultation exercise, which closed on 14 April 2006, have been posted on the DTI website at http://www. dti.gov.uk/energy/review/consultation-submissions/page27883.html.
Ofgem does not collect data about refusal to supply.
Condition 32 of the standard gas and electricity supply licences requires suppliers to offer terms at a domestic customer's request. There are a number of exclusions within these conditions. Complaints about refusal to supply may be made to the statutory gas and electricity consumer body, Energywatch. Energywatch can refer matters to the industry regulator, the Office of Gas and Electricity Markets (Ofgem) where it believes Ofgem may be able to use its power of licence enforcement.
In July 2005, the industry regulator, the Office of Gas and Electricity Markets (OFGEM) required gas and electricity suppliers to establish an independent ombudsman scheme to deal with billing disputes that had not been satisfactorily resolved under standard complaints procedures. The suppliers have now established the Energy Supply Ombudsman scheme, which was launched on 1 July 2006. The Ombudsman will handle both billing and transfer disputes, can reach decisions that are binding on suppliers and may award compensation of up to £5,000 to customers. The scheme is additional to the statutory arrangements governing the investigation of customer complaints, which continue to operate.
Despite sustained benefits from liberalised energy markets over the past decade, the Government fully appreciate that high energy prices do create problems for the competitiveness of industry, and take very seriously the potential loss of jobs and investment. The Government are leaving no stone unturned, working closely with industry, to find solutions and reduce the impact. The new Business Energy Forum, co-chaired by the Secretary of State and Richard Lambert of the CBI, met for the first time on 5 July and is monitoring this work and looking at other strategic energy issues impacting on business. Higher energy prices in the UK reflect higher global prices, caused by rising demand and supply constraints (for oil and gas), the lack of EU energy market liberalisation, and domestic factors, such as the tight winter supply demand balance in the UK gas market.
The importance of the Government’s activity in pushing for European energy market liberalisation was highlighted in a Global Insight report in 2005. The report estimated that the lack of effective liberalisation and the dominance of oil-linked long-term supply contracts in Europe would cost UK industrial consumers of gas some £2.6 billion over the following year. Ofgem analysis suggests that the cost to UK gas consumers of Interconnector flows not always being in line with price signals during the last winter was £1.5 billion and would cost £3 billion if repeated during the coming winter. The European Commission has been active in reviewing competition in gas and electricity markets.
During the past two years there have been several investigations and reports into competition in UK gas and electricity markets. These include the Ofgem gas price probe, and two inquiries from the Trade and Industry Select Committee. The Ofgem gas price probe found no evidence of anti-competitive behaviour in the UK gas market. More recently, Ofgem published a “Domestic Retail Market Report”, which concluded that, “competition remains effective and vigorous in all segments of the domestic energy market.” Independent research by Oxera concluded that in 2004 the UK had the most competitive electricity and gas markets in the EU and G7 (available at www.dti.gov.uk/files/file28425.pdf).
Enterprise Insight
The level of Government funding for Enterprise Insight in 2006-07 is £5 million.
This support enables Enterprise Insight to continue developing and running the highly successful ‘Make Your Mark’ campaign. The campaign is aimed at people aged between 14 and 30 and encourages them to be enterprising in the broadest sense.
Enterprise Week is the focal point of the campaign. Last year saw 408,000 people from all over the UK attend 2,215 events, run by 722 organisations helped by 3,874 businesses. It is anticipated that these already impressive results will be bettered during Enterprise Week 2006, which Enterprise Insight will run from 13-19 November.
The funding will also support the development of new Local Enterprise Campaign Hubs in some of the country’s most deprived and under-performing areas. In addition, the funding will support the development of partnerships to run campaigns in specific industry sectors, emphasising the role of enterprise in the successful start up and growth of companies.
As Minister for Industry and the Regions with responsibility for the Small Business Service, I met Enterprise Insight on 18 May.
The outcome of my meeting was a reaffirmed commitment that the Department will support the development and running of the ‘Make Your Mark’ campaign; and, to Ministerial participation in key events during the campaign’s flagship annual initiative of ‘Enterprise Week’, which this year will run from 13-19 November.
Further meetings with Enterprise Insight will be scheduled as the year progresses.
Gas Appliances
This is a matter for manufacturers of gas appliances, which is a competitive commercial activity.
Global Oil Production
The Government consider that the world’s oil resources are sufficient to prevent global total oil production peaking before 2030, by which time the International Energy Agency’s reference case scenario in its 2005 World Energy Outlook shows global oil demand reaching 115.4 million barrel per day, nearly 40 per cent. higher than current levels. The exact levels and years of the peaks in global conventional and total oil production will depend on assumptions about a number of factors, including the rate of global oil demand growth, the rate of investment in the global oil sector, and technological developments in finding and producing oil.
Market mechanisms will ration the remaining global supplies of oil and provide the incentive for a shift to alternative sources of energy. This process needs to be supported by Governments. The UK Government are already putting in place policies that will help ease the UK economy away from power supplied primarily through fossil fuels and is also promoting international efforts, for example through the G8 Gleneagles Plan of Action, to develop cleaner energy technologies and promote energy efficiency.
Home Heat Helpline
(2) whether the Home Heat Helpline refers callers to (a) Energywatch, (b) local energy efficiency advice centres and (c) the Energy Savings Trust;
(3) how many people have (a) received benefit entitlement checks after contacting the Home Heat Helpline and (b) been identified as eligible for a benefit following a benefit entitlement check.
The Home Heat Helpline was established by the Energy Retail Association on behalf of gas and electricity suppliers. The Government supported the introduction of the Helpline, but is not involved in its funding or its administration. Questions about its operations are, therefore, entirely for the Association.
Liquefied Petroleum Gas Market
No such estimates have been made, as the successful functioning of consumer markets, and market investigations when required, are matters for the independent competition authorities rather than for the Government.
Manufacturing Forum
The membership of the Manufacturing Forum is:
Kevin Smith CBE, Chief Executive, GKN plc
Margaret Hodge MBE MP, Minister of State for Industry and the Regions
Ian McCafferty, Chief Economic Adviser, CBI
Nick Brayshaw, Chairman, CBI Manufacturing Council
Martin Temple CBE, Director General, EEF
Harald Krueger, Plant Director, BMW Hams Hall
Dr. Bryan Jackson OBE, Chair, East Midlands Development Agency
Allan Cook, Chief Executive, Cobham plc
Paul Lester, Chief Executive, VT Group
Steve Musgrave, Vice President Technical Operations, GSK plc
Dawn Gibbins MBE, Chairman, Flowcrete Group plc
John Wall, General Secretary, Confederation of Shipbuilding and Engineering Unions
Peter Booth, National Organiser, T&G
Phil Davies, National Secretary, GMB
Tim Page , Senior Policy Officer, TUC
Jim Brathwaite CBE, Chair, South East England Regional Development Agency
Professor Mike Gregory CBE, Head, Institute for Manufacturing, University of Cambridge
Simon Edmonds, Director, Business Relations, DTI
Vicky Pryce, Chief Economic Adviser, DTI
Eleanor Mack, Head of Enterprise Team, HM Treasury
Greg Dyche, Deputy Director, Skills Group, Department for Education and Skills
Emily Thomas, Special Adviser, DTI
Geoffrey Norris, Senior Policy Adviser, Prime Minister's Office.
Remit of Manufacturing Forum
The Manufacturing Forum is jointly chaired by Government and Industry and was established following the review of the Government's Manufacturing Strategy in 2004. The Forum facilitates ongoing advice from key industry partners to ensure the effective implementation and evolution of the Government's Manufacturing Strategy.
Manufacturing Media Centre
The Manufacturing Forum Secretariat, which includes officials from the DTI, is working with stakeholders to establish the Manufacturing Media Centre (MMC). The MMC will cost approximately £300,000 per annum and will be funded by contributions from the manufacturing community, mainly from industry. It is planned to launch the MMC by the end of 2006.
Minimum Wage
Data at the parliamentary constituency level are not available.
However, the DTI estimates that around 120,000 in the North West stood to benefit from the October 2005 uprating of the national minimum wage.
Nuclear Decommissioning Authority
Matters such as the potential for conflicts of interest arising as a consequence of membership of the Boards of public bodies are taken fully into account during the recruitment process. The DTI press release of 13 October 2004 announcing the appointment of the Nuclear Decommissioning Authority’s non executive Board members provided detail on their other appointments and interests. In addition, public bodies maintain records of Board members’ interests.
Nuclear Power
[holding answer 3 July 2006]: The Government have worked closely with the Devolved Administrations throughout the Energy Review on all the areas of devolved responsibility, including planning.
The Government's report on the Review, “Our Energy Challenge”, was released on 11 July 2006. It is available on the DTI website at:
www.dti.gov.uk/energy/review
[holding answer 14 July 2006]: The information requested is as follows.
£000 2001-02 1,590 2002-03 1,814 2003-04 2,216 2004-05 2,332 2005-06 2,447
The answer of 4 July 2006, Official Report, columns 910-11W referred to the charges made to recover the costs of regulatory services from those who received them. The figures in the table are total operating costs. The difference between total operating costs and fees charged (as stated on 4 July) is the net funding provided by DTI to cover the cost of work that falls outside the scope of The Nuclear Industries Security (Fees) Regulations and which therefore cannot be charged to industry. Office for Civil Nuclear Security (OCNS) activity covered by net funding includes, for example, policy advice within government, work on proposed future legislation and international work.
Nuclear Safety Directorate
Warnings are not a feature of the regulatory regime enforced by HSE’s Nuclear Safety Directorate. However, should there be a need for enforcement action enforcement notices are issued accordingly.
I am informed that HSE has issued 11 improvement notices to British Energy during the last five years.
Oil Imports
In 2005 the UK became a net importer of crude oil (including Natural Gas Liquids (NGLs) and feedstocks), on an annual volume basis, for the first time since 1992. However, net exports of refined oil products meant that the UK remained a net exporter of overall oil (crude, NGLs, feedstocks, and refined products). Details are given in tables 3.1 and 3.2 of the June 2006 version of UK Energy Trends available at http://www.dti.gov.uk/energy/statistics/publications/trends/index.html.
With the large Buzzard Field due on-stream in late 2006, the UK should return to being a net exporter of crude oil (including NGLs and feedstocks) by 2007 before becoming a net importer on a sustained annual basis by 2010.
Petrol Prices
Information on the typical UK monthly retail price of petrol is given in Table 4.1.1 of the DTI’s Quarterly Energy Prices publication (http://www.dti.gov.uk/energy/statistics/publications/prices/index.html).
The rise in petrol prices since the start of the year reflects increases in the price of crude oil on the global market. In response, the Government are continuing to promote international efforts to improve the functioning of the global oil market and to tackle market inefficiencies that contribute to high and volatile crude oil prices.
Peugeot Plant (Ryton)
The Government are aware that discussions are on-going between Peugeot Citroen and the trade unions regarding the company's announcement that its Ryton plant will close, but the conduct of those discussions is a matter between the company and the unions.
The Government have made clear to Peugeot Citroen the importance of engaging in meaningful consultation with the trade unions, consistent with their obligations under information and consultation legislation, including giving due consideration to the unions' alternative proposals for the future of Ryton.
Power Stations
The Government have put in place a competitive market-based framework that incentivises generators to maximise their productivity. The conclusions of the 2006 Energy Review set out proposals for further improvements to the generation market so as better to achieve the 2003 Energy White Paper goals.
Details of planned major new investments in electricity generation, including gas-fired power stations, can be found in table 2 of the annex to my right hon. Friend the Secretary of State’s second report to Parliament on security of gas and electricity supply in Great Britain. The report was published on 11 July and can be found both in the Libraries of the House and on the Department’s website at http://www.dti.gov.uk/files/file31630.pdf.
It is important to note that approval of the consents listed in the table does not guarantee that all, or indeed any, of these projects will actually be built.
Table 5.10 of the latest “Digest of United Kingdom Energy Statistics” (http://www.dti. gov.uk/energy/statistics/source/electricity/pagel8527. html) lists the average thermal efficiencies of large power stations by fuel type. The technical and economic efficiencies of power stations are a commercial matter for generators.
Renewable Energy
In the United Kingdom in 2004 1.8 per cent. of inland consumption of primary fuels and equivalents for energy use and 3.6 per cent. of electricity generation was from renewable sources.
The amount of electricity generated from renewable sources in Scotland, Wales, Northern Ireland and each region of England in 2004 was as follows:
GWh England 7,111.9 East Midlands 625.7 East 1,583.4 North East 417.0 North West 1,014.8 London 389.9 South East 1,209.5 South West 518.2 West Midlands 651.0 Yorkshire and the Humber 702.6 Wales 1,044.0 Scotland 5,853.6 Northern Ireland 148.5 Other sites1 9.4 Total 14,167.1 Solar photovoltaics 4.0 UK total 14,171.1 1 Other sites are sites that have not been attributed to a region so that data related to individual companies are not disclosed when the breakdown by technology is shown in the source table. Source: DTI Energy Trends, September 2005 Page 24.
Similar statistics for the generation from all sources are not available for the regions of England since this would disclose data for individual companies given to the Department in confidence so percentages for the English regions cannot be calculated. However, percentages for Scotland, Wales, Northern Ireland and England as a whole are as follows:
Percentage Scotland 11.48 Wales 2.96 Northern Ireland 2.00 England 2.36 United Kingdom 3.58 Source: DTI Energy Trends December 2005, page 44.
Regional data covering all energy use are produced only for consumption and not for supply. This is because energy produced in one part of the UK may not be consumed in the same part of the UK given that we have national transmissions systems for gas and electricity, and coal and oil products are distributed from mines and refineries to all parts of the country.
There are currently 54 wind farms in England, of those three are offshore with a capacity of nearly 154 MW and 51 are onshore with a capacity of nearly 246 MW.
It is not possible to say how many wind farms, on or offshore are planned to be built in the next five years as a number of complex and, as yet, unseen, factors may come into play. However, the following information has been obtained from the British Wind Energy Association:
Number Currently under construction Seven onshore wind farms with a capacity of 79.5 MW and one offshore wind farm with a capacity of 90 MW. Consented projects 35 onshore wind farms with a capacity of 537.70 MW and four offshore wind farms with a capacity of 486 MW. Projects in planning 51 onshore wind farms with a capacity of 938 MW and 10 offshore wind farms with a capacity of 4283 MW.
Royal Mail
Royal Mail has submitted proposals on an employee share ownership scheme and these proposals are currently under consideration by the Department. Ministers and officials meet Royal Mail representatives on a regular basis and have discussed these proposals with them. No decisions have been made on whether to introduce a share scheme.
South East England Development Agency
[holding answer 10 July 2006]: The tables show the South East England Development Agency’s (SEEDA) annual spend from 2003 onwards, broken down to a sub regional level.
SEEDA does not provide expenditure breakdowns on the basis of all counties and unitary authorities within the region.
Before the adoption of their current financial records system in 2003, expenditure by specific geographical or administrative areas was not recorded and it is therefore not possible to produce a disaggregated account of SEEDA spend prior to that time.
Much of SEEDA’s spend is allocated across administrative boundaries, and this cannot be disaggregated to local authority boundaries levels.
Sub-region Spend 2003-04 (£) Programme expenditure(percentage of annual budget) Expenditure per head (£) Berkshire Unitary Authorities 4,626,483.75 3.67 5.78 Buckinghamshire and Milton Keynes 1,614,422.01 1.28 3.37 East Sussex, Brighton and Hove 25,399,943.64 20.12 34.32 Hampshire, Portsmouth, Southampton and Isle of Wight 40,665,609.35 32.21 22.88 Kent and Medway 25,244,668.59 20.00 15.99 Oxfordshire 5,118,297.72 4.05 6.30 Surrey 760,227.82 0.60 0.72 West Sussex 3,248,602.91 2.57 4.31 Regionwide and Cross Region 19,554,744.20 15.49 n/a Total 126,233,000.00 100.00 —
Sub-region Spend 2004-05 (£) Programme expenditure(percentage of annual budget) Expenditure per head (£) Berkshire Unitary Authorities 2,230,595.85 2.02 2.79 Buckinghamshire and Milton Keynes 2,877,112.59 2.60 6.01 East Sussex, Brighton and Hove 19,938,380.28 18.04 26.94 Hampshire, Portsmouth, Southampton and Isle of Wight 19,240,442.98 17.41 10.83 Kent and Medway 39,055,557.44 35.34 24.73 Oxfordshire 4,399,289.72 3.98 5.41 Surrey 836,594.35 0.76 0.79 West Sussex 2,673,723.77 2.42 3.55 Regionwide and Cross Region 19,256,303.04 17.43 n/a Total 110,508,000.00 100.00 —
Sub-region Spend 2005-06 (£) Programme expenditure(percentage of annual budget) Expenditure per head (£) Berkshire Unitary Authorities 4247471.04 2.68 5.31 Buckinghamshire and Milton Keynes 1,867,303.21 1.18 3.90 East Sussex, Brighton and Hove 22,174,844.97 13.98 29.96 Hampshire, Portsmouth, Southampton and Isle of Wight 38,236,206.41 24.10 21.52 Kent and Medway 36,545,375.53 23.04 23.14 Oxfordshire 5,564,708.01 3.51 6.85 Surrey 4,376,371.19 2.76 4.13 West Sussex 8,630,872.87 5.44 11.45 Regionwide and Cross Region 36,996,847.49 23.32 n/a Total 158,640,000.72 100.00 — Note: Please note per capita expenditure has been calculated using population figures from the Rural Urban Spreadsheet tool (based on 2001 census).
Spam E-mails
The Government introduced statutory controls on spam emails by means of the Privacy and Electronic Communications (EC Directive) Regulations 2003, which were enacted on 11 December 2003. The regulations provide a first line of defence against spam originating in the EU where the recipient has no knowledge of the advertiser of the products being marketed. The regulations require that spam must not be sent to an individual subscriber without prior permission or unless there is a previous relationship between the parties. The regulations can be enforced against an offending company or individual anywhere in the EU. There is regular contact between my Department, the Department for Constitutional Affairs and the Information Commissioner’s Office on the operation of these regulations.
The Government recognise that most spam does not come from the UK and have therefore extensively promoted international co-operation. A Memorandum of Understanding was agreed on 2 July 2004 between the enforcement authorities of the United Kingdom, United States and Australia, to reduce the problem by working together to investigate those sending spam. The UK also plays a leading role in Organisation for Economic Co-operation and Development (OECD)’s Anti Spam Task Force and other multilateral initiatives. In late 2004, the UK launched the world’s first and only anti-spam enforcement network, the London Action Plan, which now spans five continents and includes authorities and industry from countries particularly affected by this issue, such as Nigeria, China and India.
The end user has a role to play in acting to avoid being a target for those sending spam, as well as acting to filter spam. Information has been made available to the public and to business by the DTI, the Information Commissioner’s Office, the Office of Fair Trading as well as a number of sites provided by service and software providers. These messages have been reinforced by the Get Safe Online initiative launched on 27 October 2005. This is an initiative between Government and Industry to help individuals and businesses protect themselves against internet threats, including spam.
Our response to the problem of spam continues to develop. I have taken careful note of the views of the Information Commissioner’s Office on the powers available to him, and DTI officials are working with the Information Commissioner’s Office on this matter. The Government are actively considering whether to revise the relevant legislation. DTI officials have a continuing dialogue with internet service providers regarding steps that can be taken to reduce spam. We also continue our efforts to achieve greater international co-operation.
Strikes
In the 12 months to May 2006, there were 131 stoppages in the UK, compared to 121 stoppages in the 12 months to May 2005.
Between May 1997 and May 2002, the lowest number of stoppages in any 12 consecutive months was 189, in the 12 months to August 1999.
Structural Funds
As set out in the written statement to Parliament of 20 December 2005, Official Report, columns 203-06WS. Merseyside will receive phasing-in funding under the Regional Competitiveness and Employment Objective for 2007-13. This will amount to approximately one-third of its allocation as an Objective 1 area over the period 2000-06.
The rest of the North West, along with the other areas of the UK not eligible for Convergence funding (the successor to Objective 1) under the next round of Structural Funds from 2007-13, will be eligible for support under the Regional Competitiveness and Employment Objective. These areas will receive a total of approximately €6.2 billion in Structural Funds over this period.
The Department of Trade and Industry has recently carried out a public consultation on a draft National Strategic Reference Framework for future Structural Funds spending. As part of the consultation, we sought stakeholders’ views on the methodology for allocating part of the UK’s Competitiveness funds. In reaching a final decision on this issue, the Government will, of course, want to take full account of the needs of the North West and all other eligible regions.
Sustainability
I have been asked to reply.
In October 2005, Defra funded Forum for the Future to engage with a range of professional bodies on sustainability issues. The project, Professions in Partnership for Sustainability, will work with professional bodies to embed sustainable competencies into their professional standards.
The project is worth up to £75,000 and will last until the end of the financial year 2006-07. No decisions have been taken yet on funding beyond the end of 2006-07.
Television Licences
The decision to withdraw the purchase of TV licences from post offices was a commercial one made by the BBC which has a duty to TV licence holders to achieve value for money with its licence fee income. Although customers will not be able to pay for their TV licences at post offices after 31 July, they will be able to purchase TV licences by direct debit, online or at over 15,000 ‘Paypoint’ facilities situated around the country in local newsagents, convenience stores, supermarkets, and petrol stations.
Waste Disposal
It was certainly never envisaged that these directives would apply to church and other pipe organs, although there was some legal uncertainty in the final text.
Following the meeting held in Brussels on 26 June, the European Commission has clarified that pipe organs are outside the scope of the new rules.
I am, therefore, very pleased to confirm that the legal uncertainties have now been resolved and pipe organs are considered to be clearly outside the scope of the restriction of hazardous substances (RoHS) and waste electrical and electronic equipment (WEEE) directives.
Zimbabwe
There has been a substantial fall in UK-Zimbabwe trade in recent years. In 2000, UK and Zimbabwe two-way trade amounted to £143 million. Imports from Zimbabwe were mainly agricultural products with tobacco, making up approximately 31 per cent. of the total imports. Exports were mainly manufactured goods, with office machines and ADP equipment topping the table at £5.3 million.
By 2005, two-way trade had fallen to £66 million. The principal change was in tobacco imports, which fell to £4.8 million from £31 million in 2000 down 85 per cent. Exports also fell, with the leading export, road vehicles, topping the table at £3.5 million. The decline in trade can be attributed to the policies of the Government of Zimbabwe which have brought about the fall of both imports and exports.
A breakdown of UK exports and imports by sector for 2004 and 2005 is shown in the following table.
HMG have not imposed any economic sanctions or restrictions on doing business in Zimbabwe and two-way trade continues, although as the aforementioned figures show, at a substantially reduced level. It is our view that economic sanctions would harm the people of Zimbabwe at a time of humanitarian crisis, while having very little impact on the ZANU (PF) leadership. The people of Zimbabwe have suffered enough.
Division and description £000 Top 10 UK exports 2004 75 Office machines and ADP equipment 4,878 78 Road vehicles 4,563 76 Telecommunications and sound recording and reproducing apparatus 2,648 72 Specialised industrial machinery 1,807 74 General industrial machinery and equipment, nes and machine parts nes 1,590 77 Electrical machinery, apparatus and appliances, nes and electrical parts thereof 1,111 71 Power generating machinery and equipment 899 87 Professional, scientific and control instruments (and apparatus nes) 557 67 Iron and steel 505 26 Textile fibres 498 Total of top 10 19,056 Total trade 26,005 2005 78 Road vehicles 3,473 75 Office machines and ADP equipment 3,379 72 Specialised industrial machinery 2,370 76 Telecommunications and sound recording and reproducing apparatus 1,545 74 General industrial machinery and equipment, nes and machine parts nes 1,528 71 Power generating machinery and equipment 1,238 00 Live animals other than of Div. 03 740 26 Textile fibres 716 87 Professional, scientific and control instruments (and apparatus nes) 702 77 Electrical machinery, apparatus and appliances, nes and electrical parts thereof 670 Total of top 10 16,362 Total trade 22,113 Top 10 UK imports 2004 06 Sugar, sugar preparations and honey 22,554 05 Vegetables and fruit 8,185 12 Tobacco and tobacco manufactures 8,182 82 Furniture and parts thereof; bedding, mattresses, supports, cushions and similar stuffed furnishings 1,675 66 Non-metallic mineral manufactures 1,256 07 Coffee, tea, cocoa, spices and manufactures thereof 1,212 68 Non-ferrous metals 956 65 Textile yarn, fabrics, made-up articles, nes 935 76 Telecommunications and sound recording and reproducing apparatus 464 29 Crude animal and vegetable materials 317 Total of top 10 45,736 Total trade 47,779 2005 66 Non-metallic mineral manufactures 14,970 06 Sugar, sugar preparations and honey 13,087 05 Vegetables and fruit 7,182 12 Tobacco and tobacco manufactures 4,768 82 Furniture and parts thereof; bedding, mattresses, supports, cushions and similar stuffed furnishings 912 07 Coffee, tea, cocoa, spices and manufactures thereof 495 65 Textile yarn, fabrics, made-up articles, nes 374 67 Iron and steel 217 84 Articles of apparel and clothing accessories 144 79 Other transport equipment 117 Total of top 10 42,266 Total trade 43,564 Source: DTI Analysis of HM Revenue and Customs data.